Electric Boat Corporation received this contract from Sup of Shipbuilding Groton, Department of the Navy: $14.93B obligated so far for combat ships and landing vessels. It runs to 2036-06-02.
Key facts · data as of Oct 21, 2026
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 21, 2026.
Cite this page: SpendQuery, Award N0002417C2100, data as of Oct 21, 2026, https://spendquery.com/award?id=CONT_AWD_N0002417C2100_9700_-NONE-_-NONE-
Electric Boat Corporation: all federal awards · Department of Defense: spending · Sup of Shipbuilding Groton: what it buys
SSN 802 AND 803 LONG LEAD TIME MATERIAL
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
1957 subawards totaling $1.24B (8.3% of what was obligated), as Electric Boat Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Northrop Grumman Corporation | $414.57M | 11 | CA | 2022-10-17 | 2024-03-06 |
| DC Fabricators Inc | $75.61M | 11 | NJ | 2022-12-02 | 2024-07-17 |
| Esco Technologies Inc. | $70.97M | 41 | CA, MA | 2022-12-06 | 2025-01-24 |
| Austal Limited | $63.22M | 8 | AL | 2022-12-22 | 2024-08-09 |
| Globe Composite Solutions, LLC | $54.17M | 14 | MA | 2023-06-08 | 2023-11-07 |
| Rockwell Collins Australia Pty Limited | $50.86M | 3 | FL | 2022-12-22 | 2024-04-15 |
| Curtiss-Wright Electro-Mechanical Corp | $46.67M | 27 | PA, SC | 2022-12-16 | 2025-01-09 |
| Scot Forge Company | $28.41M | 89 | IL | 2022-10-03 | 2025-01-08 |
| Compagnie De Developpement De L'Eau S.A. | $26.97M | 17 | FL, MN | 2022-10-03 | 2024-09-27 |
| MW Jones & Company Inc | $24.15M | 3 | VA | 2022-10-13 | 2023-07-26 |
| W International, LLC | $21.40M | 26 | MI | 2022-10-21 | 2024-10-09 |
| Rhoads Metal Fabrications, Inc. | $17.55M | 16 | PA | 2022-11-04 | 2024-10-09 |
| Johnson Controls Navy Systems, LLC | $14.43M | 3 | PA | 2023-04-17 | 2023-06-30 |
| Curtiss-Wright Flow Control Service, LLC | $14.26M | 33 | NY | 2023-01-09 | 2024-11-18 |
| Teledyne Instruments Inc | $12.19M | 53 | NH | 2022-10-13 | 2024-10-23 |
| Portland Valve LLC | $10.62M | 17 | MA | 2023-01-19 | 2024-11-22 |
| Allard Nazarian Group, Inc. | $8.01M | 5 | NH | 2023-01-06 | 2024-08-23 |
| Moog Inc. | $7.76M | 6 | OH, VA | 2023-04-17 | 2024-09-05 |
| Pegasus Steel, LLC | $7.20M | 24 | SC | 2022-10-28 | 2025-01-24 |
| L3Harris Technologies, Inc | $7.04M | 20 | MA, MD, NJ, OK, VA | 2022-12-20 | 2025-01-15 |
| Colfax Corporation | $6.63M | 3 | MA | 2023-07-31 | 2023-07-31 |
| Merrill Technologies Group, LLC | $6.36M | 23 | MI | 2023-01-12 | 2024-11-27 |
| Fluid Conditioning Products, Inc. | $5.97M | 14 | PA | 2022-10-27 | 2025-01-24 |
| Foster-Miller, Inc. | $5.97M | 3 | MA | 2023-01-24 | 2023-09-27 |
| Advance Mfg.Co., Inc. | $5.94M | 56 | MA | 2022-10-03 | 2025-01-14 |
The 25 largest of 289; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2023-05-03 | Northrop Grumman Systems Corporation | $85.00M | SEE COMPLETE DESCRIPTION |
| 2023-05-03 | Northrop Grumman Systems Corporation | $85.00M | SEE COMPLETE DESCRIPTION |
| 2022-12-22 | Goodrich Corporation | $50.44M | SEE BELOW |
| 2023-04-21 | Northrop Grumman Systems Corporation | $49.13M | SEE BELOW |
| 2023-04-21 | Northrop Grumman Systems Corporation | $46.87M | SEE BELOW |
| 2024-06-19 | Vacco Industries | $31.59M | SEE BELOW |
