HQ085621F0004↗
Northrop Grumman Systems Corporation received this contract from Dcma Missiles, Missile Defense Agency: $19.10M obligated so far for guided missile components. It runs to 2027-02-20.
Key facts · data as of Oct 26, 2026
- Recipient
- Northrop Grumman Systems Corporation
- Awarding agency
- Missile Defense Agency (Department of Defense)
- Contracting office
- Dcma Missiles (S4420A)
- Obligated to date
- $19.10M
- Potential value
- $196.30M
- Ends
- 2027-02-20
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 26, 2026.
Cite this page: SpendQuery, Award HQ085621F0004, data as of Oct 26, 2026, https://spendquery.com/award?id=CONT_AWD_HQ085621F0004_9700_HQ085621D0001_9700
Northrop Grumman Systems Corporation: all federal awards · Department of Defense: spending · Dcma Missiles: what it buys · The follow-on: recompete brief
GMD BOOST VEHICLES
Up for re-bid: ends 2027-02-20. Recompete brief →
What it is
- Product or service
- Guided Missile Components (PSC 1420)
- Industry
- Research and Development in the Physical, Engineering, and Life Sciences (Except Nanotechnology and Biotechnology) (NAICS 541715)
- Contracting office
- Dcma Missiles (S4420A)
- Competition
- Not competed
- Pricing
- Fixed price incentive
- How it was bought
- Single-award IDIQ · under HQ085621D0001
- Solicitation
- HQ085621R0006
- Where the work is
- Maricopa, AZ · district AZ-05
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
295 subawards totaling $66.31M (347.1% of what was obligated), as Northrop Grumman Systems Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Metalex Manufacturing Inc | $17.72M | 36 | OH | 2022-12-01 | 2023-10-25 |
| Arrow Electronics, Inc. | $9.18M | 8 | NY | 2022-12-15 | 2022-12-15 |
| Avnet Inc | $6.30M | 44 | AZ | 2022-10-26 | 2024-09-16 |
| Jabil Defense and Aerospace Services, LLC | $4.79M | 4 | CO | 2023-04-12 | 2023-11-22 |
| Resideo Technologies, Inc. | $4.43M | 1 | FL | 2023-10-04 | 2023-10-04 |
| Asb Aerospatiale Batteries | $4.39M | 7 | MD | 2022-12-14 | 2022-12-14 |
| Jabil Inc | $2.97M | 8 | CO | 2023-04-12 | 2023-04-21 |
| Powell Electronics, Inc. | $2.31M | 17 | CA | 2022-11-28 | 2023-02-06 |
| Heico Corp | $1.78M | 12 | AZ, VA | 2023-04-13 | 2024-10-31 |
| Eaglepicher Technologies LLC | $1.75M | 1 | MO | 2023-10-02 | 2023-10-02 |
| Eckert Enterprises, LTD. | $1.62M | 24 | AZ | 2022-11-28 | 2023-11-20 |
| Woodward Inc. | $1.61M | 2 | IL | 2023-09-25 | 2024-08-09 |
| Admiral Engineering & MFG. Co. | $1.48M | 6 | AZ | 2023-03-14 | 2023-05-15 |
| Ai Convoy Topco & Cy S.C.A. | $1.47M | 12 | CO, NY | 2022-12-05 | 2023-02-27 |
| Micro Craft Inc | $1.31M | 9 | TN | 2022-11-17 | 2022-11-17 |
| Acme Metal Works Inc | $1.06M | 13 | AZ | 2023-03-09 | 2024-01-27 |
| Amro Fabricating Corp | $1.00M | 3 | CA | 2023-05-22 | 2023-05-22 |
| Marotta Controls Inc | $729.8K | 5 | NJ | 2023-03-09 | 2023-03-09 |
| Tti Inc. | $628.5K | 5 | TX | 2023-03-14 | 2023-03-14 |
| Advanced Thermal Batteries Inc | $627.0K | 1 | MD | 2022-12-14 | 2022-12-14 |
| TTM Technologies, Inc. | $545.0K | 4 | OH | 2023-03-07 | 2023-03-07 |
| Dynamic Machine & Fabrication Corp | $543.0K | 7 | AZ | 2023-03-03 | 2023-06-19 |
| Moog Inc | $537.0K | 1 | CA | 2023-11-07 | 2023-11-07 |
| Electro Enterprises Inc | $531.7K | 4 | OK | 2022-10-11 | 2022-10-11 |
| Pioneer Circuits, Inc | $514.5K | 6 | CA | 2022-10-11 | 2022-10-11 |
The 25 largest of 44; the rest are on USAspending.gov.
