N0001919C0010↗
Lockheed Martin Corporation received this contract from Dcma Fixed Wing FT Worth, Defense Contract Management Agency: $2.56B obligated so far for aircraft, fixed wing. It runs to 2027-04-01.
Key facts · data as of Oct 21, 2026
- Recipient
- Lockheed Martin Corporation
- Awarding agency
- Defense Contract Management Agency (Department of Defense)
- Contracting office
- Dcma Fixed Wing FT Worth (S4419A)
- Obligated to date
- $2.56B
- Potential value
- $5.35B
- Ends
- 2027-04-01
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 21, 2026.
Cite this page: SpendQuery, Award N0001919C0010, data as of Oct 21, 2026, https://spendquery.com/award?id=CONT_AWD_N0001919C0010_9700_-NONE-_-NONE-
Lockheed Martin Corporation: all federal awards · Department of Defense: spending · Dcma Fixed Wing FT Worth: what it buys · The follow-on: recompete brief
DUAL CAPABLE AIRCRAFT UCA AWARD
Up for re-bid: ends 2027-04-01. Recompete brief →
What it is
- Product or service
- Aircraft, Fixed Wing (PSC 1510)
- Industry
- Aircraft Manufacturing (NAICS 336411)
- Contracting office
- Dcma Fixed Wing FT Worth (S4419A)
- Competition
- Not competed · 1 offer received
- Pricing
- Cost plus incentive fee
- How it was bought
- Standalone contract
- Where the work is
- Tarrant, TX · district TX-12
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
318 subawards totaling $601.28M (23.5% of what was obligated), as Lockheed Martin Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Compagnie De Developpement De L'Eau S.A. | $206.01M | 32 | NH | 2023-12-01 | 2025-02-01 |
| Northrop Grumman Corporation | $117.24M | 59 | CA, IL, MD, NY | 2022-10-01 | 2025-02-01 |
| Bae Systems PLC | $61.40M | 20 | NH, NY | 2022-10-01 | 2023-09-01 |
| Honeywell International Inc | $33.60M | 10 | AZ, CA, FL | 2022-11-01 | 2024-04-01 |
| Northrop Grumman Systems Corporation | $32.78M | 12 | CA, MD, NY | 2023-03-01 | 2025-02-01 |
| Cubic Defense Applications Inc. | $32.69M | 6 | CA | 2024-03-01 | 2025-02-01 |
| Gatr Technologies Inc. | $14.44M | 2 | CA | 2023-01-01 | 2023-02-01 |
| Bae Systems Information and Electronic Systems Integration Inc. | $11.38M | 9 | NH | 2023-05-01 | 2023-10-01 |
| Marvin Engineering Co, Inc | $9.26M | 2 | CA | 2023-01-01 | 2023-12-01 |
| Bgi LLC | $7.93M | 2 | OH | 2023-12-20 | 2024-12-12 |
| Ball Corp | $7.47M | 12 | CO | 2022-12-01 | 2025-02-01 |
| Northrop Grumman International Trading, Inc | $5.93M | 1 | CA | 2024-01-01 | 2024-01-01 |
| Dignitas Technologies, LLC | $5.72M | 5 | FL | 2023-06-13 | 2024-12-10 |
| Rockwell Collins Australia Pty Limited | $4.65M | 4 | AZ | 2023-09-12 | 2024-12-01 |
| L3Harris Technologies, Inc | $4.45M | 4 | NY | 2022-10-01 | 2024-10-01 |
| Textron Inc | $4.17M | 1 | MD | 2024-03-01 | 2024-03-01 |
| Kongsberg Gruppen Asa | $3.89M | 1 | 2023-10-01 | 2023-10-01 | |
| Pip Manufacturing, Inc. | $3.51M | 1 | FL | 2024-10-01 | 2024-10-01 |
| Resideo Technologies, Inc. | $2.66M | 2 | AZ, FL | 2023-12-01 | 2024-01-01 |
| Airmar Technology Corp. | $2.34M | 7 | CT | 2024-02-01 | 2024-08-01 |
| Ultra Electronics Holding PLC | $2.15M | 1 | 2022-10-01 | 2022-10-01 | |
| Allegis Group, Inc. | $1.92M | 1 | MD | 2022-12-05 | 2022-12-05 |
| Corsair Technical Services LLC | $1.90M | 3 | WA | 2022-12-01 | 2024-08-01 |
| Dayton T. Brown, Inc. | $1.87M | 4 | NY | 2023-01-01 | 2024-10-01 |
| Netapp U.S. Public Sector, Inc. | $1.81M | 1 | VA | 2023-12-01 | 2023-12-01 |
The 25 largest of 87; the rest are on USAspending.gov.