| 2022-10-17 | Northrop Grumman Systems Corporation | $25.59M | SEE BELOW |
| 2023-07-27 | Northrop Grumman Systems Corporation | $25.00M | SEE BELOW |
| 2023-07-25 | Northrop Grumman Systems Corporation | $25.00M | SEE BELOW |
| 2023-07-27 | Northrop Grumman Systems Corporation | $25.00M | SEE COMPLETE DESCRIPTION |
| 2023-07-25 | Northrop Grumman Systems Corporation | $25.00M | SEE COMPLETE DESCRIPTION |
| 2022-12-22 | Austal USA, LLC | $24.47M | SEE BELOW |
| 2023-01-02 | Northrop Grumman Systems Corporation | $22.43M | SEE BELOW |
| 2023-04-17 | DC Fabricators Inc | $20.17M | SEE BELOW |
| 2023-05-31 | Johnson Controls Navy Systems, LLC | $14.61M | SEE COMPLETE DESCRIPTION |
| 2023-04-27 | Austal USA, LLC | $12.82M | SEE BELOW |
| 2023-05-05 | DC Fabricators Inc | $12.29M | SEE COMPLETE DESCRIPTION |
| 2023-05-05 | DC Fabricators Inc | $12.29M | SEE BELOW |
| 2023-07-26 | MW Jones & Company Inc | $12.00M | SEE BELOW |
| 2023-07-26 | MW Jones & Company Inc | $12.00M | SEE COMPLETE DESCRIPTION |
| 2023-01-27 | Bae Systems Land & Armaments L.P. | $11.00M | SEE BELOW |
| 2023-06-09 | Rhoads Metal Fabrications, Inc. | $10.91M | SEE COMPLETE DESCRIPTION |
| 2023-07-25 | Austal USA, LLC | $10.60M | SEE COMPLETE DESCRIPTION |
| 2023-01-11 | DC Fabricators Inc | $10.55M | SEE COMPLETE DESCRIPTION |
| 2023-01-11 | DC Fabricators Inc | $10.55M | SEE BELOW |
323 actions since 2022-10-06 (the newest 200 shown). Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-17 | A00384 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO A00362 |
| 2026-07-13 | A00383 | Supplemental agreement (work within scope) | $0 | IN-SERVICE ENGINEERING AGENT TO LOAN BATTERY MONITORING SYSTEM PARTS |
| 2026-07-02 | A00382 | Supplemental agreement (work within scope) | $128.2K | PROCURE SCOTT SELF-CONTAINED BREATHING APPARATUS THERMAL IMAGING MASKS |
| 2026-07-01 | P00068 | Administrative change | -$171.10M | ADMINISTRATIVE ACTION |
| 2026-07-01 | A00381 | Supplemental agreement (work within scope) | $0 | THIS CONTRACT ACTION RECORDS THE TRANSFERS EQUIPMENT FROM ONE HULL TO ANOTHER. |
| 2026-06-26 | P00066 | Administrative change | $984.95M | FUNDING ACTION |
| 2026-06-25 | A00379 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE |
| 2026-06-16 | A00378 | Administrative change | $0 | INCORPORATION OF CHANGES PREVIOUSLY AUTHORIZED UNDER COUPON PROCESS |
| 2026-06-15 | A00377 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE |
| 2026-06-15 | A00376 | Supplemental agreement (work within scope) | $0 | PROCUREMENT OF FLAT IRON TO REPLACE OBSOLESCENCE ITEMS. |
| 2026-06-02 | A00375 | Supplemental agreement (work within scope) | $391.6K | INSTALL IMPROVED DIESEL GENERATOR BLACK START HEAT SHIELD. |
| 2026-05-21 | A00374 | Supplemental agreement (work within scope) | $71.5K | PROCUREMENT OF TWO DS16-SUB WASHERS-EXTRACTORS AND PROVIDE PREVENTATIVE MAINTENANCE AND STORAGE |
| 2026-05-20 | A00373 | Supplemental agreement (work within scope) | $0 | CANCELLATION OF SUBJECT MOD A00259 |
| 2026-05-19 | A00372 | Administrative change | $0 | REVISED BILLING FOR SUBJECT CONTRACT- 4Q25 |
| 2026-05-14 | A00371 | Supplemental agreement (work within scope) | $0 | RADAR EHP UNIT DIVERSION |
