E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7)
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
1564 subawards totaling $1.08B (35.8% of what was obligated), as Northrop Grumman Systems Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Lockheed Martin Corporation | $377.35M | 27 | NY | 2023-03-06 | 2025-12-22 |
| Rolls-Royce Holdings PLC | $117.03M | 7 | IN | 2025-05-15 | 2025-12-05 |
| Soc Potez Aeronautique | $84.84M | 11 | 2023-07-03 | 2023-12-14 | |
| Rockwell Collins Australia Pty Limited | $71.46M | 25 | CA, CT, FL, IA, VT | 2023-05-22 | 2025-08-14 |
| Purolator Facet, Inc. | $41.70M | 43 | CA, FL, MI, NY, OH, TX | 2023-05-25 | 2025-12-18 |
| L3Harris Technologies, Inc | $39.82M | 9 | CA, NY | 2023-03-08 | 2025-10-30 |
| Safran Electrical and Power USA, LLC | $30.07M | 5 | TX | 2023-09-15 | 2025-11-25 |
| Honeywell International Inc. | $29.84M | 32 | AZ, CA | 2024-06-17 | 2025-12-16 |
| Air Industries Group | $24.66M | 7 | NY | 2024-06-14 | 2025-10-16 |
| The Triumph Group Operations, Inc | $21.06M | 19 | NC | 2024-10-04 | 2025-10-28 |
| Pole/Zero LLC | $16.00M | 6 | OH | 2024-05-06 | 2025-09-22 |
| Mathtech Inc | $14.47M | 14 | VA | 2024-05-16 | 2025-12-08 |
| Align Precision - Cedar City, LLC | $13.97M | 74 | UT | 2023-06-01 | 2025-12-15 |
| Berkshire Hathaway Inc. | $13.23M | 29 | CA, FL, OK, TX, WA | 2023-12-12 | 2025-12-18 |
| Applied Aerospace Structures Corp | $12.04M | 11 | CA | 2022-12-02 | 2025-10-09 |
| Hydroform USA Incorporated | $11.90M | 116 | CA | 2023-06-28 | 2025-12-08 |
| Globe Engineering Co., Inc | $11.71M | 40 | KS | 2023-05-22 | 2025-10-22 |
| RTX Corp | $5.95M | 18 | CA, CT, FL, VT | 2024-01-17 | 2025-12-22 |
| Rodelco Electronics Corp | $5.72M | 13 | NY | 2023-08-02 | 2025-12-17 |
| Hamilton Sundstrand Corporation | $5.31M | 2 | IL | 2025-02-24 | 2025-02-24 |
| Brek Manufacturing Co. | $5.14M | 9 | CA | 2023-10-02 | 2025-09-09 |
| Transdigm Group Incorporated | $5.05M | 18 | CA, NJ, NY | 2024-09-06 | 2025-10-02 |
| B.J.G. Electronics, Inc. | $5.05M | 5 | NY | 2024-12-17 | 2025-03-26 |
| Arrowhead Products Corp | $4.87M | 2 | CA | 2024-10-16 | 2024-10-16 |
| Woodward Inc. | $4.59M | 1 | IL | 2024-12-19 | 2024-12-19 |
The 25 largest of 188; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2023-03-06 | Lockheed Martin Corporation | $202.25M | MAJOR SYS/SUBSYS |
| 2025-12-05 | Rolls-Royce Corporation | $117.00M | AIRCRAFT ENGINE AND ENGINE PARTS MANUFACTURING |
| 2023-03-06 | Lockheed Martin Corporation | $77.33M | STANDARDPARTHARDWARE |
| 2025-09-02 | Fisica Applied Technologies, Inc. | $63.94M | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING |
| 2025-07-02 | Fisica Applied Technologies, Inc. | $62.98M | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING |
| 2023-07-03 | Soc Potez Aeronautique | $41.30M | NLAG/GTS DELIVERABLE |
| 2023-07-03 | Soc Potez Aeronautique | $35.37M | NLAG/GTS DELIVERABLE |
| 2025-04-18 | Lockheed Martin Corporation | $22.32M | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING |
| 2024-06-14 | Air Industries Machining, Corp. | $22.17M | MAJOR SYS/SUBSYS |
| 2023-03-30 | Lockheed Martin Corporation | $17.43M | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING |
| 2025-06-19 | Pole/Zero LLC | $17.34M | RADIO AND TELEVISION BROADCASTING AND WIRELESS COMMUNICATIONS EQUIPMENT MANUFACTURING |
| 2025-05-16 | Raytheon Company | $17.05M | RADIO AND TELEVISION BROADCASTING AND WIRELESS COMMUNICATIONS EQUIPMENT MANUFACTURING |