The largest single subawards
| Date | To | Amount | For |
|---|---|---|---|
| 2024-06-01 | Bae Systems Information and Electronic Systems Integration Inc. | $53.07M | CLIN 2301 OTB |
| 2023-12-01 | Bae Systems Information and Electronic Systems Integration Inc. | $48.04M | CLIN 1301 OTB |
| 2023-08-01 | Northrop Grumman Systems Corporation | $44.77M | CLIN 101 - CRYPTO MOD - WBS 1.4.1.2.2 CLIN 101 - MADL IMP - WBS 1.4.1.4.2.. CLIN 101 - MGS - WBS 1.9.1.7.2 CLIN 101 - SEC ARCH - WBS 1.4.1.1.2 CLIN 201 - ADS-B/1000C - WBS 1.1.1.2.2. CLIN 202 - CMN-4 - WBS 1.4.3.2 |
| 2025-01-01 | Bae Systems Information and Electronic Systems Integration Inc. | $28.53M | CLIN 1301 OTB MODULE MODERN ADC CLOCK MODULE MODERNIZED DCR/T MODULE QUAD TUNER MODULE QUAD UPCONVERTER |
| 2024-12-01 | Bae Systems (Operations) Limited | $27.29M | CLIN 0136 MOD 4 METEOR (UK) - COST CLIN 0136 MOD 4 METEOR (UK) - FEE CLIN 0137 MOD 4 METEOR (IT) - COST CLIN 0137 MOD 4 METEOR (IT) - FEE CLIN 0145 MOD 4 UK SPEAR CAP 1 (UK)-COST CLIN 0145 MOD 4 UK SPEAR CAP 1 (UK)-FEE… |
| 2024-06-01 | Bae Systems Information and Electronic Systems Integration Inc. | $25.60M | CLIN 1301 OTB |
| 2022-11-01 | Honeywell International Inc. | $25.31M | F-35 PTMS C2D2 PHASE 2.3 |
| 2023-04-01 | Bae Systems Information and Electronic Systems Integration Inc. | $20.68M | 1.2.1.1.2 ADAPTIVE RADAR CM/COGNITIVE 1.2.1.2.2 ADDITIONAL ECM TECHNIQUES 1.2.1.4.2 BAND 2 & 5 RWR FUNCTIONALITY 1.2.1.5.2 DTIP WIDEBAND RECEIVERS 1.2.1.6.2 IMPROVED EMITTER ID-TRUE LOCK 1.2.3.2/1.16 EW SYSTEM… |
| 2023-02-01 | Bae Systems Information and Electronic Systems Integration Inc. | $20.60M | BAE EW CLIN 0202 OTB |
| 2025-02-01 | Bae Systems Information and Electronic Systems Integration Inc. | $18.30M | MOD ANALOG DIG CONVERTER MOD MODERNIZED DCR/TG MODULE MODERN ADC CLOCK MODULE MODERNIZED DCR/T MODULE MODERNIZED QUAD MODULE QUAD TUNER MODULE QUAD UPCONVERTER M-QUAD UP CONVERTER WBR PART 2 TARGET COST |
| 2023-08-01 | Bae Systems Information and Electronic Systems Integration Inc. | $18.13M | BAE EW CLIN 0202 OTB FMV |
| 2022-12-01 | Northrop Grumman Systems Corp | $17.77M | MADL LL |
| 2023-02-01 | Cubic Defense Applications, Inc. | $15.52M | FMV C2D2 COST OVERRUN |
| 2023-03-01 | Northrop Grumman Systems Corporation | $12.88M | CLIN 202 - CMN-4 - WBS 1.4.3.2 FMV INTEGRATION |
| 2023-04-01 | Bae Systems Information and Electronic Systems Integration Inc. | $11.91M | 1.2.1.5.2 DTIP WIDEBAND RECEIVER 1.2.3.2/1.16 EW SYSTEM SHARED/PMO 1.5.1.1.2 REQUIRED HW & FW |
| 2025-01-01 | Cubic Defense Applications, Inc. | $11.73M | FMV C2D2 COST OVERRUN |
| 2023-06-01 | Northrop Grumman Systems Corporation | $10.12M | DT HARDWARE CLIN: 0205 PMO CLIN: 0205 |