| 2026-05-14 | A00370 | Supplemental agreement (work within scope) | $0 | ADDITIVE MANUFACTURE (AM) TRASH DISPOSAL UNIT (TDU) VALVE BODY LINER. |
| 2026-05-12 | A00369 | Supplemental agreement (work within scope) | $16.8K | WATERTIGHT DOOR INSPECTIONS |
| 2026-05-12 | A00368 | Supplemental agreement (work within scope) | $0 | IMPLEMENT STOWAGE CHANGES |
| 2026-05-11 | P00065 | Funding only | -$16.90M | SSN 812 CONSTRUCTION (BOAT 2, FY 24) |
| 2026-05-05 | A00367 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS |
| 2026-04-22 | P00064 | Administrative change | $0 | SSN 812 CONSTRUCTION (BOAT 2, FY 24) |
| 2026-04-15 | A00366 | Supplemental agreement (work within scope) | $23.2K | EXTEND PERIOD PERFORMANCE OF HUNTINGTON HALLS CREW BERTHING THROUGH MAY 2026 |
| 2026-04-07 | A00365 | Supplemental agreement (work within scope) | $593.7K | PROVIDING UNDER 50K COUPONS TO REDUCE DELAYS WHILST COMPLETING WORK WITHIN SCOPE. |
| 2026-04-01 | P00063 | Funding only | $275.15M | SSN 812 CONSTRUCTION (BOAT 2, FY 24) |
| 2026-04-01 | A00364 | Change order definitized | $204.1K | PROCUREMENT OF SELF-CONTAINED BREATHING APPARATUS MASKS |
| 2026-03-23 | A00363 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO MODIFICATION A00343 TO CORRECT APPLICABLE HULLS. |
| 2026-03-18 | A00362 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO MODIFICATION A00304 TO CORRECT MODIFICATION AUTHORITY |
| 2026-03-16 | A00361 | Change order definitized | $51.8K | COST INCREASE AND PERIOD OF PERFORMANCE EXTENSION FOR PROCUREMENT OF TEN WASHERS-EXTRACTORS AND PREVENTATIVE MAINTENANCE AND STORAGE |
| 2026-03-16 | A00360 | Supplemental agreement (work within scope) | $0 | REPLACE DIESEL FRESHWATER HOSE |
| 2026-03-11 | A00359 | Administrative change | $0 | COMPENSATION ADJUSTMENT DECEMBER 2025 |
| 2026-03-11 | A00358 | Change order | $0 | TRANSFER OF GENERATORS BETWEEN MULTIPLE VIRGINIA BLOCK CONTRACTS |
| 2026-03-05 | A00357 | Supplemental agreement (work within scope) | $0 | THE DIVERSION OF A WATERTIGHT DOOR BETWEEN HULLS. |
| 2026-02-25 | A00356 | Administrative change | $0 | ADMIN MOD TO A00355 |
| 2026-02-23 | A00355 | Change order | $0 | DIVERT FLUID FLOW RESTRICTOR CANCELLATION |
| 2026-02-23 | A00354 | Change order | $0 | DIVERT LAB ARRAY MATERIAL CANCELLATION |
| 2026-02-19 | A00353 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO A00352 |
| 2026-02-13 | A00352 | Administrative change | $1 | ADMINISTRATIVE MODIFICATION FOR A00345 |
| 2026-02-12 | A00351 | Change order definitized | $2.38M | LAB ARRAY CABLES DESIGN UPGRADE |
| 2026-02-11 | A00350 | Change order | $0 | DIVERT FLUID FLOW RESTRICTOR |
| 2026-02-11 | A00349 | Change order | $0 | DIVERT FLUID FLOW RESTRICTOR |
| 2026-02-10 | A00348 | Supplemental agreement (work within scope) | $0 | DIVERT SONAR TERMINAL TO THE FLEET |
| 2026-02-09 | A00347 | Supplemental agreement (work within scope) | $0 | DIVERT AFT LOW PRESSURE BLOWER |
| 2026-02-05 | A00346 | Supplemental agreement (work within scope) | $0 | DIVERSION OF MEDICAL CHILL BOX BETWEEN HULLS |
| 2026-01-29 | A00345 | Supplemental agreement (work within scope) | $2.06M | PROCUREMENT OF CONSTANT FLOW FITTINGS |
