M6785416C0006↗

Bae Systems Land and Armaments L.P. received this contract from Commander, Department of the Navy: $2.17B obligated so far for r&d- defense system: tank/automotive (engineering development). It runs to 2028-06-30.

Key facts · data as of Oct 21, 2026

Recipient
Bae Systems Land and Armaments L.P.
Awarding agency
Department of the Navy (Department of Defense)
Contracting office
Commander (M67854)
Obligated to date
$2.17B
Potential value
$456.92M
Ends
2028-06-30

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 21, 2026.

Cite this page: SpendQuery, Award M6785416C0006, data as of Oct 21, 2026, https://spendquery.com/award?id=CONT_AWD_M6785416C0006_9700_-NONE-_-NONE-

IGF::OT::IGF

Definitive Contract · Department of the Navy · to Bae Systems Land and Armaments L.P. (UEI D2ETMTLWJCJ1) · data as of 2026-10-21

Obligated to date$2.17B257 actions
Current value$446.29Mwith options exercised
Potential value$456.92Mif every option is used
Period2015-11-24 → 2028-06-30current end date
Passed on$707.36Mto 120 subcontractors

Up for re-bid: ends 2028-06-30. Recompete brief →

What it is

Product or service
R&D- Defense System: Tank/Automotive (Engineering Development) (PSC AC44)
Industry
Military Armored Vehicle, Tank, and Tank Component Manufacturing (NAICS 336992)
Contracting office
Commander (M67854)
Competition
Full and open competition · 5 offers received
Pricing
Cost plus fixed fee
How it was bought
Standalone contract
Solicitation
M6785415R0001
Where the work is
York, PA · district PA-10
Funding law
Other emergency or disaster supplementals

Obligations by fiscal year

FY2023$481.03M
FY2024$491.26M
FY2025$579.19M
FY2026$616.20M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

1234 subawards totaling $707.36M (32.6% of what was obligated), as Bae Systems Land and Armaments L.P. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.

SubcontractorAmountSubawardsWhereFirstLast
Iveco Sued - West Nutzfahrzeuge GMBH$214.25M462022-12-092025-04-30
Iveco Defence Vehicles S.P.A.$211.88M30BLZ2022-10-262026-07-15
Lanzen, Incorporated$38.17M189MI2022-10-252026-07-26
The First Electronics Corporation$29.16M60MA2022-10-072026-05-26
Leading Technology Composites, Inc$28.73M15KS2022-10-102026-06-18
Crane Pumps & Systems PFT Corp$16.63M10OH2022-10-242026-05-29
Leonardo S.P.A.$11.91M12AL, FL2022-12-222026-05-26
Kidde Technologies Inc$9.69M22NC2023-04-242025-08-28
HDT Expeditionary Systems Inc$9.33M16KY, OH2023-02-222026-06-15
American Tooling Center Inc$8.28M30MI2023-01-182026-07-16
Total Sa$7.89M14NJ2022-11-072025-09-26
RTX Corp$7.48M6NC2022-10-272026-06-05
Marvin Engineering Co, Inc$7.43M4CA2022-11-222024-01-30
Staver Hydraulics Co., Inc.$5.57M52PA2022-10-102026-06-12
Robertson Manufacturing Inc$5.52M44PA2022-10-042026-06-11
International Parts Supply Corporation$5.35M12MN2022-11-212026-06-25
Greene Metal Products, Inc.$5.35M78MI2022-10-302026-07-11
Shaw Development, LLC$4.94M9FL2022-11-082025-08-26
Custom Cable Solutions, Inc.$4.42M25MD2022-12-212026-06-23
Kongsberg Defence & Aerospace As$4.13M42024-08-122025-08-27
Johnstown Welding & Fabrication, Inc.$3.81M21PA2022-12-212026-07-28
Ravelin Defense, Inc.$3.57M9AZ2024-06-142026-02-18
Idv USA Inc.$3.38M19IL, PA2023-01-302026-07-22
Kongsberg Gruppen Asa$2.91M32022-12-022023-09-11
Parker-Hannifin Corporation$2.87M18MI, MN, WA2022-10-062025-01-21

The 25 largest of 120; the rest are on USAspending.gov.

The largest single subawards
DateToAmountFor
2025-12-23Iveco Defence Vehicles S.P.A.$46.41MMATERIAL
2026-01-29Iveco Defence Vehicles S.P.A.$46.33MMATERIAL
2022-12-23Iveco Defence Vehicles S.P.A.$46.09MMATERIAL
2025-09-05Iveco Defence Vehicles S.P.A.$44.14MMATERIAL
2023-05-17Iveco Defence Vehicles S.P.A.$41.48MMATERIAL
2025-06-30Iveco Defence Vehicles S.P.A.$37.48MMATERIAL
2023-05-17Iveco Defence Vehicles S.P.A.$25.70MMATERIAL
2025-04-01Iveco Defence Vehicles S.P.A.$17.43MMATERIAL
2025-03-10Iveco Defence Vehicles S.P.A.$15.49MMATERIAL
2025-03-27Iveco Defence Vehicles S.P.A.$12.40MMATERIAL
2025-12-11Leading Technology Composites, Inc$9.69MMATERIAL
2025-07-23Iveco Defence Vehicles S.P.A.$7.83MMATERIAL
2024-04-11Iveco Defence Vehicles S.P.A.$7.60MSERVICE
2026-07-14Iveco Defence Vehicles S.P.A.$7.44MSERVICE
2026-05-26The First Electronics Corporation$7.09MMATERIAL
2026-05-29Crane Pumps & Systems PFT Corp$5.99MMATERIAL
2026-02-13DRS Network & Imaging Systems LLC$5.35MMATERIAL/SERVICE
2024-09-06Iveco Defence Vehicles S.P.A.$4.82MSERVICE
2025-07-09Leading Technology Composites, Inc$4.76MMATERIAL
2023-07-11The First Electronics Corporation$4.76MMATERIAL/SERVICE
2026-06-05Kidde Technologies Inc$4.70MMATERIAL
2023-03-30Leading Technology Composites, Inc$4.56MMATERIAL
2026-07-15Iveco Defence Vehicles S.P.A.$4.55MSERVICE
2022-11-18Iveco Defence Vehicles S.P.A.$4.48MMATERIAL
2023-05-26Leading Technology Composites, Inc$4.11MMATERIAL

