NGJ-MB LRIP1/2
Up for re-bid: ends 2027-03-31. Recompete brief → · AN/SPN-50(V) Engineering Development Model Contract ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
61 subawards totaling $12.74M (98.6% of what was obligated), as Raytheon Company reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Honeywell International Inc | $2.86M | 1 | CA | 2023-02-27 | 2023-02-27 |
| Dupont De Nemours, Inc. | $1.35M | 1 | NC | 2023-06-29 | 2023-06-29 |
| RSM Electron Power Inc | $1.00M | 3 | NY | 2022-10-12 | 2023-11-08 |
| Ducommun Incorporated | $998.7K | 5 | WI | 2022-11-20 | 2024-02-16 |
| Tronair, Inc. | $803.4K | 3 | OH | 2024-06-04 | 2024-07-23 |
| Spang & Company | $795.7K | 3 | TX | 2023-04-14 | 2024-03-01 |
| Jabil Defense & Aerospace Services LLC | $541.5K | 2 | FL | 2024-10-23 | 2025-06-04 |
| Manda Machine Company | $471.1K | 3 | TX | 2022-11-16 | 2024-06-17 |
| Sanmina-Sci Corporation | $468.4K | 3 | CA | 2022-12-07 | 2023-07-10 |
| Abelconn LLC | $456.9K | 2 | MN | 2023-10-23 | 2023-11-29 |
| Berkshire Hathaway Inc. | $286.6K | 2 | CA, TX | 2022-12-22 | 2025-05-05 |
| Delta V Instruments Inc | $234.8K | 1 | TX | 2023-10-09 | 2023-10-09 |
| Glenair, Inc. | $225.6K | 1 | CA | 2022-11-14 | 2022-11-14 |
| Ridge Engineering, LLC. | $210.1K | 1 | MD | 2023-03-28 | 2023-03-28 |
| Trio Manufacturing Inc | $153.2K | 2 | CA | 2023-03-28 | 2024-06-06 |
| Compunetix Inc | $151.8K | 1 | PA | 2023-03-26 | 2023-03-26 |
| Winchester Interconnect RF Corporation | $140.3K | 3 | MA | 2022-11-22 | 2024-03-13 |
| Technical Marketing Systems, Inc. | $133.6K | 1 | OK | 2023-06-23 | 2023-06-23 |
| Ametek Inc | $128.3K | 2 | GA | 2023-03-27 | 2024-02-12 |
| Smiths Interconnect Americas, Inc. | $124.4K | 1 | MO | 2023-11-09 | 2023-11-09 |
| Abaco Systems, Inc. | $121.5K | 1 | AL | 2022-12-21 | 2022-12-21 |
| Survitec Holdings 1 Limited | $120.8K | 2 | MN | 2023-03-02 | 2023-09-05 |
| Pacific Ceramics, Inc. | $106.2K | 1 | CA | 2023-11-03 | 2023-11-03 |
| Camtron, Incorporated | $92.1K | 2 | TX | 2022-12-09 | 2023-10-03 |
| Summit Interconnect, Inc. | $87.8K | 1 | CA | 2023-10-19 | 2023-10-19 |
The 25 largest of 38; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2023-02-27 | Honeywell International Inc. | $2.86M | GENERATORS POWER CABLE, RATG-GRRU, ASSEMBLY GENERATORS SIGNAL CABLE, RATG-GRRU, ASSEMBLY GENERATORS DRIVE,CONSTANT SPEED,PNEUM,PU-840/ALQ249 |
| 2023-06-29 | Dupont Specialty Products USA LLC | $1.35M | THICKFILM PASTES COMPOSITION, GOLD CONDUCTOR |
| 2022-10-12 | RSM Electron Power Inc | $899.2K | TRANSISTOR,MOSFET,FULL-BRDG MOD 30A,1200 TRANSISTORS TRANSISTOR,MOSFET,FULL-BRDG MOD 30A,1200 TRANSISTORS TRANSISTOR,MOSFET,FULL-BRDG MOD.40A1200V TRANSISTORS TRANSISTOR,MOSFET,FULL-BRDG MOD.40A1200V TRANSISTORS… |