| 2026-01-28 | A00344 | Administrative change | $0 | REVISED BILLING PRICE 3Q25 |
| 2026-01-06 | P00062 | Additional work (new agreement) | $7.06M | SSN 812 CONSTRUCTION (BOAT 2, FY 24) |
| 2025-12-23 | A00343 | Supplemental agreement (work within scope) | $0 | INCORPORATION OF PREVIOUSLY AUTHORIZED CHANGES UNDER COUPON PROCESS FOR VIRGINIA CLASS AUTHORIZING MOD A00191 |
| 2025-12-22 | A00342 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON-BOARD REPAIR PARTS |
| 2025-12-16 | A00341 | Supplemental agreement (work within scope) | $111.5K | ORDER FOR CREW MESSING/BERTHING AT NEWPORT NEWS SHIPBUILDING |
| 2025-12-15 | A00340 | Supplemental agreement (work within scope) | $598.7K | ESTABLISHMENT OF A PROCESS FOR SHIP'S FORCE WORK CONTROLS DURING NEW CONSTRUCTION. |
| 2025-12-09 | A00339 | Supplemental agreement (work within scope) | $0 | CHANGE IN PROCUREMENT NEEDS FOR ATMOSPHERE MONITORING SYSTEM. |
| 2025-12-09 | A00338 | Supplemental agreement (work within scope) | $0 | DIVERT DIESEL SEA WATER PUMP |
| 2025-12-09 | A00337 | Change order | $0 | PERFORM AIR CONDITIONER TESTING ON VIRGINIA PAYLOAD MODULES |
| 2025-11-24 | A00336 | Supplemental agreement (work within scope) | $1.06M | DESIGN DATA REVIEW TEAM INCORPORATION OF VIRGINIA PAYLOAD MODULE DRAWINGS |
| 2025-11-21 | A00335 | Supplemental agreement (work within scope) | $0 | IMPLEMENTATION OF VIRGINIA CLASS SPECIFICATION CHANGE PROPOSALS |
| 2025-11-20 | A00334 | Supplemental agreement (work within scope) | $0 | DIVERSION OF JOYSTICKS |
| 2025-11-18 | A00333 | Supplemental agreement (work within scope) | $0 | DIVERSION OF DURA-9 SEAM FILLER KITS |
| 2025-11-12 | A00332 | Supplemental agreement (work within scope) | $0 | DIVERSION OF LONG FAIRING ASSEMBLY |
| 2025-11-07 | A00331 | Supplemental agreement (work within scope) | $0 | TRANSFER CENTRAL ATMOSPHERE MONITORING SYSTEM UNITS FOR FLEET TESTING |
| 2025-11-03 | A00330 | Supplemental agreement (work within scope) | $0 | UPDATES ON BOARD REPAIR PARTS STOWAGE REQUIREMENTS IN ACCORDANCE WITH REDESIGN LIST |
| 2025-10-29 | A00329 | Administrative change | $0 | REVISED BILLING FOR SUBJECT CONTRACT - 2Q25 |
| 2025-10-27 | A00328 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION PERIODIC RELEASE JUNE 2024 |
| 2025-10-24 | AZ0015 | Change order definitized | -$151.1K | UPDATE DESCRIPTION TO READ AS FOLLOWS: PROCURE SHIP SERVICE HYDRAULIC OIL COOLER DESIGNS WITH UPGRADED BUNDLES |
| 2025-10-21 | AZ0014 | Change order definitized | $351.1K | MIDBLOCK V INSERTION, VIRGINIA PAYLOAD MODULE FORWARD BULKHEAD MODIFICATIONS |
| 2025-10-21 | A00327 | Supplemental agreement (work within scope) | $382.6K | INCORPORATE DRAIN PUMP MATERIAL CHANGE |
| 2025-10-09 | A00326 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO A00300 |
| 2025-10-08 | AZ0013 | Change order definitized | $3.0K | MODULE DIVERSION |
| 2025-09-30 | AZ0012 | Change order | $0 | MAROTTA VALVES DIVERSION |
| 2025-09-30 | A00325 | Supplemental agreement (work within scope) | $41.49M | EQUITABLE ADJUSTMENT |
| 2025-09-26 | A00324 | Supplemental agreement (work within scope) | $5.3K | DIVERSION OF MODULES |
| 2025-09-18 | AZ0011 | Change order | $123.5K | MICROPROCESSOR BOARDS |
| 2025-09-17 | A00323 | Change order | $0 | STOWAGE REQUIREMENTS |