Every action

257 actions since 2022-10-07 (the newest 200 shown). Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2026-03-12P00227Option exercised$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
2026-03-10P00242Funding only-$3.87MPROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
2026-03-10P00242Funding only$0PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
2026-03-10P00242Funding only$0PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
2026-03-10P00241Supplemental agreement (work within scope)$4.10MPROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
2026-03-10P00241Supplemental agreement (work within scope)$226.00MPROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
2026-03-10P00241Supplemental agreement (work within scope)$0PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
2026-03-10P00240Supplemental agreement (work within scope)$0PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
2026-03-10P00240Supplemental agreement (work within scope)$0PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
2026-03-10P00240Supplemental agreement (work within scope)$0PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
2026-03-10P00238Supplemental agreement (work within scope)$0PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
2026-03-10P00238Supplemental agreement (work within scope)$134.6KPROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
2026-03-10P00238Supplemental agreement (work within scope)$0PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
2026-03-10P00237Funding only$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION (TI) NO. 23 REVISION 2, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES
2026-03-10P00237Funding only$833.0KINCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION (TI) NO. 23 REVISION 2, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES
2026-03-10P00237Funding only$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION (TI) NO. 23 REVISION 2, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES
2026-03-10P00236Supplemental agreement (work within scope)$0THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO DOCUMENT THE FILE FOR THE INCORPORATION OF VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION NO. 30 REVISION 1, FAILURE REPORTING, ANALYSIS, AND CORRECTIVE…
2026-03-10P00236Supplemental agreement (work within scope)$554.3KTHE PURPOSE OF THIS BILATERAL MODIFICATION IS TO DOCUMENT THE FILE FOR THE INCORPORATION OF VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION NO. 30 REVISION 1, FAILURE REPORTING, ANALYSIS, AND CORRECTIVE…
2026-03-10P00236Supplemental agreement (work within scope)$0THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO DOCUMENT THE FILE FOR THE INCORPORATION OF VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION NO. 30 REVISION 1, FAILURE REPORTING, ANALYSIS, AND CORRECTIVE…
2026-03-10P00235Supplemental agreement (work within scope)$0THIS PURPOSE OF THIS BILATERALLY MOD IS TO RECORD THE MUTUAL SETTLEMENT AGREEMENT BETWEEN BAE AND THE GOVERNMENT TO RESOLVE THE CLAIMS AND ISSUES RAISED BY BAE.
2026-03-10P00235Supplemental agreement (work within scope)$0THIS PURPOSE OF THIS BILATERALLY MOD IS TO RECORD THE MUTUAL SETTLEMENT AGREEMENT BETWEEN BAE AND THE GOVERNMENT TO RESOLVE THE REA.
2026-03-10P00235Supplemental agreement (work within scope)$0THIS PURPOSE OF THIS BILATERALLY MOD IS TO RECORD THE MUTUAL SETTLEMENT AGREEMENT BETWEEN BAE AND THE GOVERNMENT TO RESOLVE THE CLAIMS AND ISSUES RAISED BY BAE.
2026-03-10P00234Supplemental agreement (work within scope)$0THIS PURPOSE OF THIS BILATERAL MODIFICATION (P00234) IS TO UPDATE ATTACHMENT 10.2, SCHEDULED GFP (SGFP) LIST, ATTACHMENT 20, ACV CONFIGURATION MANAGEMENT PLAN, AND ATTACHMENT 53, SECTION G ADMINISTRATION.
2026-03-10P00234Supplemental agreement (work within scope)$0THIS PURPOSE OF THIS BILATERAL MODIFICATION (P00234) IS TO UPDATE ATTACHMENT 10.2, SCHEDULED GFP (SGFP) LIST, ATTACHMENT 20, ACV CONFIGURATION MANAGEMENT PLAN, AND ATTACHMENT 53, SECTION G ADMINISTRATION.
2026-03-10P00234Supplemental agreement (work within scope)$0THIS PURPOSE OF THIS BILATERAL MODIFICATION (P00234) IS TO UPDATE ATTACHMENT 10.2, SCHEDULED GFP (SGFP) LIST, ATTACHMENT 20, ACV CONFIGURATION MANAGEMENT PLAN, AND ATTACHMENT 53, SECTION G ADMINISTRATION.
2026-03-10P00233Administrative change$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR BY UPDATING ATTACHMENT 50 SECTION D PACKAGING AND MARKING TO INSERT MISSING VEHICLE NUMBERS 689340-689490 FOR ACV-30 FRP LOTS 5-6.
2026-03-10P00233Administrative change$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR BY UPDATING ATTACHMENT 50 SECTION D PACKAGING AND MARKING TO INSERT MISSING VEHICLE NUMBERS 689340-689490 FOR ACV-30 FRP LOTS 5-6.
2026-03-10P00233Administrative change$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR BY UPDATING ATTACHMENT 50 SECTION D PACKAGING AND MARKING TO INSERT MISSING VEHICLE NUMBERS 689340-689490 FOR ACV-30 FRP LOTS 5-6.
2026-03-10P00232Supplemental agreement (work within scope)$0THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO INCORPORATE ATTACHMENT 27.5, HEXAVALENT CHROMIUM AND CADMIUM ACV-R PRTVS WAIVER, ATTACHMENT 27.5A, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.5B, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER,…