| 2024-06-01 | Northrop Grumman Systems Corporation | $9.88M | CLIN 101 - MADL IMP - WBS 1.4.1.4.2.. CLIN 202 - CMN-4 - WBS 1.4.3.2 |
| 2023-01-01 | Marvin Engineering Co, Inc | $9.21M | NPR FOR SITB FOMOD3 MOD5 SIDEKICK STRUT KIT STA 4 ADAPTER ASSY STA 8 ADAPTER ASSY |
| 2024-03-01 | Cubic Defense Applications, Inc. | $8.18M | FMV C2D2 COST OVERRUN |
| 2024-08-01 | Cubic Defense Applications, Inc. | $8.17M | FMV C2D2 COST OVERRUN |
| 2024-12-01 | Bae Systems Information and Electronic Systems Integration Inc. | $7.78M | CLIN 1301 OTB |
| 2024-06-01 | Northrop Grumman Systems Corporation | $6.87M | CLIN-0204- INPA CLIN-0205 - INPA |
| 2024-12-01 | Northrop Grumman Systems Corp | $6.37M | C2D2 2.3 METEOR UK EFFORT/EXT |
| 2024-11-01 | Northrop Grumman Systems Corporation | $6.15M | CLIN 202 - CMN-4 - WBS 1.4.3.2 |
Every action
58 actions since 2022-10-18. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-08 | A00005 | Administrative change | $0 | UPDATE THE POP FOR CLIN 0104. |
| 2026-06-26 | P00134 | Funding only | $188.34M | THE REASON FOR THIS MOD IS TO DEFINITIZE |
| 2026-06-04 | P00133 | Administrative change | $0 | UPDATE THE TOTAL COST OF CLIN 5001 TO BE IN LINE WITH THE FUNDING ON CONTRACT. |
| 2026-05-27 | P00132 | Change order definitized | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADJUST THE COST AND FEE ON CLIN 1001 TO ACCOUNT FOR THE LJDAM ENVELOPE SCOPE REDUCTION & AIM-9X CHANGE ORDER. |
| 2026-05-14 | P00131 | Funding only | $74.73M | THE PURPOSE OF THIS MOD IS TO INCREMENTALLY FUND CLINS. |
| 2026-04-28 | P00130 | Administrative change | $0 | DE-OB AND RE-OB ON CLIN 0501. INCREASE TARGET COST FOR 0202 AND 2002 TO MATCH FUNDING ON CONTRACT. |
| 2026-04-27 | P00129 | Funding only | $248.11M | THIS MODIFICATION IS AWARDING THE H-8 PERIOD 5 AWARD FEE PAYMENT ON CLIN 5000, H-19 PIF EVENTS 4 & 8 PAYMENT ON CLIN 5001, AS WELL AS A PARTNER CATCH UP ON MULTIPLE CLINS TO MEET THE COST SHARE. ESTABLISHES CLIN 2002 AS A CONTINUATION OF 0202. |
| 2026-04-08 | P00128 | Administrative change | $0 | THIS MODIFICATION UPDATES SECTION I AND J. |
| 2026-01-30 | P00127 | Funding only | $84.44M | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND THE FOLLOWING CLINS WITH FY26 FUNDING: 0153, 0158, 0161, 1301, 2301. THE TOTAL VALUE BEING ADDED ON CONTRACT IS $84,441,083. THIS MODIFICATION CHANGES NO OTHER TERMS AND CONDITIONS. |
| 2026-01-30 | P00126 | Change order | $10.56M | FUNDING ON CPAF CLINS 0127, 0401 AND 0404. POP EXTENSION ON CLIN 0127. |
| 2026-01-28 | P00125 | Funding only | $11.34M | THE PURPOSE OF THIS MOD IS TO INCREMENTALLY FUND CLINS 0103, 0148, 0153, 0206. |