| 2025-09-17 | A00322 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE |
| 2025-09-17 | A00321 | Change order | $0 | MATERIAL DIVERSION |
| 2025-09-16 | A00320 | Change order | $0 | MATERIAL DIVERSION |
| 2025-09-16 | A00319 | Supplemental agreement (work within scope) | $0 | DIVERT TWO (2) LONG FAIRING ASSEMBLY |
| 2025-09-10 | P00061 | Funding only | $6.92M | SSN 812 CONSTRUCTION (BOAT 2, FY 24) |
| 2025-09-08 | A00318 | Change order | $0 | THIN LINE TOWED ARRAY HANDLING SYSTEM REDUCED WRAP CAPSTAN ASSEMBLY MODIFIED DESIGN IMPLEMENTATION |
| 2025-08-29 | A00317 | Change order | $0 | WEAPONS SHIPPING TRUNK ALIGNMENT OF UPPER HATCH FAIRING |
| 2025-08-25 | A00316 | Supplemental agreement (work within scope) | $0 | WEAPONS SHIPPING TRUNK ALIGNMENT OF UPPER HATCH FAIRING |
| 2025-08-20 | A00315 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE |
| 2025-08-19 | AZ0010 | Change order definitized | $270.1K | ADDITIONAL SHIP SYSTEM TURBINE GENERATOR TESTING |
| 2025-08-13 | A00314 | Supplemental agreement (work within scope) | $0 | DIVERT DIFFERENTIAL PRESSURE DETECTOR TO ANOTHER SHIP |
| 2025-08-11 | A00313 | Change order | $0 | REPLACE FLIGHT CONTROL JOYSTICK |
| 2025-08-05 | A00312 | Supplemental agreement (work within scope) | $0 | INCORPORATES LIABILITY COVERAGE FOR THE BALANCE TESTING OF THE MAIN PROPULSION UNIT, A FUTURE DESIGN EFFORT, INTO THE CONSTRUCTION CONTRACT. |
| 2025-08-04 | AZ0009 | Change order definitized | $117.6K | SAIL CONDUCTIVITY, TEMPERATURE, AND DEPTH SENSOR REDESIGN |
| 2025-08-04 | AZ0008 | Supplemental agreement (work within scope) | $2.56M | TANK LEVEL INDICATION CONNECTOR REDESIGN |
| 2025-07-28 | P00060 | Administrative change | $0 | SSN 812 CONSTRUCTION (BOAT 2, FY 24) |
| 2025-07-21 | A00310 | Supplemental agreement (work within scope) | $25.00M | PROCUREMENT OF FIVE ONBOARD REPAIR PART SHIP-SETS |
| 2025-07-03 | A00309 | Supplemental agreement (work within scope) | $171.6K | NON-CONDUCTIVE COATING AND LOW SMOKE COATING EARLY IMPLEMENTATION OF SELECT COMPONENTS |
| 2025-07-02 | A00308 | Supplemental agreement (work within scope) | $45.1K | ORDER 9920 COMMON WEAPON LAUNCHER ANALOG DEVICES |
| 2025-07-01 | A00307 | Administrative change | $0 | REVISED BILLING PRICE THROUGH 1ST QUARTER 2025 |
| 2025-06-25 | A00306 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE |
| 2025-06-18 | A00305 | Supplemental agreement (work within scope) | $115.7K | PROCUREMENT OF CONSTRUCTION SPARES FOR INSULATED-GATE BIPOLAR TRANSISTORS |
| 2025-06-18 | A00304 | Change order | $0 | DIVERSION OF HULL PENETRATOR ASSEMBLY |
| 2025-06-17 | A00303 | Supplemental agreement (work within scope) | $0 | STOWAGE FOR VIRGINIA CLASS |
| 2025-06-04 | A00302 | Supplemental agreement (work within scope) | $121.2K | PROCURE CAMERA COMPONENTS |
| 2025-06-03 | A00301 | Change order | $676.9K | PROCUREMENT OF SHIP SERVICE HYDRAULIC OIL COOLER DESIGNS |
| 2025-06-03 | A00300 | Supplemental agreement (work within scope) | $0 | INSTALL ADVANCED MATERIAL TAILCONE VERSION 3 |
| 2025-05-28 | A00299 | Supplemental agreement (work within scope) | $0 | WATERTIGHT DOOR INSTALLATION |