2026-03-10P00232Supplemental agreement (work within scope)$0THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO INCORPORATE ATTACHMENT 27.5, HEXAVALENT CHROMIUM AND CADMIUM ACV-R PRTVS WAIVER, ATTACHMENT 27.5A, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.5B, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER,…
2026-03-10P00232Supplemental agreement (work within scope)$0THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO INCORPORATE ATTACHMENT 27.5, HEXAVALENT CHROMIUM AND CADMIUM ACV-R PRTVS WAIVER, ATTACHMENT 27.5A, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.5B, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER,…
2026-03-10P00231Supplemental agreement (work within scope)$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
2026-03-10P00231Supplemental agreement (work within scope)$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
2026-03-10P00231Supplemental agreement (work within scope)$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
2026-03-10P00230Supplemental agreement (work within scope)$0THE PURPOSE OF THIS MEMORANDUM IS TO DOCUMENT A BILATERAL MODIFICATION TO RECORD THE MUTUAL AGREEMENT OF THE PARTIES AS TO THE TERMS AND CONDITIONS CONTAINED WITHIN ATTACHMENT 53, SECT G.27 CORROSION PREVENTION AND MITIGATION AGREEMENT.
2026-03-10P00230Supplemental agreement (work within scope)$0THE PURPOSE OF THIS MEMORANDUM IS TO DOCUMENT A BILATERAL MODIFICATION TO RECORD THE MUTUAL AGREEMENT OF THE PARTIES AS TO THE TERMS AND CONDITIONS CONTAINED WITHIN ATTACHMENT 53, SECT G.27 CORROSION PREVENTION AND MITIGATION AGREEMENT.
2026-03-10P00230Supplemental agreement (work within scope)$0THE PURPOSE OF THIS MEMORANDUM IS TO DOCUMENT A BILATERAL MODIFICATION TO RECORD THE MUTUAL AGREEMENT OF THE PARTIES AS TO THE TERMS AND CONDITIONS CONTAINED WITHIN ATTACHMENT 53, SECT G.27 CORROSION PREVENTION AND MITIGATION AGREEMENT.
2026-03-10P00229Supplemental agreement (work within scope)$0BILATERAL MODIFICATION FOR THE ENGINEERING CHANGE PROPOSAL 0072 - TASK INSTRUCTION 26, CORROSION RESISTANT ALTERNATOR, PROVIDED AS RETROFIT MODIFICATION KITS FOR THE ACV FAMILY OF VEHICLES IN SUPPORT OF SUSTAINMENT AND RELIABILITY EFFORTS.
2026-03-10P00229Supplemental agreement (work within scope)$731.9KBILATERAL MODIFICATION FOR THE ENGINEERING CHANGE PROPOSAL 0072 - TASK INSTRUCTION 26, CORROSION RESISTANT ALTERNATOR, PROVIDED AS RETROFIT MODIFICATION KITS FOR THE ACV FAMILY OF VEHICLES IN SUPPORT OF SUSTAINMENT AND RELIABILITY EFFORTS.
2026-03-10P00229Supplemental agreement (work within scope)$0BILATERAL MODIFICATION FOR THE ENGINEERING CHANGE PROPOSAL 0072 - TASK INSTRUCTION 26, CORROSION RESISTANT ALTERNATOR, PROVIDED AS RETROFIT MODIFICATION KITS FOR THE ACV FAMILY OF VEHICLES IN SUPPORT OF SUSTAINMENT AND RELIABILITY EFFORTS.
2026-03-10P00228Supplemental agreement (work within scope)$0INCORPORATE THE REVISIONS FOR ATTACHMENTS 23, 25, 52, AND 53.
2026-03-10P00228Supplemental agreement (work within scope)$0INCORPORATE THE REVISIONS FOR ATTACHMENTS 23, 25, 52, AND 53.
2026-03-10P00228Supplemental agreement (work within scope)$0INCORPORATE THE REVISIONS FOR ATTACHMENTS 23, 25, 52, AND 53.
2026-03-10P00227Option exercised$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
2026-03-10P00227Option exercised$362.0KADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
2026-03-10P00226Administrative change$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
2026-03-10P00226Administrative change$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
2026-03-10P00226Administrative change$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
2026-01-08P00225Supplemental agreement (work within scope)$4.17MINCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6B IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6
2026-01-08P00225Supplemental agreement (work within scope)$0INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6B IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6
2026-01-08P00225Supplemental agreement (work within scope)$0INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6B IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6
2025-12-22P00224Supplemental agreement (work within scope)$3.65MINCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6A IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND VARIOUS ADMINISTRATIVE CHANGES
2025-12-22P00224Supplemental agreement (work within scope)$0INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6A IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND VARIOUS ADMINISTRATIVE CHANGES
2025-12-22P00224Supplemental agreement (work within scope)$0INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6A IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND VARIOUS ADMINISTRATIVE CHANGES
2025-12-18P00223Option exercised$195.14MFRP LOT 6B OPTION EXERCISE
2025-12-18P00223Option exercised$0FRP LOT 6B OPTION EXERCISE
2025-12-18P00223Option exercised$0FRP LOT 6B OPTION EXERCISE