| 2024-07-02 | Tronair, Inc. | $709.2K | PUMPS. |
| 2023-05-04 | Labarge Acquisition Company, Inc. | $607.5K | NRE - ALL PMA - PROTOTYPE - FCM PROTOTYPE, LONG LE NRE - ALL 4102AS7671-1 - EXCESS MATERIAL NRE - ALL 4102AS7674-1 - EXCESS MATERIAL NRE - ALL 4102AS7674-2 - EXCESS MATERIAL NRE - ALL 4102AS7677-1 - EXCESS MATERIAL NRE… |
| 2023-04-14 | Spang & Company | $599.6K | TRANSFORMER&REACTOR POWER TRANSFORMER - MID BAND 1 INDUCTORS INDUCTOR, RESONANT-MID BAND 1 INDUCTORS INDUCTOR, OUTPUT-MID BAND 1 INDUCTORS INDUCTOR, OUTPUT, MID BAND 2 TRANSFORMER&REACTOR POWER TRANSFORMER - MID BAND 2… |
| 2025-06-04 | Jabil Defense & Aerospace Services LLC | $419.3K | CCA - CUSTOM,NRE - ALL. |
| 2022-11-16 | Manda Machine Company | $342.4K | HOSE FITTINGS FITTING, HIGH PRESSURE HOSE FITTINGS FITTING, PURGE, SYSTEM PRECISION MACHINED JAR, TEST DELEGATED HOSE ASSY. HOSE ASSEMBLY, QUICK CONNECT DELEGATED HOSE ASSY. HOSE ASSEMBLY, QUICK CONNECT HOSE FITTINGS… |
| 2023-11-29 | Abelconn LLC | $302.0K | NRE - ALL. |
| 2023-10-09 | Delta V Instruments Inc | $234.8K | NRE - ALL, NRE - ALL. |
| 2022-12-07 | Sanmina Corporation | $231.6K | PWBS MICROWAVE CIRCUIT BOARD, MB2 TRIMM PWBS PWB - AFT MANIFOLD - MID BAND 2 PWBS & BACKPLANES PRINTED WIRING BOARD, TIME DELAY UNIT PWBS PWB, DISTRIBUTION, RIGHT-MID BAND 1 PWBS PRINTED WIRE BOARD, RF COLLECTOR, MID… |
| 2022-11-14 | Glenair, Inc. | $225.6K | CABLEASSY-MECHANICAL CABLE ASSY,LCS SENSORS JMPR PWR&SIG-W001 CABLEASSY-MECHANICAL CABLE ASSEMBLY, GRRU-PDU POWER-W003 CABLEASSY-MECHANICAL CABLE ASSY,540VDC GRRU-FWD ARRAYS PWR,W4 CABLEASSY-MECHANICAL CABLE ASSEMBLY,… |
| 2023-03-28 | Ridge Engineering, LLC. | $210.1K | WELDED/BRAZED MACH COLDPLATE, MID BAND 1, DVPS WELDED/BRAZED MACH COLDPLATE,MACHINED,ADVCD PWR SUPPLY-MB2 |
| 2022-12-22 | Avibank MFG., Inc. | $159.7K | SCREWS SCREW,FASTNER PNL,FLT HD,1/4-28,TITANIUM |
| 2023-10-23 | Abelconn LLC | $155.0K | NRE - ALL. |
| 2023-03-26 | Compunetix Inc | $151.8K | CUSTOM CCA'S CIRCUIT CARD ASSEMBLY - SIGNAL PROCESSOR CUSTOM CCA'S CIRCUIT CARD ASSEMBLY - SIGNAL PROCESSOR CUSTOM CCA'S CIRCUIT CARD ASSEMBLY - FREQUENCY CONVE CUSTOM CCA'S CIRCUIT CARD ASSEMBLY - FREQUENCY CONVER… |
| 2023-05-09 | Sanmina Corporation | $141.2K | PWBS MCB, NO. 1, FLARED NOTCH - MID BAND 2 PWBS MICROWAVE CIRCUIT BOARD, NO. 2, FLARED PWBS MICROWAVE CIRCUIT BOARD, NO.3, FLARED PWBS MICROWAVE CIRCUIT BOARD, NO.4, FLARED |
| 2023-06-23 | Technical Marketing Systems, Inc. | $133.6K | NON-METAL SHP'G CONT CASE, PYLON ADAPTER NRE - ALL NRE - FAI NON-METAL SHP'G CONT CASE, RAIL EXTENSION NRE - ALL NRE - FAI NON-METAL SHP'G CONT CASE, CARRIAGE AND END CAP NRE - ALL NRE - FAI NON-METAL… |
