Putting the award page together from the records…
Putting the award page together from the records…
V-22 THRUST GRIP CONTROL POTENTIOMETER NON-RECURRING ENGINEERING FOR OBSOLESCENCE SOLUTION
Up for re-bid: ends 2027-03-31. Recompete brief → · MV-22 Block B to Block C Mission Computer Obsolescence Initiative Delta Non-Recurring Engineering Integration ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
1 subaward totaling $461.8K (33.5% of what was obligated), as Bell Boeing Joint Project Office reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Guardian Electric Manufacturing Co | $461.8K | 1 | IL | 2024-10-30 | 2024-10-30 |
| Date | To | Amount | For |
|---|---|---|---|
| 2024-10-30 | Guardian Electric Manufacturing Co | $461.8K | COMMON AEROSPACE COMMODITIES |
4 actions since 2024-03-20. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-03-19 | P00003 | Administrative change | $0 | POP EXTENSION TO MARCH 31,2027 ON CLINS 0001 AND 0002 |
| 2025-03-17 | P00002 | Administrative change | $0 | CDRL. SECTION J DELETE AND REPLACE. |
| 2024-04-18 | P00001 | Administrative change | $0 | V-22 POTENTIOMETER OBSOLESCENCE REDESIGN |
| 2024-03-20 | 0 | $1.38M | V-22 THRUST GRIP CONTROL POTENTIOMETER NON-RECURRING ENGINEERING FOR OBSOLESCENCE SOLUTION |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