The largest single subawards
| Date | To | Amount | For |
|---|---|---|---|
| 2023-10-04 | Honeywell International Inc. | $4.43M | 334511 SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING |
| 2023-04-12 | Jabil Defense and Aerospace Services, LLC | $2.45M | ENTER DETAILED INFORMATION |
| 2023-04-12 | Jabil Defense and Aerospace Services, LLC | $2.45M | ENTER DETAILED INFORMATION |
| 2023-11-22 | Jabil Defense and Aerospace Services, LLC | $2.19M | 334418 PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING |
| 2023-10-02 | Eaglepicher Technologies LLC | $1.75M | 335910 BATTERY MANUFACTURING |
| 2022-12-15 | Arrow Electronics, Inc. | $1.15M | UCKT, LIN, INSTRUMENT. AMPLIFIER, AD524SE, 20 LCC |
| 2022-12-15 | Arrow Electronics, Inc. | $1.15M | UCKT, LIN, INSTRUMENT. AMPLIFIER, AD524SE, 20 LCC |
| 2022-12-15 | Arrow Electronics, Inc. | $1.15M | UCKT, LIN, INSTRUMENT. AMPLIFIER, AD524SE, 20 LCC |
| 2022-12-15 | Arrow Electronics, Inc. | $1.15M | UCKT, LIN, INSTRUMENT. AMPLIFIER, AD524SE, 20 LCC |
| 2022-12-15 | Arrow Electronics, Inc. | $1.15M | UCKT, LIN, INSTRUMENT. AMPLIFIER, AD524SE, 20 LCC |
| 2022-12-15 | Arrow Electronics, Inc. | $1.15M | UCKT, LIN, INSTRUMENT. AMPLIFIER, AD524SE, 20 LCC |
| 2022-12-15 | Arrow Electronics, Inc. | $1.15M | UCKT, LIN, INSTRUMENT. AMPLIFIER, AD524SE, 20 LCC |
| 2022-12-01 | Metalex Manufacturing Inc | $1.11M | RING ASSY, UPPER BASE |
| 2022-12-01 | Metalex Manufacturing Inc | $1.11M | RING ASSY, UPPER BASE |
| 2022-12-01 | Metalex Manufacturing Inc | $1.11M | RING ASSY, UPPER BASE |
| 2022-12-01 | Metalex Manufacturing Inc | $1.11M | RING ASSY, UPPER BASE |
| 2022-12-01 | Metalex Manufacturing Inc | $1.11M | RING ASSY, UPPER BASE |
| 2022-12-01 | Metalex Manufacturing Inc | $1.11M | RING ASSY, UPPER BASE |
| 2022-12-01 | Metalex Manufacturing Inc | $1.11M | RING ASSY, UPPER BASE |
| 2022-12-01 | Metalex Manufacturing Inc | $1.11M | RING ASSY, UPPER BASE |
| 2022-12-15 | Arrow Electronics, Inc. | $1.10M | UCKT, LIN, INSTRUMENT. AMPLIFIER, AD524SE, 20 LCC |
| 2024-08-09 | MPC Products Corporation | $805.7K | 336419 OTHER GUIDED MISSILE AND SPACE VEHICLE PARTS AND AUXILIARY EQUIPMENT MANUFACTURING |
| 2023-09-25 | Woodward, Inc. | $805.7K | 336419 GUIDED MISSILE AND SPACE VEHICLE PARTS AND AUXILIARY EQUIPMENT MANUFACTURING |
| 2022-12-01 | Metalex Manufacturing Inc | $659.7K | STRUCTURE ASSEMBLY, INTERSTAGE |
| 2022-12-01 | Metalex Manufacturing Inc | $659.7K | STRUCTURE ASSEMBLY, INTERSTAGE |
Every action