| 2024-12-06 | Hamilton Sundstrand Corporation | $16.99M | AIRCRAFT ENGINE AND ENGINE PARTS MANUFACTURING |
| 2023-11-02 | Raytheon Company | $15.67M | ENGINEERING SERVICES |
| 2023-09-15 | Safran Electrical and Power USA, LLC | $15.52M | HUMAN RESOURCES SERV |
| 2023-11-14 | Safran Electrical and Power USA, LLC | $14.37M | OTHER AIRCRAFT PART AND AUXILIARY EQUIPMENT MANUFACTURING (SEE FOOTNOTE 7) |
| 2023-03-30 | Lockheed Martin Corporation | $14.30M | STANDARDPARTHARDWARE |
| 2025-01-20 | Lockheed Martin Corporation | $12.04M | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING |
| 2025-08-28 | Pole/Zero LLC | $11.75M | RADIO AND TELEVISION BROADCASTING AND WIRELESS COMMUNICATIONS EQUIPMENT MANUFACTURING |
| 2024-09-06 | Lockheed Martin Corporation | $11.67M | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING |
| 2025-04-02 | Mathtech Inc | $10.77M | AIRCRAFT ENGINE AND ENGINE PARTS MANUFACTURING |
| 2024-08-27 | Lockheed Martin Corporation | $9.33M | MAJOR SYS/SUBSYS |
| 2025-09-22 | Pole/Zero LLC | $8.64M | RADIO AND TELEVISION BROADCASTING AND WIRELESS COMMUNICATIONS EQUIPMENT MANUFACTURING |
| 2024-10-10 | Triumph Actuation Systems LLC | $8.36M | OTHER AIRCRAFT PART AND AUXILIARY EQUIPMENT MANUFACTURING (SEE FOOTNOTE 7) |
| 2025-01-20 | Lockheed Martin Corporation | $8.14M | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING |
110 actions since 2022-10-18. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-09 | P00133 | Funding only | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2026-06-26 | P00132 | Funding only | $5.80M | E-2D MULTIYEAR PRODUCTION II |
| 2026-06-22 | P00131 | Administrative change | $1.46M | E-20 MULTIYEAR PRODUCTION II |
| 2026-06-04 | P00130 | Administrative change | $2.02M | E-2D MULTIYEAR PRODUCTION II |
| 2026-05-29 | P00129 | Additional work (new agreement) | -$2.02M | E-2D MULTIYEAR PRODUCTION II |
| 2026-05-22 | P00128 | Funding only | $168.1K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING TO O&A CLINS 0116 & 0117 IN THE AMOUNT OF $64,388 AND 103,705. |
| 2026-05-12 | P00127 | Additional work (new agreement) | $5.88M | E-2D MULTIYEAR PRODUCTION II |
| 2026-04-22 | P00126 | Funding only | $3.00M | E-2D MULTIYEAR PRODUCTION II |
| 2026-04-21 | P00125 | Funding only | $97.0K | E-2D MULTIYEAR PRODUCTION II |
| 2026-04-09 | P00124 | Administrative change | $189.5K | E-2D MULTI YEAR. |
| 2026-03-23 | P00123 | Supplemental agreement (work within scope) | $5.00M | E-2D MULTIYEAR PRODUCTION II |
| 2026-03-11 | P00122 | Supplemental agreement (work within scope) | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2026-02-19 | P00121 | Option exercised | $1.07M | E-2D MULTIYEAR PRODUCTION (MYP) II |
| 2026-02-10 | P00120 | Funding only | $2.55M | E-2D MULTIYEAR PRODUCTION (MYP) II |
| 2026-01-23 | P00119 | Administrative change | $11.51M | FUND CLINS 0301, 0312, 0401, 0452, 0453, 0470. REPLACE ATT 4 SOW. REPLACE ATT 5 DRAL. REPLACE SUPPL 2 ELECTRONIC DATA SUBMISSION INSTRUCTIONS, EXB J-K Q & EXHIBITS F,G. UPDATE ATT 23. POP ON 0020, 0201, 0301, 0450, 0451, UPDATE SEC F |
| 2026-01-15 | A00028 | Administrative change | $0 | UNDEFINITIZED ORDER |
| 2026-01-15 | A00027 | Supplemental agreement (work within scope) | $0 | UNDEFINITIZED ORDER |
| 2025-12-17 | P00118 | Funding only | $5.00M | E-2D MULTIYEAR PROCUREMENT II |
| 2025-12-15 | P00117 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2025-12-01 | A00026 | Administrative change | $0 | UNDEFINITIZED ORDER |
