N0001921F0316↗
Lockheed Martin Corporation received this contract from Naval Air Systems Command, Department of the Navy: $44.2K obligated so far for airframe structural components. Its period of performance ended 2024-09-15.
Key facts · data as of Oct 23, 2026
- Recipient
- Lockheed Martin Corporation
- Awarding agency
- Department of the Navy (Department of Defense)
- Contracting office
- Naval Air Systems Command (N00019)
- Obligated to date
- $44.2K
- Potential value
- $58.72M
- Ends
- 2024-09-15
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 23, 2026.
Cite this page: SpendQuery, Award N0001921F0316, data as of Oct 23, 2026, https://spendquery.com/award?id=CONT_AWD_N0001921F0316_9700_N0001919G0029_9700
Lockheed Martin Corporation: all federal awards · Department of Defense: spending · Naval Air Systems Command: what it buys
F/A-18 IRST - INFRARED RECEIVER (IRR)AND PROCESSORS
What it is
- Product or service
- Airframe Structural Components (PSC 1560)
- Industry
- Other Aircraft Parts and Auxiliary Equipment Manufacturing (NAICS 336413)
- Contracting office
- Naval Air Systems Command (N00019)
- Competition
- Not competed · 1 offer received
- Pricing
- Firm fixed price
- How it was bought
- Basic ordering agreement (BOA) · under N0001919G0029
- Solicitation
- N0001921B0316
- Where the work is
- Orange, FL · district FL-10
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
20 subawards totaling -$2.40M (-5419.3% of what was obligated), as Lockheed Martin Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| L3Harris Cincinnati Electronics Corporation | $1.55M | 1 | OH | 2022-10-18 | 2022-10-18 |
| Teradyne Inc | $1.46M | 2 | MA | 2023-03-10 | 2023-03-21 |
| L3Harris Technologies, Inc | $584.4K | 2 | OH | 2024-05-23 | 2024-11-27 |
| The Boeing Company | $568.5K | 1 | MO | 2023-03-27 | 2023-03-27 |
| KVH Industries Inc | $425.8K | 1 | RI | 2022-12-15 | 2022-12-15 |
| Tevet, LLC | $284.6K | 2 | TN | 2023-03-22 | 2023-04-17 |
| One-Way Manufacturing Inc. | $42.0K | 1 | CA | 2022-10-11 | 2022-10-11 |
| Altra Industrial Motion Corp. | $34.2K | 1 | VA | 2022-11-02 | 2022-11-02 |
| K-O Concepts, Inc. | $33.8K | 1 | FL | 2023-04-17 | 2023-04-17 |
| Technical Sales & Applications, Inc. | $31.3K | 1 | FL | 2022-11-28 | 2022-11-28 |
| Avans Machine, Inc | $30.4K | 1 | AL | 2023-09-06 | 2023-09-06 |
| The Captor Corporation | $1.7K | 1 | OH | 2022-11-22 | 2022-11-22 |
| Tti Inc. | -$3.5K | 1 | TX | 2023-03-22 | 2023-03-22 |
| Los Angeles Gauge Co., Inc. | -$20.8K | 1 | CA | 2024-03-27 | 2024-03-27 |
| Extreme Engineering Solutions, Inc. | -$117.2K | 1 | WI | 2022-10-03 | 2022-10-03 |
| Attalon, Inc. | -$7.30M | 2 | CA | 2023-12-08 | 2024-07-17 |
The largest single subawards
| Date | To | Amount | For |
|---|---|---|---|
| 2022-10-18 | L3Harris Cincinnati Electronics Corporation | $1.55M | COMPRESSOR EXPANDER ASSY |
| 2024-07-17 | Attalon, Inc. | $1.05M | AFT ASSEMBLY VALIDATION TEST STATION COMPUTER GENERATED HOLOGRAM NRE FOR RAMP UP |
| 2023-03-10 | Teradyne, Inc. | $742.9K | DESIGN ENG LABOR - CHECKERS & PINMAP UPD DESIGN ENG LABOR-OSCOPE CONFIGURATION SPECTRUM 9100 TESTER. |
| 2023-03-21 | Teradyne, Inc. | $712.4K | SPECTRUM 9100 TESTER |
| 2023-03-27 | The Boeing Company | $568.5K | CONDUCTION-COOLED 3U PROCESSOR GP-872 |