| 2025-05-27 | A00298 | Supplemental agreement (work within scope) | $0 | DIVERT THE STERN PLANE OPERATING ROD |
| 2025-05-13 | A00297 | Supplemental agreement (work within scope) | $4.53M | GOVERNMENT FURNISHED REPAIR QUICK RESPONSE ACTIONS |
| 2025-05-09 | A00296 | Administrative change | $0 | UPDATES WEIGHT AND MOMENT DATA ON CHANGE ORDER MODIFICATION A00079 |
| 2025-05-09 | A00295 | Supplemental agreement (work within scope) | $0 | DIVERT DIESEL GENERATOR CONTROL MODULES |
| 2025-05-07 | A00294 | Administrative change | $0 | PERIODIC RELEASE OF CLAIMS - 31 DEC 24 |
| 2025-04-30 | PZ0059 | Additional work (new agreement) | $8.38B | SSN 812 CONSTRUCTION (BOAT 2, FY 24) |
| 2025-04-28 | A00293 | Supplemental agreement (work within scope) | $0 | INSTALLATION OF UNDERSEA DOMINANCE GROUP |
| 2025-04-23 | A00292 | Administrative change | $0 | UPDATING OVERTIME PREMIUM CLAUSE VALUE |
| 2025-04-17 | A00291 | Supplemental agreement (work within scope) | $0 | GENERATION 2 POWER CONVERSION MODULE LOCAL CONTROL PANEL UPGRADE |
| 2025-04-16 | A00290 | Supplemental agreement (work within scope) | $0 | DIVERT OUTER STRUCTURE OUTER DIAMETER REFERENCE CELL AND ANODE CABLE ASSEMBLIES |
| 2025-04-10 | A00289 | Administrative change | $0 | REVISED BILLING PRICE 4Q24 |
| 2025-04-09 | A00288 | Supplemental agreement (work within scope) | $117.6K | OFF-SHIP CREW BERTHING AND MESSING |
| 2025-04-08 | A00287 | Supplemental agreement (work within scope) | $0 | HIGH PRESSURE DRAIN SYSTEM DRAWING CHANGES |
| 2025-04-07 | A00286 | Change order definitized | $3.81M | INCORPORATE SPECTROSCOPY EQUIPMENT |
| 2025-04-01 | A00285 | Administrative change | $0 | UPDATE WEIGHTS FOR A00232 |
| 2025-03-14 | A00284 | Change order | $0 | BERTHING DOOR MODIFICATION |
| 2025-03-13 | A00283 | Administrative change | $0 | JANUARY 2025 ESCALATION |
| 2025-03-12 | A00282 | Supplemental agreement (work within scope) | $0 | GOVERNMENT PROPERTY TRANSFER |
| 2025-03-11 | A00281 | Supplemental agreement (work within scope) | $0 | DIVERT HYD SIMPLEX PUMP #1 |
| 2025-03-06 | A00280 | Supplemental agreement (work within scope) | $463.1K | DELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS |
| 2025-03-03 | A00279 | Supplemental agreement (work within scope) | $97.2K | DESIGN DATA REVIEW TEAM, ENGINEERING REPORT INTERNAL, COUNTERMEASURE LAUNCHER HULL INSERT. |
| 2025-02-28 | A00278 | Supplemental agreement (work within scope) | $346.9K | DESIGN DATA REVIEW TEAM - SHOCK CLEARANCE ISSUE |
| 2025-02-26 | A00277 | Change order | $0 | NON-CONDUCTIVE COATING AND LOW SMOKE COATING EARLY IMPLEMENTATION OF SELF COMPONENTS |
| 2025-02-20 | A00276 | Change order | $1.25M | PURCHASE OF PASSIVE LAB ARRAY CABLE ASSY |
| 2025-02-13 | A00275 | Change order | $0 | BRIDGE ACCESS TRUNK HATCH DIVERSION CHANGE HULL APPLICABILITY |
| 2025-02-13 | A00274 | Supplemental agreement (work within scope) | $0 | JOINT FLEET MAINTENANCE MANUAL REVISION D CHANGE 4 |
| 2025-02-13 | A00273 | Supplemental agreement (work within scope) | $0 | IMPLEMENTS ADDITIVE MANUFACTURING OF TRASH DISPOSAL UNIT LINER |
| 2025-02-12 | A00272 | Supplemental agreement (work within scope) | $0 | DIVERT ELECTRICAL HULL PENETRATOR ASSEMBLY |
| 2025-02-04 | A00271 | Supplemental agreement (work within scope) | $0 | DIVERT SHIP CONTROL JOYSTICK DATA CABLES |