| 2025-11-20 | P00116 | Funding only | $5.00M | E-2D MULTIYEAR PRODUCTION II |
| 2025-09-30 | P00115 | Additional work (new agreement) | $267.5K | E-2D MULTIYEAR PRODUCTION II |
| 2025-09-11 | P00114 | Funding only | $5.00M | E-2D MULTIYEAR PROCUREMENT I |
| 2025-08-28 | A00025 | Administrative change | $0 | UNDEFINITIZED ORDER |
| 2025-08-25 | P00113 | Funding only | $30.5K | E-2D MULTIYEAR PRODUCTION II |
| 2025-07-31 | P00112 | Funding only | $5.00M | E-2D MULTIYEAR PRODUCTION II |
| 2025-07-24 | P00111 | Supplemental agreement (work within scope) | $974.2K | E-2D MULTIYEAR PRODUCTION II |
| 2025-07-22 | P00110 | Change order | $140.83M | E-2D MULTIYEAR PRODUCTION II |
| 2025-07-11 | P00109 | Funding only | $5.00M | E-2D MULTIYEAR PRODUCTION II |
| 2025-07-09 | P00108 | Additional work (new agreement) | $46.67M | THE PURPOSE OF THIS MODIFICATION IS AS FOLLOWS: 1. ADD PRODUCTION ATTRITION CAPABILITY INTEGRATION SUPPORT CLINS 0458 AND 0459 2. UPDATE ATTACHMENT 4 "FRP LOTS 7-11A STATEMENT OF WORK" 3. ADD ATTACHMENT 23 "ATTRITION LIST" 4. UPDATE EXHIBITS J-K SUPPLEMENT 2… |
| 2025-06-03 | P00107 | Funding only | $5.00M | E-2D MULTIYEAR PRODUCTION II |
| 2025-05-15 | P00106 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2025-05-15 | P00105 | Administrative change | $394.0K | THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO: 1. DELETE AND REPLACE SUPPLEMENT (1) ELECTRONIC DATA SUBMISSION INSTRUCTIONS 2. DELETE AND REPLACE ATTACHMENT (8) GFE LIST PER CTRLTR-20250203-DL 3. CREATE AND FUND RIU-5 REPLACEMENT CLIN PER… |
| 2025-04-23 | P00104 | Administrative change | $5.00M | E-2D MULTIYEAR PRODUCTION II |
| 2025-03-31 | P00103 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2025-03-21 | P00102 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2025-03-18 | A00024 | Administrative change | $0 | UNDEFINITIZED ORDER |
| 2025-03-06 | P00101 | Funding only | $489.1K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE O&A FUNDING TO CLIN 0216 IN THE AMOUNT OF $255,618 AND CLIN 0217 IN THE AMOUNT OF $233,475. |
| 2025-02-26 | P00100 | Option exercised | $283.0K | E-2D MULTIYEAR PRODUCTION II |
| 2025-02-20 | P00099 | Administrative change | $100.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD CLIN 0514 IN SUPPORT OF TRANSPORTATION. |
| 2025-02-12 | P00098 | Change order | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2025-02-04 | P00097 | Funding only | $10.00M | E-2D MULTIYEAR PRODUCTION II |
| 2025-01-31 | P00096 | Supplemental agreement (work within scope) | $57.36M | E-2D MULTIYEAR PRODUCTION (MYP) II |
| 2025-01-21 | A00023 | Supplemental agreement (work within scope) | $0 | UNDEFINITIZED ORDER |
| 2024-12-16 | P00095 | Additional work (new agreement) | $1.35M | E-2D MULTIYEAR PRODUCTION II |
| 2024-12-10 | P00094 | Administrative change | $0 | DELETE AND REPLACE ATTACHMENT (4) FRP LOTS 7-11 SOW AND DELETE AND REPLACE EXHIBIT (A) CONTRACT DATA REQUIREMENTS LIST FOR CLIN 0X01. AND UPDATE TECH POP DATES FOR CLINS 0004, 0104, 0204, 0304, 0404, 0214, 0314, 0414 AND UPDATE DCMA SURVEILLANCE POP. |
| 2024-11-19 | P00093 | Funding only | $10.00M | E-2D MULTIYEAR PRODUCTION II |
| 2024-10-31 | P00092 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2024-10-04 | P00091 | Administrative change | $0 | DELETE AND REPLACE ATTACHMENT (4) FRP LOTS 7-11+ STATEMENT OF WORK, ADD ATTACHMENT (21) PERFORMANCE BASED PAYMENT SCHEDULE, ADD ATTACHMENT (112) JAPAN - PERFORMANCE BASED PAYMENT SCHEDULE AND POP EXTENSION FOR NRE CLINS 0003, 0103, 0203, AND 0403 |