2025-12-10P00222Administrative change$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE COMPLETE SETTLEMENT AGREEMENT BETWEEN THE PARTIES AS TO MATTERS DISCUSSED IN, AND DESCRIBED BY, SECTION G.26 CONSIDERATION AGREEMENT FOR NON-CONFORMING PAINT.
2025-12-10P00222Administrative change$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE COMPLETE SETTLEMENT AGREEMENT BETWEEN THE PARTIES AS TO MATTERS DISCUSSED IN, AND DESCRIBED BY, SECTION G.26 CONSIDERATION AGREEMENT FOR NON-CONFORMING PAINT.
2025-12-10P00222Administrative change$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE COMPLETE SETTLEMENT AGREEMENT BETWEEN THE PARTIES AS TO MATTERS DISCUSSED IN, AND DESCRIBED BY, SECTION G.26 CONSIDERATION AGREEMENT FOR NON-CONFORMING PAINT.
2025-12-01P00221Option exercised$184.40MTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 6A SLINS 7501AA, 7501AD, 7502AA, 7503AA, 7502AD, AND 7504AA, CHANGE THE PSC CODE FOR SLIN 7501AD, AND UPDATE ATTACHMENT 10.2, SCHEDULED GOVERNMENT FURNISHED PROPERTY (SGFP) LIST.
2025-12-01P00221Option exercised$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 6A SLINS 7501AA, 7501AD, 7502AA, 7503AA, 7502AD, AND 7504AA, CHANGE THE PSC CODE FOR SLIN 7501AD, AND UPDATE ATTACHMENT 10.2, SCHEDULED GOVERNMENT FURNISHED PROPERTY (SGFP) LIST.
2025-12-01P00221Option exercised$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 6A SLINS 7501AA, 7501AD, 7502AA, 7503AA, 7502AD, AND 7504AA, CHANGE THE PSC CODE FOR SLIN 7501AD, AND UPDATE ATTACHMENT 10.2, SCHEDULED GOVERNMENT FURNISHED PROPERTY (SGFP) LIST.
2025-09-10P00220Supplemental agreement (work within scope)$7.61MPRODUCTION IMPLEMENTATION OF ECP 0071, HATCH PROXIMITY SENSORS AND RAMP RELIABILITY IMPROVEMENTS (RETROFIT KITS/SPARES) TASK INSTRUCTION NO. 25 AND ADD FUNDING FOR FRP LOT 5C HEDGE LOCK.
2025-09-10P00220Supplemental agreement (work within scope)$766.4KPRODUCTION IMPLEMENTATION OF ECP 0071, HATCH PROXIMITY SENSORS AND RAMP RELIABILITY IMPROVEMENTS (RETROFIT KITS/SPARES) AND TASK INSTRUCTION NO. 25.
2025-09-10P00220Supplemental agreement (work within scope)$0PRODUCTION IMPLEMENTATION OF ECP 0071, HATCH PROXIMITY SENSORS AND RAMP RELIABILITY IMPROVEMENTS (RETROFIT KITS/SPARES) TASK INSTRUCTION NO. 25 AND ADD FUNDING FOR FRP LOT 5C HEDGE LOCK.
2025-09-02P00219Supplemental agreement (work within scope)$264.4KFSR SUPPORT FOR 11TH MEU
2025-09-02P00219Supplemental agreement (work within scope)$47.4KFSR SUPPORT FOR 11TH MEU
2025-09-02P00219Supplemental agreement (work within scope)$0FSR SUPPORT FOR 11TH MEU
2025-08-26P00218Supplemental agreement (work within scope)$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES.
2025-08-26P00218Supplemental agreement (work within scope)$472.1KINCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES.
2025-08-26P00218Supplemental agreement (work within scope)$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES.
2025-08-21P00217Funding only$0FUNDING FOR TI 30 FACARS SUSTAINMENT.
2025-08-21P00217Funding only$543.4KFUNDING FOR TI 30 FACARS SUSTAINMENT.
2025-08-21P00217Funding only$0FUNDING FOR TI 30 FACARS SUSTAINMENT.
2025-07-31P00216Option exercised$181.11MTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 5C SLINS 7301AC, 7302AC, 7303AC, AND 7304AC PURSUANT TO FAR CLAUSE 52.217-7, OPTION FOR INCREASED QUANTITY, SEPARATELY PRICED LINE ITEM AND ADJUST THE QUANTITY FOR SLIN 7301AC FROM 30 TO 31.
2025-07-31P00216Option exercised$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 5C SLINS 7301AC, 7302AC, 7303AC, AND 7304AC PURSUANT TO FAR CLAUSE 52.217-7, OPTION FOR INCREASED QUANTITY, SEPARATELY PRICED LINE ITEM AND ADJUST THE QUANTITY FOR SLIN 7301AC FROM 30 TO 31.
2025-07-31P00216Option exercised$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 5C SLINS 7301AC, 7302AC, 7303AC, AND 7304AC PURSUANT TO FAR CLAUSE 52.217-7, OPTION FOR INCREASED QUANTITY, SEPARATELY PRICED LINE ITEM AND ADJUST THE QUANTITY FOR SLIN 7301AC FROM 30 TO 31.
2025-07-23P00215Supplemental agreement (work within scope)$0BILATERAL MODIFICATION TO UPDATE CLINS 8103, 8104, AND 8105 TO CPFF COMPLETION, DEOBLIGATE $1,311,800.00 OFF OF CLIN 8105, AND UPDATE ATTACHMENTS 2, 10.2, AND 33.
2025-07-23P00215Supplemental agreement (work within scope)-$1.31MBILATERAL MODIFICATION TO UPDATE CLINS 8103, 8104, AND 8105 TO CPFF COMPLETION, DEOBLIGATE $1,311,800.00 OFF OF CLIN 8105, AND UPDATE ATTACHMENTS 2, 10.2, AND 33.
2025-07-23P00215Supplemental agreement (work within scope)$0BILATERAL MODIFICATION TO UPDATE CLINS 8103, 8104, AND 8105 TO CPFF COMPLETION, DEOBLIGATE $1,311,800.00 OFF OF CLIN 8105, AND UPDATE ATTACHMENTS 2, 10.2, AND 33.
2025-06-03P00214Administrative change$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE SECTION G.25, ACV PROPELLER SHAFT ASSEMBLY, TO MEMORIALIZE THE AGREEMENT BETWEEN BAE AND THE GOVERNMENT FOR PROPELLER SHAFT ASSEMBLY.
2025-06-03P00214Administrative change$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE SECTION G.25, ACV PROPELLER SHAFT ASSEMBLY, TO MEMORIALIZE THE AGREEMENT BETWEEN BAE AND THE GOVERNMENT FOR PROPELLER SHAFT ASSEMBLY.
2025-06-03P00214Administrative change$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE SECTION G.25, ACV PROPELLER SHAFT ASSEMBLY, TO MEMORIALIZE THE AGREEMENT BETWEEN BAE AND THE GOVERNMENT FOR PROPELLER SHAFT ASSEMBLY.