| 2025-12-23 | P00124 | Funding only | $76.60M | BLOCK FOUR PHASE 2.3 FUNDING ONLY MODIFICATION FOR CONTINUED PROCUREMENT OF DEVELOPMENT CAPABILITIES |
| 2025-11-14 | P00123 | Funding only | $8.64M | INCREMENTAL FUNDING |
| 2025-10-21 | P00122 | Administrative change | $500 | INCREMENTAL FUNDING |
| 2025-09-30 | P00121 | Funding only | $7.49M | INCREMENTAL END OF FISCAL YEAR FUNDING MODIFICATION. |
| 2025-09-15 | P00119 | Funding only | $80.04M | F-35 BLOCK FOUR PHASE 2.3 DEVELOPMENT FUNDING FOR US SERVICES |
| 2025-08-11 | P00118 | Administrative change | $23.27M | F-35 BLOCK FOUR, PHASE 2.3 US FY25 AND PARTNER INCREMENTAL FUNDING FOR CONTINUED DEVELOPMENT |
| 2025-07-14 | P00117 | Funding only | $24.87M | F-35 BLOCK FOUR PHASE 2.3 FUNDING FOR OT AND DT MODIFICATIONS AND KIT PROCUREMENT |
| 2025-06-17 | P00116 | Administrative change | $0 | BLOCK FOUR PHASE 2.3 NO-COST ADMINISTRATIVE ACTION TO CLARIFY THE STATEMENT OF WORK |
| 2025-05-27 | P00115 | Funding only | $39.86M | BLOCK FOUR, PHASE 2.3 MODIFICATION FOR PARTNER FY24 AND FY25 FUNDING OF CAPABILITIES REQUIREMENTS |
| 2025-04-30 | P00114 | Funding only | $23.30M | BLOCK FOUR PHASE 2.3 INCREMENTAL FUNDING TO CONTINUE DEVELOPMENTS OF TRAINING SYSTEMS REQUIREMENTS |
| 2025-04-09 | P00113 | Funding only | $64.14M | BLOCK FOUR, PHASE 2.3 INCREMENTAL FUNDING ACTION FOR U.S. SERVICE REQUIREMENTS ON CONTRACT |
| 2025-04-08 | P00112 | Supplemental agreement (work within scope) | $0 | BLOCK 4, PHASE 2.3 MODIFICATION FOR EFFORTS RELATED TO STOP-WORK AND RESTART. |
| 2025-03-10 | P00111 | Funding only | $55.57M | BLOCK FOUR, PHASE 2.3 MODIFICATION FOR US INCREMENTAL FUNDING FOR CONTINUED DEVELOPMENT SCOPE |
| 2025-02-26 | P00110 | Administrative change | $3.00M | BLOCK FOUR PHASE 2.3 SOW LANGUAGE UPDATED AND SYSTEMS REQUIREMENTS DOCUMENT UPDATE TO VERSION 31 |
| 2024-12-05 | P00109 | Funding only | $145.68M | F-35 BLOCK FOUR PHASE 2.3 MODERNIZATION INCREMENTAL FUNDING ACTION TO CONTINUE MISSION SYSTEMS DEVELOPMENT |
| 2024-11-25 | P00108 | Change order definitized | $3.82M | BLOCK FOUR, PHASE 2.3 ACTION TO DEFINITIZE DUAL CAPABILITY AIRCRAFT CHANGE ORDERS |
| 2024-10-31 | P00107 | Administrative change | $0 | BLOCK FOUR, PHASE 2.3 MODIFICATION TO EXTEND THE DEADLINE FOR SUBMISSION OF PERIOD 5 AWARD FEE ASSESSMENT DOCUMENTS |
| 2024-10-10 | P00106 | Administrative change | $0 | BLOCK FOUR PHASE 2.3 MODIFICATION TO UPDATE CONTRACTS DATA REQUIREMENTS FOR SECURITY CONTROLS TRACEABILITY MATRIX. |
| 2024-09-18 | P00104 | Funding only | $64.72M | BLOCK FOUR PHASE 2.3 MODIFICATION TO PROVIDE INCREMENTAL FUNDING AMOUNTS TO CONTINUE CAPABILITIES DEVELOPMENT. |