| 2024-09-18 | P00090 | Funding only | $5.00M | E-2D MULTIYEAR PRODUCTION II |
| 2024-09-17 | A00022 | Administrative change | $0 | UNDEFINITIZED ORDER |
| 2024-09-16 | P00089 | Administrative change | $18.52M | CREATE & FUND NEW PRODUCTION CUT IN INTEGRATION CLIN. DELETE AND REPLACE ATTACHMENT FRP LOTS 7-11+ STATEMENT OF WORK, GOVERNMENT FURNISHED EQUIPMENT LIST, CDRL FOR CLIN 0X01 AND SUPPLEMENT (1), EXHIBITS (A-E) ELECTRONIC DATA SUBMISSION INSTRUCTIONS. |
| 2024-08-05 | P00088 | Additional work (new agreement) | $24.66M | E-2D MULTIYEAR PRODUCTION II |
| 2024-08-01 | ARZ995 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2024-07-25 | P00087 | Supplemental agreement (work within scope) | $975.2K | E-2D MULTIYEAR PRODUCTION (MYP) II |
| 2024-07-19 | P00086 | Additional work (new agreement) | $1.46B | ADD 9 E-2D AIRCRAFT |
| 2024-07-09 | A00021 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2024-07-03 | P00085 | Change order | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2024-07-02 | A00020 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2024-05-29 | A00019 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2024-05-23 | A00018 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2024-05-16 | A00017 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2024-05-15 | P00084 | Administrative change | $291.7K | DE-OBLIGATE AND RE-OBLIGATE CORRECT WBS ELEMENT FOR CLIN 0401 AND INCREASE FUNDING FOR CLIN 0319. DELETE AND REPLACE EXHIBIT (B) CDRL F OR CLIN 0X07 AND 0X15, EXHIBIT (C) CDRL FOR CLIN 0X10. AND DELETE AND REPLACE ATTACHMENT (4) STATEMENT OF WORK. |
| 2024-04-16 | P00083 | Administrative change | $30.00M | E-2D MULTIYEAR PRODUCTION II |
| 2024-04-09 | P00082 | Administrative change | $0 | ADJUST CLIN 0452 TO CORRECT FUNCTIONAL AREA. |
| 2024-03-27 | P00081 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2024-03-26 | A00016 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2024-03-14 | A00015 | Supplemental agreement (work within scope) | $0 | UNDEFINITIZED ORDER |
| 2024-02-12 | A00014 | Supplemental agreement (work within scope) | $0 | UNDEFINITIZED ORDER |
| 2024-01-08 | P00080 | Option exercised | $244.5K | E-2D MULTIYEAR PRODUCTION II |
| 2023-12-27 | A00013 | Supplemental agreement (work within scope) | $0 | AIRCRAFT, FIXED WING |
| 2023-12-20 | P00079 | Administrative change | $0 | REPLACE ATTACHMENT CONTRACT COST & SOFTWARE DATA REPORTING PLAN. DELETE AND REPLACE EXHIBIT J, CDRL FOR CLIN 0021. REPLACE EXHIBIT F, CDRL FOR CLINS 0241 AND 0440. REPLACE ATTACHMENT (8) GOVERNMENT FURNISHED EQUIPMENT LIST & ADD NO-COST CLIN PER. |
| 2023-11-28 | A00012 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2023-11-21 | P00078 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2023-11-02 | P00077 | Administrative change | $31.81M | THE PURPOSE OF THIS BILATERAL MODIFICATION TO ORDER N0001918C1037 IS TO CREATE/FUND SSA CLIN, DELETE/REPLACE ATTACHMENT (4) SOW, ATTACHMENT (8) GFE LIST, EXHIBIT A CDR LIST, AND EXHIBIT C CDR LIST. |
| 2023-10-11 | A00011 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2023-09-29 | P00076 | Funding only | $150.00M | THE PURPOSE OF THIS MODIFICATION IS TO CREATE AND FUND CLIN 0470 FOR LONG LEAD PARTS AND RELATED SUPPORT IN SUPPORT OF FIVE (5) JAPAN E-2D AIRCRAFT. |
| 2023-08-25 | P00075 | Additional work (new agreement) | $29.14M | E-2D MULTIYEAR PRODUCTION II |
| 2023-08-17 | P00074 | Administrative change | $0 | ADMIN MOD |