2025-05-30P00213Administrative change$2.71MTHIS MOD IS TO DOCUMENT THE INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5B IN ACCORDANCE WITH SECTION G.14, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND TO INCREMENTALLY FUND CLIN 8201, ACV-R MRV, AND CLIN 8203, ACV-R TEST SUPPORT
2025-05-30P00213Administrative change$15.24MTHE PURPOSE OF THIS MOD IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5B IN ACCORDANCE WITH SECTION G.14, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND TO INCREMENTALLY FUND CLIN 8201, ACV-R MRV PHASE 2, AND CLIN 8203, ACV-R PHASE 2
2025-05-30P00213Administrative change$0THIS MOD IS TO DOCUMENT THE INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5B IN ACCORDANCE WITH SECTION G.14, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND TO INCREMENTALLY FUND CLIN 8201, ACV-R MRV, AND CLIN 8203, ACV-R TEST SUPPORT
2025-05-21P00212Administrative change$0UPDATED ATTACHMENT 05, ACV FOV IMP, AND ATTACHMENT 27 AAA FRM-02002 -V.3 - CONTRACTOR REQUEST FOR USE OF PROHIBITED MATERIALS, AND INCORPORATE ATTACHMENT 27.4, HC MECH FASTENERS ACV-30 PRTVS.
2025-05-21P00212Administrative change$0UPDATED ATTACHMENT 05, ACV FOV IMP, AND ATTACHMENT 27 AAA FRM-02002 -V.3 - CONTRACTOR REQUEST FOR USE OF PROHIBITED MATERIALS, AND INCORPORATE ATTACHMENT 27.4, HC MECH FASTENERS ACV-30 PRTVS.
2025-05-21P00212Administrative change$0UPDATED ATTACHMENT 05, ACV FOV IMP, AND ATTACHMENT 27 AAA FRM-02002 -V.3 - CONTRACTOR REQUEST FOR USE OF PROHIBITED MATERIALS, AND INCORPORATE ATTACHMENT 27.4, HC MECH FASTENERS ACV-30 PRTVS.
2025-05-01P00211Option exercised$172.29MFRP LOT 5B OPTION EXERCISE
2025-05-01P00211Option exercised$0FRP LOT 5B OPTION EXERCISE
2025-05-01P00211Option exercised$0FRP LOT 5B OPTION EXERCISE
2025-04-18P00210Supplemental agreement (work within scope)$1.99MINCORPORATE FUNDING FOR THE FIELD SERVICE REPRESENTATIVE (FSR) GAP BETWEEN FULL RATE PRODUCTION (FRP) LOTS 4B AND 5A FOR CLIN 7203, FIELDING AND SUPPORT COSTS FRP LOT 4, FOR CAMP PENDLETON, CAMP LEJEUNE, AND OKINAWA
2025-04-18P00210Supplemental agreement (work within scope)$0INCORPORATE FUNDING FOR THE FIELD SERVICE REPRESENTATIVE (FSR) GAP BETWEEN FULL RATE PRODUCTION (FRP) LOTS 4B AND 5A FOR CLIN 7203, FIELDING AND SUPPORT COSTS FRP LOT 4, FOR CAMP PENDLETON, CAMP LEJEUNE, AND OKINAWA
2025-04-18P00210Supplemental agreement (work within scope)$0INCORPORATE FUNDING FOR THE FIELD SERVICE REPRESENTATIVE (FSR) GAP BETWEEN FULL RATE PRODUCTION (FRP) LOTS 4B AND 5A FOR CLIN 7203, FIELDING AND SUPPORT COSTS FRP LOT 4, FOR CAMP PENDLETON, CAMP LEJEUNE, AND OKINAWA
2025-03-31P00209Supplemental agreement (work within scope)-$423.5KINCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5A AND TO UPDATE FAR 52.216-16, INCENTIVE PRICE REVISION-FIRM TARGET, FROM "BY REFERENCE" TO "BY FULL TEXT"
2025-03-31P00209Supplemental agreement (work within scope)$0INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5A AND TO UPDATE FAR 52.216-16, INCENTIVE PRICE REVISION-FIRM TARGET, FROM "BY REFERENCE" TO "BY FULL TEXT"
2025-03-31P00209Supplemental agreement (work within scope)$0INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5A AND TO UPDATE FAR 52.216-16, INCENTIVE PRICE REVISION-FIRM TARGET, FROM "BY REFERENCE" TO "BY FULL TEXT"
2025-03-18P00208Supplemental agreement (work within scope)$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THIS NO-COST BILATERAL MODIFICATION P00208 FOR CONTRACT M67854-16-C-0006 IS TO UPDATE SECTION I, CONTRACT CLAUSES, TO REMOVE FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES, AND FAR 52.222-26, EQUAL…
2025-03-18P00208Supplemental agreement (work within scope)$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THIS NO-COST BILATERAL MODIFICATION P00208 FOR CONTRACT M67854-16-C-0006 IS TO UPDATE SECTION I, CONTRACT CLAUSES, TO REMOVE FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES, AND FAR 52.222-26, EQUAL…
2025-03-18P00208Supplemental agreement (work within scope)$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THIS NO-COST BILATERAL MODIFICATION P00208 FOR CONTRACT M67854-16-C-0006 IS TO UPDATE SECTION I, CONTRACT CLAUSES, TO REMOVE FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES, AND FAR 52.222-26, EQUAL…
2025-03-14P00207Supplemental agreement (work within scope)$181.79MACV-30 FRP LOTS 5-6 (EXERCISE CLINS FOR FRP LOT 5A)
2025-03-14P00207Supplemental agreement (work within scope)$6.67MACV-30 FRP LOTS 5-6 (EXERCISE CLINS FOR FRP LOT 5A)
2025-03-14P00207Supplemental agreement (work within scope)$0ACV-30 FRP LOTS 5-6 (EXERCISE CLINS FOR FRP LOT 5A)
2025-03-03P00206Funding only$0INCREMENTALLY FUND CLIN 8103, ACV-30 PRODUCTION READINESS TEST VEHICLES (PRTV) DESIGN AND DEVELOPMENT PHASE 4
2025-03-03P00206Funding only$386.3KINCREMENTALLY FUND CLIN 8103, ACV-30 PRODUCTION READINESS TEST VEHICLES (PRTV) DESIGN AND DEVELOPMENT PHASE 4
2025-03-03P00206Funding only$0INCREMENTALLY FUND CLIN 8103, ACV-30 PRODUCTION READINESS TEST VEHICLES (PRTV) DESIGN AND DEVELOPMENT PHASE 4