| 2024-08-02 | P00103 | Change order | $0 | THE F-35 BLOCK FOUR MODERNIZATION PHASE 2.3 CONTRACT CONTINUES THE DEVELOPMENT AND IMPLEMENTATION OF NEW WEAPONS, SOFTWARE, HARDWARE, AND CYBER CAPABILITIES FOR U.S. SERVICES AND PARTNERS. |
| 2024-07-31 | P00102 | Administrative change | $0 | THE F-35 BLOCK FOUR PHASE 2.3 CONTRACT CONTINUES THE DEVELOPMENT AND MODERNIZATION OF WEAPONS, SOFTWARE, HARDWARE, AND CYBER CAPABILITIES FOR ALL US SERVICES AND F-35 PARTNERS. |
| 2024-06-11 | P00101 | Administrative change | $44.24M | THE PURPOSE OF THIS MODIFICATION IS TO ADD US SERVICES AND PARTNER INCREMENTAL FUNDING. |
| 2024-05-21 | P00100 | Administrative change | $0 | INCREASE UCA NTE AND ADD FIAB SETTLEMENT AGREEMENT CLAUSES |
| 2024-04-24 | P00099 | Administrative change | $223.92M | F-35 FOLLOW-ON MODERNIZATION PHASE 2.3. THIS MODIFICATION PROVIDES OVERRUN AND INCREMENTAL FUNDING TO CONTINUE CAPABILITY DEVELOPMENT. |
| 2024-02-09 | P00098 | Funding only | $16.13M | PHASE 2.3 FOLLOW-ON MODERNIZATION (FOM). THE PURPOSE OF THIS MODIFICATION IS TO PROCESS THE PAYMENT OF EARNED AWARD FEE FOR H-4 PERIOD 4. |
| 2024-01-25 | P00097 | Administrative change | $1.28M | F-35 FOLLOW-ON MODERNIZATION - BLOCK FOUR PHASE 2.3. CONTRACT MODIFICATION FOR INCENTIVE PAYMENT. |
| 2024-01-10 | P00096 | Administrative change | $0 | F-35 FOLLOW-ON MODERNIZATION BLOCK 4 PHASE 2.3. ACTION UPDATES THE SYSTEMS REQUIREMENTS DOCUMENT. |
| 2023-12-21 | P00095 | Funding only | $149.70M | F-35 FOLLOW-ON MODERNIZATION (FOM) PHASE 2.3. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE $149.7M OF FUNDING, ADD DFARS 252.225-7007, DEFINITIZE THE SDB II CHANGE ORDER, AND UPDATE SECTION J. |
| 2023-12-07 | P00094 | Administrative change | $0 | F-35 FOLLOW-ON MODERNIZATION PHASE 2.3. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE CLIN 0023 DELIVERY DATE. |
| 2023-11-17 | P00093 | Funding only | $73.13M | F-35 FOLLOW-ON MODERNIZATION (FOM) PHASE 2.3. THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND THE PHASE 2.3 CONTRACT WITH $73.1M OF US AND PARTNER FUNDING. |
| 2023-10-31 | P00092 | Administrative change | $4.43M | F-35 FOLLOW-ON MODERNIZATION PHASE 2.3. THE PURPOSE OF THIS MODIFICATION IS TO PROCESS PAYMENTS FOR PERFORMANCE INCENTIVE FEES EARNED COMPLETING H-19 EVENTS #2 AND #12 AND UPDATE THE H-14 PIF TERMS TO PERMIT SHIPPING IN PLACE THE RAN LEVEL 1 EGI MODULE TO… |
| 2023-09-29 | P00091 | Administrative change | $0 | F-35 BLOCK 4 DEVELOPMENT |
| 2023-09-19 | P00090 | Administrative change | $1.99M | THIS REQUIREMENT REALIGNS FUNDING FOR COMBAT DATA SYSTEMS AND EXTENDS DELIVERY DATES FOR CYBER SECURITY REQUIREMENTS, COMMON CAPABILITIES, AND TEST ASSETS. |