| 2025-05-05 | Tti Inc. | $126.9K | RESISTOR CHIPS. |
| 2023-11-09 | Smiths Interconnect Americas, Inc. | $124.4K | CONNECTACCSSRY/OTHER, CONNECTACCSSRY/OTHER, CYLINDRICL CONNECTOR. |
| 2024-10-23 | Jabil Defense & Aerospace Services LLC | $122.1K | NRE - ALL. |
| 2022-12-21 | Abaco Systems, Inc. | $121.5K | DESKTOP -COMPUTER HW SINGLE BOARD COMPUTER,P4080 BASED RUGGED |
| 2024-02-16 | Labarge Acquisition Company, Inc | $117.0K | CUSTOM CCA'S, CUSTOM CCA'S. |
| 2023-12-15 | Labarge Acquisition Company, Inc. | $107.6K | CUSTOM CCA'S. |
| 2023-11-03 | Pacific Ceramics, Inc. | $106.2K | CERAMIC. |
35 actions since 2022-10-31. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-05-15 | P00045 | Funding only | $414.7K | ADDITIONAL FUNDING AND POP EXTENSIONS |
| 2026-05-05 | P00044 | Administrative change | $0 | INCORPORATE TWO H CLAUSES INTO CONTRACT |
| 2026-02-09 | P00043 | Administrative change | $0 | LRIP 2 ADMIN MOD |
| 2025-12-15 | P00042 | Funding only | $5.41M | POP EXTENSION AND OVERRUN FUNDING |
| 2025-08-06 | P00041 | Administrative change | $0 | GFP UPDATE |
| 2025-07-15 | P00040 | Administrative change | $0 | LRIP 1/2 PDU, DRAL, POP |
| 2025-06-02 | P00039 | Funding only | $2.84M | LRIP 1/2 POP EXT AND FUNDING |
| 2025-03-28 | P00038 | Administrative change | $0 | SOW AND CPI UPDATE |
| 2025-02-20 | P00037 | Funding only | $1.39M | PROVIDE OVERRUN FUNDING TO SUPPORT NRE CLIN 0201 |
| 2024-12-18 | P00036 | Administrative change | $0 | CLIN 0101 POP EXTENSION |
| 2024-11-06 | P00035 | Administrative change | $0 | EXTEND CLIN 0109 DELIVERY DATE AND UPDATE ADMIN/PYMT OFFICE |
| 2024-10-02 | P00034 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE POP ON CLINS 0031, 0139, AND 0140. |
| 2024-09-24 | P00033 | Funding only | $1.33M | THE PURPOSE OF THIS MOD IS TO ADD OVERRUN FUNDING IN SUPPORT OF NRE CLIN 0201 |
| 2024-08-30 | P00032 | Administrative change | $0 | LRIP 1/2 PDU DELIVERY CLEAN UP |
| 2024-08-09 | P00031 | Administrative change | $0 | THIS MODIFICATION UPDATES CLIN 0109 INSPECTION & ACCEPTANCE TERMS, AND EXTENDS THE POP FOR CLINS 0031, 0101, 0111, 0112, 0119, 0139, 0140, AND 0201, AND AUTHORIZES RTX TO LIQUIDATE REMAINING CLIN 0101 PAYMENTS UPON DELIVERY OF ALL LRIP LOT 2 HARDWARE |
| 2024-07-14 | P00030 | Administrative change | $0 | NEXT GENERATION JAMMER - MID-BAND LRIP LOTS 1/2 |
| 2024-05-31 | P00029 | Administrative change | $0 | VARIOUS ADMIN CHANGES |
| 2024-05-16 | P00028 | Administrative change | $0 | INSPECTION ACCEPTANCE CHANGE |
| 2024-05-08 | P00027 | Administrative change | $0 | PART NUMBER CHANGE, DELIVERY DATE AND ADDRESS CHANGE |