| 2023-07-31 | P00073 | Additional work (new agreement) | $330.27M | E-2D MULTIYEAR PRODUCTION II |
| 2023-07-14 | P00072 | Option exercised | $1.14M | OPTION EXERCISE |
| 2023-06-27 | P00071 | Additional work (new agreement) | $7.50M | E-2D MULTIYEAR PRODUCTION II |
| 2023-06-22 | P00070 | Administrative change | $0 | ADMIN CHANGES |
| 2023-06-15 | P00069 | Supplemental agreement (work within scope) | $970.9K | THE PURPOSE OF THIS MODIFICATION IS TO ADD $970,910 OF VALUE AND CEILING TO THE JAPAN E-2D SOFTWARE SUPPORT ACTIVITY CLIN (0026). |
| 2023-06-13 | ARZ997 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2023-06-01 | A00010 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2023-05-31 | P00068 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2023-05-03 | P00067 | Administrative change | $60.00M | THE PURPOSE OF THIS MODIFICATION IS TO CREATE AND FUND CLIN 0452 FOR LONG LEAD PARTS AND RELATED SUPPORT IN SUPPORT OF TWO (2) USN E-2D PLUS UP AIRCRAFT. |
| 2023-04-26 | P00066 | Option exercised | $547.6K | E-2D MULTIYEAR PRODUCTION II |
| 2023-04-21 | P00065 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2023-04-19 | A00009 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2023-04-14 | A00008 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2023-03-30 | P00064 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2023-03-29 | P00063 | Supplemental agreement (work within scope) | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2023-03-28 | P00062 | Funding only | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2023-03-28 | A00007 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2023-03-21 | P00061 | Administrative change | $525.80M | THE PURPOSE OF THIS MODIFICATION IS EXERCISE FY23 CLINS AND TO EXTEND THE POP FOR CLIN 0205, 0206, 0413, AND 0414, DELETE AND REPLACE ATTACHMENT (4) SOW, ADD ATTACHMENT 18, DELETE AND REPLACE SUPPLEMENT (3)AND DELETE AND REPLACE EXHIBIT A ( |
| 2023-03-03 | A00006 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2023-02-27 | P00060 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2023-02-02 | P00059 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2023-01-31 | P00058 | Funding only | $5.12M | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CLIN 0451 AND UPDATE THE APPROPRIATE SECTIONS. |
| 2023-01-24 | A00005 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2023-01-23 | P00057 | Administrative change | $0 | THE PURPOSE OF THIS BILATERAL MODIFICATION FOR CONTRACT N0001918C1037 IS TO EXTEND THE PERIOD OF PERFORMANCE FOR CLINS 0113,0213,AND 0313. |
| 2022-12-16 | P00056 | Administrative change | $0 | THIS MODIFICATION FULLY RESOLVES NAVAIR LETTER 22-A087, DATED 7 JUL 22, SUBJECT: DTS-K STOP WORK AND REQUEST FOR DE-SCOPE PROPOSAL. |
| 2022-12-15 | P00055 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2022-12-07 | A00004 | Administrative change | $0 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| 2022-12-01 | P00054 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2022-11-10 | P00053 | Option exercised | $2.55M | OPTION CLINS 0205 AND 0206 EXERCISED |
| 2022-10-27 | P00052 | Administrative change | $0 | E-2D MULTIYEAR PRODUCTION II |
| 2022-10-18 | P00051 | Supplemental agreement (work within scope) | $6.06M | THE PURPOSE OF THIS MODIFICATION IS TO ADD NON-RECURRING AND RECURRING ENGINEERING FOR THE JAPAN E-2D AR-1500 RADIOS. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-20). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