| 2023-08-24 | P00089 | Supplemental agreement (work within scope) | $68.60M | F-35 FOLLOW-ON MODERNIZATION BLOCK FOUR, PHASE 2.3. FY 2023 FUNDING ACTION FOR U.S. AND PARTNERS, OTHER CHANGES INCLUDE UPDATES TO H-19 CLAUSE AND ATTACHMENTS |
| 2023-06-16 | P00088 | Change order definitized | -$1.00M | F-35 BLOCK FOUR FOLLOW-ON MODERNIZATION PHASE 2.3 ACTION TO DEFINITIZE AFT-HEAVY WEAPONS WORK SCOPE AND PRICE |
| 2023-05-22 | P00087 | Supplemental agreement (work within scope) | $3.10M | 30P07/30P08 SOFTWARE PIVOT - DEVELOPMENT |
| 2023-05-11 | P00086 | Administrative change | $0 | F-35 BLOCK 4 FOLLOW ON MODERNIZATION PHASE 2. |
| 2023-04-26 | P00085 | Supplemental agreement (work within scope) | $0 | STATEMENT OF WORK REVISION ON F-35 P2.3 DEVELOPMENT CONTRACT |
| 2023-03-31 | P00084 | Supplemental agreement (work within scope) | $406.40M | F-35 BLOCK 4, PHASE 2.3 FOLLOW-ON DEVELOPMENT WITH FY23 INCREMENTAL FUNDING, SCOPE UPDATES FOR WEAPONS DEVELOPMENT, AND INCENTIVE FEE EVENT UPDATES. |
| 2023-03-23 | P00083 | Funding only | $2.40M | BLOCK FOUR, PHASE 2.3 FUNDING ACTION ON AFT-HEAVY WEAPONS FOR USN FUNDING CATCH-UP. |
| 2023-02-17 | P00082 | Supplemental agreement (work within scope) | $17.27M | F-35 BLOCK 4, PHASE 2.3 FOLLOW-ON DEVELOPMENT |
| 2022-12-14 | P00081 | Administrative change | $0 | F-35 FOLLOW-ON MODERNIZATION BLOCK 4, PHASE 2.3. THIS MODIFICATION EXTENDS THE DELIVERY DATES FOR CLINS 0023 AND 0024. |
| 2022-12-13 | P00080 | Administrative change | $232.03M | F-35 FOLLOW ON MODERNIZATION BLOCK 4, PHASE 2.3. THIS MODIFICATION ISSUES A CHANGE ORDER AND PROVIDES INCREMENTAL FUNDING. |
| 2022-11-17 | P00079 | Administrative change | $59.60M | F-35 BLOCK 4, PHASE 2.3 FOLLOW-ON DEVELOPMENT. THIS MODIFICATION PROVIDES U.S. AND PARTNER INCREMENTAL FUNDING FOR SEPT-NOV 2022, EXTENSION OF DELIVERY DATES FOR CAPABILITIES, AND REVISION OF STATEMENT OF WORK, ANNEX X. |
| 2022-11-14 | P00078 | Additional work (new agreement) | $8.10M | F-35 BLOCK 4 PHASE 2.3 MODERNIZATION FOLLOW-ON EFFORT TO PROCURE HARDWARE FOR CAPABILITIES DEVELOPMENT OF BAND 2/5 RADAR WARNING RECEIVER |
| 2022-11-01 | P00077 | Administrative change | $5.90M | F-35 BLOCK 4 PHASE 2.3 FOLLOW-ON MODERNIZATION. THE PURPOSE OF THIS MODIFICATION IS TO PAY OUT PERFORMANCE INCENTIVE FEE FOR SUCCESSFULLY COMPLETED EVENTS AND EXTEND THE DELIVERY DATE OF CLIN 0400. |
| 2022-10-18 | P00076 | Administrative change | $7.12M | F-35 BLOCK 4 FOLLOW-ON MODERNIZATION DEVELOPMENT PHASE 2.3 THE PURPOSE OF THIS MODIFICATION IS TO PROCESS PAYMENT OF EARNED AWARD FEE FOR PERIOD 3 AND EXTEND THE TERM OF PERIOD 4 TO 1 DECEMBER 2021 THROUGH 31 DECEMBER 2022. DUE TO AN ERROR IN THE CONTRACT… |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