| 2024-04-11 | P00026 | Administrative change | $0 | MISC ADMIN MOD |
| 2024-03-15 | P00025 | Administrative change | $0 | ADMIN MOD |
| 2024-02-26 | P00024 | Administrative change | $0 | POP EXT |
| 2024-01-18 | P00023 | Administrative change | $0 | THIS MODIFICATION UPDATES THE P/N FOR CLINS 0111, 0112, 0119, & 0120, AS WELL AS THE DELIVERY DATE FOR CLIN 0109. ADDITIONALLY, THIS MODIFICATION UPDATES SEC J EX (A), ATT (1), ATT (2), AND ATT (10). |
| 2023-10-20 | P00022 | Additional work (new agreement) | $934.3K | THIS MODIFICATION ADDS FUNDING TO CLIN 0201 FOR THE ACI SSD REDESIGN EFFORT, AS WELL AS UPDATING SEC J ATT (3). |
| 2023-10-18 | P00021 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE PART NUMBER ON CLIN 0114, UPDATE SECTION C ON ITEM 0114, AND SECTION F CLINS 0010 & 0011 DELIVERY SCHEDULE. |
| 2023-09-13 | P00020 | Administrative change | $0 | THIS MODIFICATION UPDATES SECTION J ATT 1, UPDATES THE PART NUMBER FOR CLINS 0021 & 0130, UPDATES SECTION C FOR CLINS 0021, 0126, AND 0130, UPDATES THE DELIVERY ADDRESS FOR CLINS 0016 & 0125, AND EXTENDS THE DELIVERY DATE FOR CLINS 0004 & 0005. |
| 2023-08-04 | P00019 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION |
| 2023-07-17 | P00018 | Administrative change | $0 | DELIVERY ADDRESS CHANGE |
| 2023-07-12 | P00017 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION F ADDRESSES ON CLINS 0001, 0002, 0101, AND 0102. |
| 2023-06-15 | P00016 | Administrative change | $0 | VARIOUS ADMINISTRATIVE ACTIONS |
| 2023-05-04 | P00015 | Administrative change | $0 | THIS MODIFICATION UPDATES THE DELIVERY DATES ON CLINS 0103, 0104, 0109, AND 0209, AS WELL AS UPDATING THE UNIT DESCRIPTION ON CLIN 0209. DELIVERY ADDRESSES FOR CLINS 0003-0006, 0008-0029, AND 0117-0138 ARE UPDATED, AS WELL AS EXHIBIT A AND ATT (16). |
| 2023-03-31 | P00014 | Supplemental agreement (work within scope) | $599.8K | THE PURPOSE OF THIS PROCUREMENT IS TO ADD THE PIF OBSOLESCENCE REDESIGN EFFORT UNDER THE EXISTING NRE CLIN 0201. IN ADDITION, ATTACHMENT 0003 WAS UPDATED TO INCLUDE THE EFFORT. |
| 2023-03-13 | P00013 | Administrative change | $0 | COMBINATION OF SEVERAL ADMINISTRATIVE ACTIONS TO ADD CLARIFICATION TO EXHIBIT A, EXHIBIT B AND ATTACHMENTS 1, 2, 3, 10, 17 & 18. REMOVAL OF CLINS 0030 AND 0139, DELIVERY DATE UPDATED ON CLIN 0106. |
| 2022-12-19 | P00012 | Administrative change | $0 | THE PURPOSE OF THIS PROCUREMENT IS TO FIX AN ADMINISTRATIVE ERROR FROM P00010 AND UPDATE SEVERAL P/NS. |
| 2022-10-31 | P00011 | Administrative change | $0 | UPDATES TO SECTION J ATTACHMENT 006 (DD254) AND ATTACHMENT 0017 (GFP LIST) |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-20). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