2025-01-31P00205Supplemental agreement (work within scope)$0UPDATE THE VALUE AND FUNDING FOR CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR NRE COSTS FOR ECP 65 DESIGN EFFORT, AND INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
2025-01-31P00205Supplemental agreement (work within scope)$2.86MUPDATE THE VALUE AND FUNDING FOR CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR NRE COSTS FOR ECP 65 DESIGN EFFORT, AND INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
2025-01-31P00205Supplemental agreement (work within scope)$0UPDATE THE VALUE AND FUNDING FOR CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR NRE COSTS FOR ECP 65 DESIGN EFFORT, AND INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
2024-12-20P00204Funding only$0INCREMENTALLY FUND CLINS 8201 AND 8203
2024-12-20P00204Funding only$5.06MINCREMENTALLY FUND CLINS 8201 AND 8203
2024-12-20P00204Funding only$0INCREMENTALLY FUNDING CLINS 8201 AND 8203
2024-11-13P00203Supplemental agreement (work within scope)$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR ACV-30 DRAWINGS UPDATE FOR FULL RATE PRODUCTION (FRP) LOTS 5-6, TASK INSTRUCTION (TI) NO. 29 EXTEND THE PERIOD OF PERFORMANCE (POP) ON CLINS 6203AB, FSR 15TH MEU: 1ST…
2024-11-13P00203Supplemental agreement (work within scope)$1.13MINCORPORATE VALUE AND FUNDING UNDER CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR ACV-30 DRAWINGS UPDATE FOR FULL RATE PRODUCTION (FRP) LOTS 5-6, TASK INSTRUCTION (TI) NO. 29 EXTEND THE PERIOD OF PERFORMANCE (POP) ON CLINS 6203AB, FSR 15TH MEU: 1ST…
2024-11-13P00203Supplemental agreement (work within scope)$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR ACV-30 DRAWINGS UPDATE FOR FULL RATE PRODUCTION (FRP) LOTS 5-6, TASK INSTRUCTION (TI) NO. 29 EXTEND THE PERIOD OF PERFORMANCE (POP) ON CLINS 6203AB, FSR 15TH MEU: 1ST…
2024-09-25P00202Funding only$0INCORPORATE INCREMENTAL FUNDING FOR CLIN 8201, ACV-R POST-CDR DESIGN AND DEVELOPMENT (PHASE 2), AND TO UPDATE DFARS 252.232-7006, WIDE AREA WORKFLOW (WAWF) PAYMENT INSTRUCTIONS.
2024-09-25P00202Funding only$256.3KINCORPORATE INCREMENTAL FUNDING FOR CLIN 8201, ACV-R POST-CDR DESIGN AND DEVELOPMENT (PHASE 2), AND TO UPDATE DFARS 252.232-7006, WIDE AREA WORKFLOW (WAWF) PAYMENT INSTRUCTIONS.
2024-09-25P00202Funding only$0INCORPORATE INCREMENTAL FUNDING FOR CLIN 8201, ACV-R POST-CDR DESIGN AND DEVELOPMENT (PHASE 2), AND TO UPDATE DFARS 252.232-7006, WIDE AREA WORKFLOW (WAWF) PAYMENT INSTRUCTIONS.
2024-09-04P00201Administrative change$0UPDATE ATTACHMENT 11, COVER SHEET FOR TEST SCHEDULES AND TEST LOCATIONS, AND ATTACHMENT 11.2, ACV-30 MISSION ROLE VARIANT (MRV) TEST SCHEDULES AND TEST LOCATIONS DRAFT, TO REFLECT REVISED DATES AND SCHEDULE UPDATES.
2024-09-04P00201Administrative change$0UPDATE ATTACHMENT 11, COVER SHEET FOR TEST SCHEDULES AND TEST LOCATIONS, AND ATTACHMENT 11.2, ACV-30 MISSION ROLE VARIANT (MRV) TEST SCHEDULES AND TEST LOCATIONS DRAFT, TO REFLECT REVISED DATES AND SCHEDULE UPDATES.
2024-09-04P00201Administrative change$0UPDATE ATTACHMENT 11, COVER SHEET FOR TEST SCHEDULES AND TEST LOCATIONS, AND ATTACHMENT 11.2, ACV-30 MISSION ROLE VARIANT (MRV) TEST SCHEDULES AND TEST LOCATIONS DRAFT, TO REFLECT REVISED DATES AND SCHEDULE UPDATES.
2024-08-23P00200Administrative change$0UPDATE SECTION D, PACKAGING AND MARKING, AMPHIBIOUS COMBAT VEHICLE PERSONNEL (ACV-P) LOW RATE INITIAL PRODUCTION (LRIP) AND FULL RATE PRODUCTION (FRP) VEHICLE MARKING, TO CORRECT FRP LOT 2A SERIAL NUMBERS
2024-08-23P00200Administrative change$0UPDATE SECTION D, PACKAGING AND MARKING, AMPHIBIOUS COMBAT VEHICLE PERSONNEL (ACV-P) LOW RATE INITIAL PRODUCTION (LRIP) AND FULL RATE PRODUCTION (FRP) VEHICLE MARKING, TO CORRECT FRP LOT 2A SERIAL NUMBERS
2024-08-23P00200Administrative change$0UPDATE SECTION D, PACKAGING AND MARKING, AMPHIBIOUS COMBAT VEHICLE PERSONNEL (ACV-P) LOW RATE INITIAL PRODUCTION (LRIP) AND FULL RATE PRODUCTION (FRP) VEHICLE MARKING, TO CORRECT FRP LOT 2A SERIAL NUMBERS
2024-08-15P00199Supplemental agreement (work within scope)$0INCORPORATE, FUND, AND EXERCISE CLIN 2011, NIWC FSR SUPPORT, TO COVER FSR SUPPORT AT THE NAVAL INFORMATION WARFARE CENTER (NIWC)
2024-08-15P00199Supplemental agreement (work within scope)$60.0KINCORPORATE, FUND, AND EXERCISE CLIN 2011, NIWC FSR SUPPORT, TO COVER FSR SUPPORT AT THE NAVAL INFORMATION WARFARE CENTER (NIWC)
2024-08-15P00199Supplemental agreement (work within scope)$0INCORPORATE, FUND, AND EXERCISE CLIN 2011, NIWC FSR SUPPORT, TO COVER FSR SUPPORT AT THE NAVAL INFORMATION WARFARE CENTER (NIWC)
2024-07-31P00198Supplemental agreement (work within scope)$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2010 FOR FIELD SERVICE REPRESENTATIVE (FSR) SUPPORT AT NAVAL INFORMATION WARFARE CENTER (NIWC) AND INCREMENTALLY FUND CLIN 8201, ACV-R POST-CRITICAL DESIGN REVIEW (CDR) DESIGN AND DEVELOPMENT (PHASE 2)
2024-07-31P00198Supplemental agreement (work within scope)$2.50MINCORPORATE VALUE AND FUNDING UNDER CLIN 2010 FOR FIELD SERVICE REPRESENTATIVE (FSR) SUPPORT AT NAVAL INFORMATION WARFARE CENTER (NIWC) AND INCREMENTALLY FUND CLIN 8201, ACV-R POST-CRITICAL DESIGN REVIEW (CDR) DESIGN AND DEVELOPMENT (PHASE 2)