| 2025-02-04 | A00270 | Supplemental agreement (work within scope) | $0 | DIVERT PIGTAIL CABLE ASSEMBLIES |
| 2025-02-04 | A00269 | Supplemental agreement (work within scope) | $0 | MODIFY STOP BOLT NEW CONSTRUCTION TEST PROCEDURES |
| 2025-01-30 | A00268 | Change order | $0 | IMPLEMENTATION OF NON-CONDUCTIVE COATINGS |
| 2025-01-23 | A00267 | Administrative change | $0 | CHANGE TO A00248 |
| 2025-01-23 | A00266 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS |
| 2025-01-22 | A00265 | Administrative change | $0 | GOVERNMENT PROPERTY TRANSFER |
| 2025-01-21 | A00264 | Change order definitized | $1.50M | BUOYANT CABLE ANTENNA HANDLING SYSTEM UPGRADES |
| 2025-01-15 | A00263 | Change order | $0 | EARLY IMPLEMENTATION OF CAPSTAN NON-CONDUCTIVE COATING AND LOW SMOKE COATING |
| 2025-01-07 | P00058 | Funding only | $188.00M | SSN 804 CONSTRUCTION (BOAT 1, FY20) |
| 2024-12-30 | A00262 | Supplemental agreement (work within scope) | $0 | DIVERT CHIN ARRAY PROJECTOR CABLING |
| 2024-12-20 | A00261 | Change order | $0 | MAIN PROPULSION UNIT PROPULSION TURBINE THROTTLE CONTROL TESTING PHASE 1 AND PHASE 2 |
| 2024-12-20 | A00260 | Supplemental agreement (work within scope) | $2.81M | PROCURE SERVOVALVES |
| 2024-12-19 | A00259 | Change order | $0 | DAMAGE CONTROL CONEX BOXES |
| 2024-12-19 | A00258 | Supplemental agreement (work within scope) | $0 | DIVERT VIRGINIA PAYLOAD TUBE CABLING |
| 2024-12-19 | A00257 | Supplemental agreement (work within scope) | $6.76M | LIMITS TO WELD BUILDUP |
| 2024-12-12 | A00255 | Supplemental agreement (work within scope) | $0 | DIVERT SECONDARY PROPULSION UNIT (SPU) CABLE TENSIONING DEVICE |
| 2024-12-09 | A00254 | Administrative change | $0 | 3RD QUARTER 2024 REVISED BILLING |
| 2024-12-05 | P00057 | Administrative change | $0 | SSN 804 CONSTRUCTION (BOAT 1, FY20) |
| 2024-12-04 | A00253 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE OBRP |
| 2024-11-27 | A00252 | Supplemental agreement (work within scope) | $0 | AIR PARTICLE DETECTOR REMOVAL |
| 2024-11-26 | A00251 | Supplemental agreement (work within scope) | $0 | DIVERT WEAPONS HOIST ENCODER |
| 2024-11-05 | A00250 | Supplemental agreement (work within scope) | $330.8K | HIGH PRESSURE AIR COMPRESSOR DRIP TRAY REPLACEMENT |
| 2024-11-04 | AZ0007 | Change order definitized | $271.2K | PROCURE RHEOSTAT PLATE ASSEMBLIES |
| 2024-11-04 | A00249 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT ERROR |
| 2024-11-04 | A00248 | Supplemental agreement (work within scope) | $64.1K | DELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS (LETTER #90) |
| 2024-10-29 | A00247 | Supplemental agreement (work within scope) | $89.5K | REPLACE MAIN SEA WATER VALVE |
| 2024-10-29 | A00246 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT A00243 |
| 2024-10-28 | A00245 | Supplemental agreement (work within scope) | $371.5K | RUDDER WORK |
| 2024-10-25 | A00244 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS |
| 2024-10-24 | A00243 | Supplemental agreement (work within scope) | $562.4K | REVERSE OSMOSIS BRINE DISCHARGE RELIEF VALVE AND INLET PIPING DESIGN CHANGE |