27 actions since 2022-11-09. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-01-06 | P00029 | Administrative change | $1.51M | PROCUREMENT OF BOOST VEHICLES (BVS) AND SPARE BV COMPONENTS. REPAIR, UPGRADE, AND TEST BVS, MAINTAIN SOFTWARE AND HARDWARE TOSUPPORT THE GROUND BASED INTERCEPTOR (GBI) FLEET. ENGINEERINGAND MANUFACTURING TO ADDRESS OBSOLESCENCE AND MAINTENANCE |
| 2025-10-24 | P00028 | Administrative change | $0 | PROCUREMENT OF BOOST VEHICLES (BVS) AND SPARE BV COMPONENTS. REPAIR, UPGRADE, AND TEST BVS, MAINTAIN SOFTWARE AND HARDWARE TOSUPPORT THE GROUND BASED INTERCEPTOR (GBI) FLEET. ENGINEERINGAND MANUFACTURING TO ADDRESS OBSOLESCENCE AND MAINTENANCE |
| 2025-10-20 | P00027 | Administrative change | $0 | PROCUREMENT OF BOOST VEHICLES (BVS) AND SPARE BV COMPONENTS. REPAIR, UPGRADE, AND TEST BVS, MAINTAIN SOFTWARE AND HARDWARE TOSUPPORT THE GROUND BASED INTERCEPTOR (GBI) FLEET. ENGINEERINGAND MANUFACTURING TO ADDRESS OBSOLESCENCE AND MAINTENANCE |
| 2025-10-15 | A00001 | Supplemental agreement (work within scope) | $0 | ADDED DFARS CLAUSE |
| 2025-09-23 | P00026 | Change order | $2.09M | PROCUREMENT OF BOOST VEHICLES (BVS) AND SPARE BV COMPONENTS. REPAIR, UPGRADE, AND TEST BVS, MAINTAIN SOFTWARE AND HARDWARE TOSUPPORT THE GROUND BASED INTERCEPTOR (GBI) FLEET. ENGINEERINGAND MANUFACTURING TO ADDRESS OBSOLESCENCE AND MAINTENANCE |
| 2025-08-11 | P00025 | Administrative change | $0 | PROCUREMENT OF BOOST VEHICLES (BVS) AND SPARE BV COMPONENTS. REPAIR, UPGRADE, AND TEST BVS, MAINTAIN SOFTWARE AND HARDWARE TOSUPPORT THE GROUND BASED INTERCEPTOR (GBI) FLEET. ENGINEERINGAND MANUFACTURING TO ADDRESS OBSOLESCENCE AND MAINTENANCE |
| 2025-07-24 | P00024 | Change order | $62.4K | PROCUREMENT OF BOOST VEHICLES (BVS) AND SPARE BV COMPONENTS. REPAIR, UPGRADE, AND TEST BVS, MAINTAIN SOFTWARE AND HARDWARE TOSUPPORT THE GROUND BASED INTERCEPTOR (GBI) FLEET. ENGINEERINGAND MANUFACTURING TO ADDRESS OBSOLESCENCE AND MAINTENANCE |
| 2025-06-17 | P00023 | Change order | $0 | PROCUREMENT OF BOOST VEHICLES (BVS) AND SPARE BV COMPONENTS. REPAIR, UPGRADE, AND TEST BVS, MAINTAIN SOFTWARE AND HARDWARE TOSUPPORT THE GROUND BASED INTERCEPTOR (GBI) FLEET. ENGINEERINGAND MANUFACTURING TO ADDRESS OBSOLESCENCE AND MAINTENANCE |
| 2025-05-15 | P00022 | Change order | $1.29M | PROCUREMENT OF BOOST VEHICLES (BVS) AND SPARE BV COMPONENTS. REPAIR, UPGRADE, AND TEST BVS, MAINTAIN SOFTWARE AND HARDWARE TOSUPPORT THE GROUND BASED INTERCEPTOR (GBI) FLEET. ENGINEERINGAND MANUFACTURING TO ADDRESS OBSOLESCENCE AND MAINTENANCE |