2024-07-31P00198Supplemental agreement (work within scope)$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2010 FOR FIELD SERVICE REPRESENTATIVE (FSR) SUPPORT AT NAVAL INFORMATION WARFARE CENTER (NIWC) AND INCREMENTALLY FUND CLIN 8201, ACV-R POST-CRITICAL DESIGN REVIEW (CDR) DESIGN AND DEVELOPMENT (PHASE 2)
2024-07-12P00197Supplemental agreement (work within scope)$0BILATERAL MODIFICATION TO INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES
2024-07-12P00197Supplemental agreement (work within scope)$1.00MINCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES
2024-07-12P00197Supplemental agreement (work within scope)$0BILATERAL MODIFICATION TO INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES
2024-07-03P00196Supplemental agreement (work within scope)$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING EFFORT FOR TASK INSTRUCTION NO. 28 FOR FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM SUSTAINMENT.
2024-07-03P00196Supplemental agreement (work within scope)$533.1KINCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING EFFORT FOR TASK INSTRUCTION NO. 28 FOR FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM SUSTAINMENT.
2024-07-03P00196Supplemental agreement (work within scope)$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING EFFORT FOR TASK INSTRUCTION NO. 28 FOR FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM SUSTAINMENT.
2024-07-03A00002Administrative change$0THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE QUANTITY, UNIT OF ISSUE, UNIT PRICE FOR CLIN 3005
2024-07-03A00001Administrative change$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE ADMIN OFFICE AND PAY OFFICE ON MODS ARZ993 AND P00194.
2024-06-28P00195Supplemental agreement (work within scope)$0CHANGE STRUCTURE OF SLINS UNDER CLIN 6203, FSR SUPPORT FOR THE 15TH MEU AND INCREMENTALLY FUND CLINS 8103, ACV-30 PRTV DESIGN AND DEVELOPMENT PHASE 4 AND 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
2024-06-28P00195Supplemental agreement (work within scope)$5.39MCHANGE STRUCTURE OF SLINS UNDER CLIN 6203, FSR SUPPORT FOR THE 15TH MEU AND INCREMENTALLY FUND CLINS 8103, ACV-30 PRTV DESIGN AND DEVELOPMENT PHASE 4 AND 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
2024-06-28P00195Supplemental agreement (work within scope)$0CHANGE STRUCTURE OF SLINS UNDER CLIN 6203, FSR SUPPORT FOR THE 15TH MEU AND INCREMENTALLY FUND CLINS 8103, ACV-30 PRTV DESIGN AND DEVELOPMENT PHASE 4 AND 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
2024-06-20P00194Supplemental agreement (work within scope)-$342.7KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOTS 4A AND 4B TWO YEARS IIP SPARES AND TO FIX ADMINISTRATIVE ERROR ON ATTACHMENT 33.
2024-06-20P00194Supplemental agreement (work within scope)$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOTS 4A AND 4B TWO YEARS IIP SPARES AND TO FIX ADMINISTRATIVE ERROR ON ATTACHMENT 33.
2024-06-20P00194Supplemental agreement (work within scope)$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOTS 4A AND 4B TWO YEARS IIP SPARES AND TO FIX ADMINISTRATIVE ERROR ON ATTACHMENT 33.
2024-05-23P00193Funding only$0INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
2024-05-23P00193Funding only$2.08MINCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
2024-05-23P00193Funding only$0INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
2024-05-20P00192Supplemental agreement (work within scope)$6.76MTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE AND FUND CLIN 7204AA AND 7204AB TWO YEARS INITIAL ISSUE PROVISIONING SPARES.
2024-05-20P00192Supplemental agreement (work within scope)$46.4KTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE AND FUND CLIN 7204AA AND 7204AB TWO YEARS INITIAL ISSUE PROVISIONING SPARES.
2024-05-20P00192Supplemental agreement (work within scope)$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE AND FUND CLIN 7204AA AND 7204AB TWO YEARS INITIAL ISSUE PROVISIONING SPARES.
2024-04-25P00191Supplemental agreement (work within scope)-$6.11MTHE PURPOSE OF THIS MODIFICATION IS TO PERFORM THE HEDGE LOCK FOR LOT 4B AND UPDATE SECTION J ATTACHMENTS.
2024-04-25P00191Supplemental agreement (work within scope)$0THE PURPOSE OF THIS MODIFICATION IS TO PERFORM THE HEDGE LOCK FOR LOT 4B AND UPDATE SECTION J ATTACHMENTS.
2024-04-25P00191Supplemental agreement (work within scope)$0THE PURPOSE OF THIS MODIFICATION IS TO PERFORM THE HEDGE LOCK FOR LOT 4B AND UPDATE SECTION J ATTACHMENTS.
2024-04-04P00190Supplemental agreement (work within scope)$0ACV-R PHASE 2 FOR PRTVS
2024-04-04P00190Supplemental agreement (work within scope)$52.05MACV-R PHASE 2 FOR PRTVS
2024-04-04P00190Supplemental agreement (work within scope)$0ACV-R PHASE 2 FOR PRTVS
2024-03-28P00189Option exercised$25.66MTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 4B SLIN 7201AD FOR M67854-16-C-0006 P00189.
2024-03-28P00189Option exercised$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 4B SLIN 7201AD FOR M67854-16-C-0006 P00189.
2024-03-28P00189Option exercised$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 4B SLIN 7201AD FOR M67854-16-C-0006 P00189.