| 2024-05-23 | L3Harris Cincinnati Electronics Corporation | $487.0K | EXPANDER ASSY |
| 2022-12-15 | KVH Industries Inc | $425.8K | INERTIAL RATE SENSOR ASSY |
| 2023-04-17 | Tevet LLC | $235.4K | "NI PXIE-5421 100 MS/S". "NI PXIE-8430/8 RS232 8 PORT". NI 778572-68 PXI-2568 MED-PWR RELAY. NI PXI-2800 CARRIER. NI PXI-2815A CROSS-POINT. NI PXIE-4081 DMM 783130-01. PXIE-2569 100 CH FORM A RELAY. PXIE-5171 PXI… |
| 2024-11-27 | L3Harris Cincinnati Electronics Corporation | $97.4K | EXPANDER ASSY |
| 2023-03-22 | Tevet LLC | $49.1K | DC POWER MODULE 100W 20V 5A W/ OPT-760 DC POWER MODULE 300W 35V 8.5A W/ OPT-760 DC POWER MODULE 300W 60V 5A W/ OPT 760 DC POWER MODULE 50W 5V 10A W/ OPT-760 KEYSIGHT N6702C LOW-PROFILE MAINFRAME RACK MOUNT KIT… |
| 2022-10-11 | One-Way Manufacturing Inc. | $42.0K | TRANSFER LINE ELEV/AZIM |
| 2022-11-02 | Kollmorgen Corp | $34.2K | MOTOR TORQUE-ROLL. |
| 2023-04-17 | K-O Concepts, Inc. | $33.8K | ##ACMAINS-115##115VAC POWER MAINS ##ACMAINS-115##POWER MAINS 115V ##BPV-3/8-SS##BYPASS VALVE ##BPV-3/8-SS##VALVE COOLANT BYPASS ##CCK-3/8##3/8 NPT TO JIC FITTINGS ##CCK-3/8##3/8NPT TO JIC FILLINGS… |
| 2022-11-28 | Technical Sales & Applications, Inc. | $31.3K | IRST LRU CONTAINER |
| 2023-09-06 | Avans Machine, Inc | $30.4K | FAIRING ASSEMBLY |
| 2022-11-22 | The Captor Corporation | $1.7K | EMI FILTER ASSEMBLY |
| 2023-03-22 | Tti Inc. | -$3.5K | CAP BANK ASSEMBLY. |
| 2024-03-27 | Los Angeles Gauge Co., Inc. | -$20.8K | HEAT SINK CORE ELEC |
| 2022-10-03 | Extreme Engineering Solutions, Inc. | -$117.2K | PCB COMPUTER XPEDITE7672 R5 3U VPX. |
| 2023-12-08 | Attalon, Inc. | -$8.35M | OPTICS ASSY TELESCOPE. |
Every action
7 actions since 2023-02-28. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-06-25 | P00009 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO TRANSFER 12 ROIC STORAGE WAFERS FROM ATT. 2 OF THE LMMFC ROIC STORAGE CONTRACT #N0001916G0001 DO #N0001921F0256 TO ATT. 8 OF THE LMMFC LRIP V CONTRACT. |
| 2026-03-04 | P00008 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE PNS UNDER SECTION C. THIS MODIFICATION ALSO UPDATES THE DELIVERY ADDRESS FOR CLIN 0005. AS A CLEAN-UP ITEM, SOW & CDRL SIGNATURE DATES ARE ADDED TO SECTION J TO REFLECT THE P00007 UPDATES. |
| 2026-01-29 | P00007 | Administrative change | $44.2K | THE PURPOSE OF THIS CONTRACT ACTION IS TO ADD CSDR & ATR REQUIREMENTS. |
| 2025-12-09 | P00006 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ERROR FOR PART NUMBER TE-255441-000, REVISION A CHANGE 4 (F-18 FMU INTERFACE CABLE). |
| 2025-07-21 | P00005 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE UPDATED SHIPPING ADDRESSES FOR HARDWARE TO BE DELIVERED UNDER THE CONTRACT AND TO UPDATE THE DESIGNATED TPOC |
| 2025-04-07 | P00004 | Administrative change | $0 | THE PURPOSE OF THIS NO-COST MODIFICATION IS TO (1) CHANGE THE DELIVERY ADDRESS FOR THE FIRST TWO DELIVERIES OF IRRS UNDER CLIN 0002 AND (2) UPDATE THE QUANTITIES OF THE FIRST AND SECOND DELIVERIES UNDER CLIN 0002. |
| 2023-02-28 | P00003 | Administrative change | $0 | TO ATTACH THE IUID LIST TO THE DELIVERY ORDER. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-23). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