| 2025-02-11 | P00021 | Administrative change | $0 | PROCUREMENT OF BOOST VEHICLES (BVS) AND SPARE BV COMPONENTS. REPAIR, UPGRADE, AND TEST BVS, MAINTAIN SOFTWARE AND HARDWARE TO SUPPORT THE GROUND BASED INTERCEPTOR (GBI) FLEET. ENGINEERING AND MANUFACTURING TO ADDRESS OBSOLESCENCE AND MAINTENANCE. |
| 2024-12-10 | P00020 | Supplemental agreement (work within scope) | $0 | PROCUREMENT OF BOOST VEHICLES (BVS) AND SPARE BV COMPONENTS. REPAIR, UPGRADE, AND TEST BVS, MAINTAIN SOFTWARE AND HARDWARE TO SUPPORT THE GROUND BASED INTERCEPTOR (GBI) FLEET. ENGINEERING AND MANUFACTURING TO ADDRESS OBSOLESCENCE AND MAINTENANCE. |
| 2024-11-26 | P00019 | Change order definitized | $1.01M | PROCUREMENT OF BOOST VEHICLES (BVS) AND SPARE BV COMPONENTS. REPAIR, UPGRADE, AND TEST BVS, MAINTAIN SOFTWARE AND HARDWARE TO SUPPORT THE GROUND BASED INTERCEPTOR (GBI) FLEET. ENGINEERING AND MANUFACTURING TO ADDRESS OBSOLESCENCE AND MAINTENANCE. |
| 2024-10-24 | P00018 | Funding only | $550.0K | 75% FUNDING OF MOTOR DRIVER HYBRID UCO NTE |
| 2024-09-25 | P00017 | Supplemental agreement (work within scope) | $236.2K | DELIVERY OF BOOST VEHICLES |
| 2024-08-27 | P00016 | Supplemental agreement (work within scope) | -$1.92M | REMOVE EXCESS FUNDING/VALUE, ADD SBPCD |
| 2024-08-05 | P00015 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO UPDATE DCMA FIELD OFFICE ADDRESS |
| 2024-07-26 | P00014 | Administrative change | $0 | ADMIN MODIFICATION TO CORRECT DCMA ADDRESS |
| 2024-06-14 | P00013 | Supplemental agreement (work within scope) | -$1.06M | CCP-003B/CCP-002 |
| 2024-04-29 | P00012 | Change order | $1.00M | AUTHORITY TO PROCEED UNDER UNPRICED CHANGED ORDER AUTHORITY FOR LESS THAN HALF OF THE NOT TO EXCEED (NTE) VALUE FOR THE INITIATION OF DESIGN, ASSEMBLY, QUALIFICATION, TESTING, PROCUREMENT, AND DELIVERY OF MOTOR DRIVE HYBRID CIRCUIT CARDS. |
| 2024-04-15 | P00011 | Administrative change | $0 | UPDATE CDRLS A002 AND A068 |
| 2024-03-25 | P00010 | Supplemental agreement (work within scope) | $0 | REMOVE SMALL BUSINESS SUBCONTRACTING PLAN ATTACHMENT J-05 |
| 2024-01-25 | ARZ996 | Supplemental agreement (work within scope) | $0 | RESEARCH AND DEVELOPMENT CONTRACTS |
| 2023-09-26 | P00009 | Change order | $3.98M | DELIVERY OF BOOST VEHICLES |
| 2023-07-27 | P00008 | Change order | $1.92M | DELIVERY OF BOOST VEHICLES |
| 2023-02-01 | P00007 | Change order | $0 | DELIVERY OF BOOST VEHICLES |
| 2022-12-05 | P00006 | Administrative change | $0 | DELIVERY OF BOOST VEHICLES - ADD PERFORMANCE-BASED PAYMENTS CLAUSE. |
| 2022-11-09 | P00005 | Change order | $8.43M | DELIVERY OF BOOST VEHICLES |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-26). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