2024-03-14P00188Option exercised$775.8KTHE PURPOSE OF THIS MOD IS TO DOCUMENT THE FILE FOR THE BILATERAL EXERCISE OF OPTION SLINS 6203AB AND 6203AE, FSR SUPPORT FOR THE 15TH MEU, PURSUANT TO FAR CLAUSE 52.217-7 AND TO INCORPORATE DFARS CLAUSE 252.245-7005.
2024-03-14P00188Option exercised$0THE PURPOSE OF THIS MOD IS TO DOCUMENT THE FILE FOR THE BILATERAL EXERCISE OF OPTION SLINS 6203AB AND 6203AE, FSR SUPPORT FOR THE 15TH MEU, PURSUANT TO FAR CLAUSE 52.217-7 AND TO INCORPORATE DFARS CLAUSE 252.245-7005.
2024-03-14P00188Option exercised$0THE PURPOSE OF THIS MOD IS TO DOCUMENT THE FILE FOR THE BILATERAL EXERCISE OF OPTION SLINS 6203AB AND 6203AE, FSR SUPPORT FOR THE 15TH MEU, PURSUANT TO FAR CLAUSE 52.217-7 AND TO INCORPORATE DFARS CLAUSE 252.245-7005.
2024-03-06P00187Option exercised$181.89MFRP LOT 4B OPTION EXERCISE
2024-03-06P00187Option exercised$0FRP LOT 4B OPTION EXERCISE
2024-03-06P00187Option exercised$0FRP LOT 4B OPTION EXERCISE
2024-02-20P00186Supplemental agreement (work within scope)$0PROCURING ACV-30 TURRET SPARE PARTS FOR TEST SUPPORT.
2024-02-20P00186Supplemental agreement (work within scope)$1.83MPROCURING ACV-30 TURRET SPARE PARTS FOR TEST SUPPORT.
2024-02-20P00186Supplemental agreement (work within scope)$0PROCURING ACV-30 TURRET SPARE PARTS FOR TEST SUPPORT.
2023-11-21P00185Supplemental agreement (work within scope)-$7.48MACV-R CDR DRAWINGS, FUNDING FOR TEST SUPPORT COST OVERRUN, AND HEDGE LOCK FOR FRP LOT 4A
2023-11-21P00185Supplemental agreement (work within scope)$3.83MACV-R CDR DRAWINGS, FUNDING FOR TEST SUPPORT COST OVERRUN, AND HEDGE LOCK FOR FRP LOT 4A
2023-11-21P00185Supplemental agreement (work within scope)$0ACV-R CDR DRAWINGS, FUNDING FOR TEST SUPPORT COST OVERRUN, AND HEDGE LOCK FOR FRP LOT 4A
2023-11-17P00184Funding only$0INCREMENTALLY FUND CLINS 8103 AND 8105
2023-11-17P00184Funding only$4.89MINCREMENTALLY FUND CLINS 8103 AND 8105
2023-11-17P00184Funding only$0INCREMENTALLY FUND CLINS 8103 AND 8105
2023-11-03P00183Option exercised$211.48MFRP LOT 4A OPTION EXERCISE
2023-11-03P00183Option exercised$0FRP LOT 4A OPTION EXERCISE
2023-11-03P00183Option exercised$0FRP LOT 4A OPTION EXERCISE
2023-10-31P00182Supplemental agreement (work within scope)$4.07MFIVE ENGINEERING CHANGE PROPOSALS (ECPS) (C003 ANTENNA MOUNT TO REDESIGN, C004 RELOCATED MULTIPLE ITEMS, C013 ADD GLOBAL POSITIONING SYSTEM (GPS) (ROCTEC) PASS THRU BLOCKS, C015 SHIELD THE EMERGENCY EGRESS LIGHTING SYSTEM (EELS) CAPACITOR, AND C016 PART B…
2023-10-31P00182Supplemental agreement (work within scope)$93.0KFIVE ENGINEERING CHANGE PROPOSALS (ECPS) (C003 ANTENNA MOUNT TO REDESIGN, C004 RELOCATED MULTIPLE ITEMS, C013 ADD GLOBAL POSITIONING SYSTEM (GPS) (ROCTEC) PASS THRU BLOCKS, C015 SHIELD THE EMERGENCY EGRESS LIGHTING SYSTEM (EELS) CAPACITOR, AND C016 PART B…
2023-10-31P00182Supplemental agreement (work within scope)$0FIVE ENGINEERING CHANGE PROPOSALS (ECPS) (C003 ANTENNA MOUNT TO REDESIGN, C004 RELOCATED MULTIPLE ITEMS, C013 ADD GLOBAL POSITIONING SYSTEM (GPS) (ROCTEC) PASS THRU BLOCKS, C015 SHIELD THE EMERGENCY EGRESS LIGHTING SYSTEM (EELS) CAPACITOR, AND C016 PART B…
2023-09-28P00181Supplemental agreement (work within scope)$0ACV-R PHASE 2 MATERIAL DEVELOPMENT
2023-09-28P00181Supplemental agreement (work within scope)$6.31MACV-R MISSION ROLE VARIANT (MRV) PHASE 2 MATERIAL DEVELOPMENT
2023-09-28P00181Supplemental agreement (work within scope)$0ACV-R PHASE 2 MATERIAL DEVELOPMENT
2023-09-25P00180Supplemental agreement (work within scope)$418.2KECP54 RETROFIT KITS/CLIN 6202 ADMIN UPDATES/SECTION D VEHICLE SERIAL NUMBER UPDATES
2023-09-25P00180Supplemental agreement (work within scope)$13.3KECP54 RETROFIT KITS/CLIN 6202 ADMIN UPDATES/SECTION D VEHICLE SERIAL NUMBER UPDATES
2023-09-25P00180Supplemental agreement (work within scope)$0ECP54 RETROFIT KITS/CLIN 6202 ADMIN UPDATES/SECTION D VEHICLE SERIAL NUMBER UPDATES
2023-09-12P00179Supplemental agreement (work within scope)$1.64MECP54 RETROFIT CABLES
2023-09-12P00179Supplemental agreement (work within scope)$102.3KECP54 RETROFIT CABLES
2023-09-12P00179Supplemental agreement (work within scope)$0ECP54 RETROFIT CABLES
2023-08-18P00178Supplemental agreement (work within scope)$0PROHIBITED MATERIAL CONSIDERATION
2023-08-18P00178Supplemental agreement (work within scope)$0PROHIBITED MATERIAL CONSIDERATION
2023-08-18P00178Supplemental agreement (work within scope)$0PROHIBITED MATERIAL CONSIDERATION
2023-08-15P00177Supplemental agreement (work within scope)$0ACV-30 PHASE 4 DOCUMENTATION AND SUBJECT MATTER EXPERT SUPPORT FOR SAFETY REVIEW MEETINGS.
2023-08-15P00177Supplemental agreement (work within scope)$943.1KACV-30 PRTV DESIGN & DEVT PHASE 4 DOCUMENTATION AND SUBJECT MATTER EXPERT SUPPORT FOR SAFETY REVIEW MEETINGS.
2023-08-15P00177Supplemental agreement (work within scope)$0ACV-30 PHASE 4 DOCUMENTATION AND SUBJECT MATTER EXPERT SUPPORT FOR SAFETY MEETINGS.
2023-08-02P00176Supplemental agreement (work within scope)$0ENGINEERING CHANGES AND ADMINISTRATIVE UPDATES
2023-08-02P00176Supplemental agreement (work within scope)$1.20MENGINEERING CHANGES AND ADMINISTRATIVE UPDATES
2023-08-02P00176Supplemental agreement (work within scope)$0ENGINEERING CHANGES AND ADMINISTRATIVE UPDATES

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