Putting the award page together from the records…
Putting the award page together from the records…
NON-RECURRING ENGINEERING TO QUALIFY A V-22 GEARBOX VIBRATION MONITORING (GVM)/OSPREY DRIVE SYSTEM SAFETY AND HEALTH INFORMATION (ODSSHI)SYSTEM.
Up for re-bid: ends 2026-12-31. Recompete brief → · India Navy Multi-Role Helicopter Follow On Sustainment ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
22 subawards totaling $8.68M (19.5% of what was obligated), as Bell Boeing Joint Project Office reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Rockwell Collins Australia Pty Limited | $2.53M | 2 | VT | 2024-05-01 | 2024-07-31 |
| Spectris PLC | $2.24M | 5 | CA | 2024-05-15 | 2025-01-30 |
| Crystal Instruments Corporation | $1.51M | 1 | CA | 2023-06-26 | 2023-06-26 |
| RTX Corp | $661.0K | 3 | VT | 2023-08-15 | 2025-07-07 |
| Dytran Instruments, Inc. | $636.6K | 1 | CA | 2023-06-21 | 2023-06-21 |
| Projects Unlimited Inc | $418.9K | 2 | OH | 2023-05-03 | 2023-05-03 |
| Shi International Corp. | $273.5K | 2 | NJ | 2023-07-06 | 2023-07-06 |
| Safran Electrical and Power USA, LLC | $126.3K | 1 | TX | 2024-12-18 | 2024-12-18 |
| Good Automation LLC | $125.0K | 1 | TX | 2024-05-08 | 2024-05-08 |
| Duncan Industries, Inc | $51.3K | 1 | CA | 2025-01-15 | 2025-01-15 |
| M2 Global Technology LTD | $38.6K | 1 | TX | 2024-04-22 | 2024-04-22 |
18 actions since 2023-03-08. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-04-30 | P00015 | Administrative change | -$500.0K | THE PURPOSE OF THIS MODIFICATION IS TO REDUCE THE NUMBER OF MV INSTALLATIONS ON CLIN 0006 BY 9 AND TO DEOBLIGATE THE CORRESPONDING FUNDS. |
| 2026-02-20 | P00014 | Funding only | -$2.00M | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS FOR THE REMOVAL OF VSLED MEMORY INCREASE SCOPE. |
| 2025-11-25 | P00013 | Supplemental agreement (work within scope) | $2.00M | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION A FOR ADDITIONAL STORAGE. |
| 2025-09-26 | P00012 | Administrative change | $0 | V-22 ODSSHI ECP NRE PERIOD OF PERFORMANCE EXTENSION |
| 2025-09-04 | P00011 | Additional work (new agreement) | $560.9K | ADDITIONAL VSLED WORK FOR V-22 ODSSHI ECP. |
| 2025-05-22 | P00010 | Change order definitized | $2.98M | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CLIN 0001, NRE, AND TO ADD THE SUBCONTRACTING PLAN. |
| 2025-05-14 | P00009 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE ON CLIN 0006 (MV-22 ODSSHI KIT INSTALLS) TO 30 SEPTEMBER 2025. |
| 2025-04-09 | P00008 | Additional work (new agreement) | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADD SLIN 0003AF, CONNECTOR, AT NSP. |
| 2025-02-12 | AB0002 | Administrative change | $0 | SERVICE CONTRACTS |
| 2025-01-31 | P00007 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE OF CLIN 0006 UNTIL 30 JUNE 2025 FOR V-22 ODSSHI INSTALLS. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
| Glenair, Inc. | $35.9K | 1 | CA | 2025-02-18 | 2025-02-18 |
| B.J.G. Electronics, Inc. | $35.4K | 1 | NY | 2025-05-23 | 2025-05-23 |
| Date | To | Amount | For |
|---|---|---|---|
| 2024-07-31 | Simmonds Precision Products Inc | $2.24M | 901-927-284 INCREMENT E OPTION |
| 2023-06-26 | Crystal Instruments Corporation | $1.51M | DATA RECORDER |
| 2025-01-13 | Dytran Instruments, Inc. | $891.1K | NRE PROTOTYPE/DESIGN/DEVELOPMENT |
| 2023-06-21 | Dytran Instruments, Inc. | $636.6K | NRE EMI/LIGHTNING QUAL |
| 2024-09-09 | Dytran Instruments, Inc. | $567.6K | TRANSDUCER ACCELERATION - HIGH FREQUENCY |
| 2025-01-30 | Dytran Instruments, Inc. | $473.0K | TRANSDUCER ACCELERATION - HIGH FREQUENCY |
| 2025-07-07 | Simmonds Precision Products Inc | $318.5K | NRE FOR 901-927-284 REV B |
| 2024-05-01 | Simmonds Precision Products Inc | $290.9K | TECH SUPPORT PER 901-927-242 |
| 2023-05-03 | Projects Unlimited Inc | $218.6K | WIRING INTEGRATION ASSEMBLY - LH NACELLE |
| 2025-05-14 | Simmonds Precision Products Inc | $217.0K | 901-927-284 INCREMENT A |
| 2023-05-03 | Projects Unlimited Inc | $200.2K | WIRING INTEGRATION ASSY - RH NACELLE |
| 2023-07-06 | Shi International Corp | $197.5K | UNITY 500 2U DPE 25X2.5 DRIVE FLD RCK |
| 2024-08-06 | Dytran Instruments, Inc. | $154.8K | TRANSDUCER ACCELERATION - HIGH FREQUENCY |
| 2024-05-15 | Dytran Instruments, Inc. | $154.8K | TRANSDUCER ACCELERATION - HIGH FREQUENCY |
| 2024-12-18 | Safran Electrical and Power USA, LLC | $126.3K | COMMON AEROSPACE COMMODITIES |
| 2023-08-15 | Simmonds Precision Products Inc | $125.5K | TECH SUPPORT PER 901-927-242 |
| 2024-05-08 | Good Automation LLC | $125.0K | BELL V-22 SOFTWARE |
| 2023-07-06 | Shi International Corp | $76.0K | UNITY 500F DPE 25SFF EMC RACK |
| 2025-01-15 | Duncan Industries, Inc | $51.3K | FIRST ARTICLE INSPECTION (FAI) |
| 2024-04-22 | M2 Global Technology LTD | $38.6K | BRACKET - ENGINE INPUT LATERAL, PRGB LH/ |
| 2025-02-18 | Glenair, Inc. | $35.9K | CONNECTOR BACKSHELL WITH STRAIN RELIEF |
| 2025-05-23 | B.J.G. Electronics, Inc. | $35.4K | CONNECTOR BACKSHELL WITH STRAIN RELIEF |
| 2024-09-19 |
| P00006 |
| Additional work (new agreement) |
| $2.62M |
| THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE PRICE OF CLINS 0004 AND 0005 AND TO PURCHASE ADDITIONAL KITS UNDER CLINS 0007 AND 0008. |
| 2024-09-05 | P00005 | Funding only | $5.15M | FUNDING FOR V-22 ODSSHI SYSTEM |
| 2024-07-11 | P00004 | Funding only | $1.95M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO CLIN 0001, NRE, AND TO CORRECT THE FACILITY CODE. |
| 2024-06-14 | P00003 | Additional work (new agreement) | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADD SCOPE TO CLIN 0001, NRE, WITHOUT INCREASING THE NTE AMOUNT. |
| 2024-02-12 | P00002 | Additional work (new agreement) | $1.81M | OSPREY DRIVE SYSTEM SAFETY AND HEALTH INFORMATION (ODSSHI) MV-22 KIT INSTALLS AND OTHER ADMINISTRATIVE CHANGES |
| 2023-10-27 | AB0001 | Administrative change | $0 | NON-RECURRING ENGINEERING TO QUALIFY A V-22 GEARBOX VIBRATION MONITORING (GVM)/OSPREY DRIVE SYSTEM SAFETY AND HEALTH INFORMATION (ODSSHI)SYSTEM. |
| 2023-09-14 | P00001 | Additional work (new agreement) | $3.73M | UCA MODIFICATION FOR ODSSHI CV ACCELERATION HW KITS. |
| 2023-03-08 | 0 | $26.30M | NON-RECURRING ENGINEERING TO QUALIFY A V-22 GEARBOX VIBRATION MONITORING (GVM)/OSPREY DRIVE SYSTEM SAFETY AND HEALTH INFORMATION (ODSSHI)SYSTEM. |