| 2024-10-23 | A00242 | Supplemental agreement (work within scope) | $155.4K | OFF-SHIP CREW BERTHING AND MESSING FACILITY |
| 2024-10-16 | P00056 | Funding only | $6.90M | SSN 804 CONSTRUCTION (BOAT 1, FY20) |
| 2024-10-16 | A00241 | Supplemental agreement (work within scope) | $4.14M | THIN LINE TOWED ARRAY HANDLING SYSTEM OUTBOARD SIGNAL PATH UPGRADE |
| 2024-10-15 | A00240 | Change order | $0 | DIVERT FLUID FLOW RESTRICTOR |
| 2024-10-10 | A00239 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO A00206 |
| 2024-10-10 | A00238 | Supplemental agreement (work within scope) | $0 | DIVERT LINEAR TRANSDUCER |
| 2024-10-08 | P00055 | Funding only | $658.50M | SSN 804 CONSTRUCTION (BOAT 1, FY20) |
| 2024-10-07 | A00237 | Supplemental agreement (work within scope) | $16.0K | EMERGENCY DIESEL GENERATOR TROUBLESHOOTING LAPTOP OBSOLESCENCE |
| 2024-09-25 | A00236 | Supplemental agreement (work within scope) | $0 | CABINET VENDOR UPGRADE AND RETROFIT |
| 2024-09-19 | A00235 | Supplemental agreement (work within scope) | $123.8K | POTASSIUM CHROMATE SOLUTION RE-USE |
| 2024-09-13 | A00234 | Supplemental agreement (work within scope) | $0 | DIVERTING CIRCUIT CONNECTORS |
| 2024-09-12 | A00233 | Administrative change | $0 | 2ND QUARTER 2024 REVISED BILLING |
| 2024-08-30 | A00232 | Change order | $393.3K | ADDITIONAL CATHODIC PROTECTION IN THE MUD TANKS. |
| 2024-08-28 | P00054 | Administrative change | $0 | SSN 804 CONSTRUCTION (BOAT 1, FY20) |
| 2024-08-22 | A00231 | Supplemental agreement (work within scope) | $0 | GOVERNMENT PROPERTY TRANSFER |
| 2024-08-15 | A00230 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS |
| 2024-08-02 | A00229 | Supplemental agreement (work within scope) | $3.39M | DESIGN DATA REVIEW TEAM ENGINEERING REPORT WEAPON LAUNCH CONSOLE REDESIGN |
| 2024-07-31 | A00228 | Administrative change | $0 | RELEASE OF CLAIMS |
| 2024-07-29 | A00227 | Supplemental agreement (work within scope) | $0 | IMPLEMENTS SEVEN ADMINISTRATIVE SPECIFICATION CHANGE PROPOSALS |
| 2024-07-17 | A00226 | Supplemental agreement (work within scope) | $275.6K | WEAPONS SHIPPING TRUNK SPRINGS |
| 2024-07-10 | A00225 | Supplemental agreement (work within scope) | $199.2K | PROPULSION TURBINE THROTTLE CONTROL CABINETS TESTING |
| 2024-07-10 | A00224 | Change order definitized | $456.8K | PROCURE NON-CONDUCTIVE COATING (NCC) UPGRADED CAPSTAN MATERIALS |
| 2024-07-03 | A00223 | Supplemental agreement (work within scope) | $29.6K | CHANGE TO MAIN COOLANT-3 TEST PROCEDURE AND CONTROL DRIVE MECHANISM TECHNICAL MANUAL |
| 2024-07-01 | A00222 | Administrative change | $0 | RECORD COMPENSATION ADJUSTMENTS THROUGH APRIL 2024 |
| 2024-06-26 | P00053 | Funding only | $4.60M | SSN 804 CONSTRUCTION (BOAT 1, FY20) |
| 2024-06-17 | A00221 | Administrative change | $0 | 1ST QUARTER 2024 REVISED BILLING |
| 2024-06-05 | A00220 | Change order | $0 | ESTABLISH PROCESS FOR SHIP FORCE WORK CONTROLS DURING NEW CONSTRUCTION |
| 2024-05-31 | A00219 | Change order | $0 | MIDBLOCK INSERTION, VIRGINIA FORWARD BULKHEAD MODIFICATIONS |
| 2024-05-09 | A00218 | Supplemental agreement (work within scope) | $0 | GOVERNMENT PROPERTY TRANSFER |
| 2024-04-25 | A00217 | Change order | $0 | IMPLEMENTS REQUIRED STRUCTURAL FOUNDATION CHANGES |
| 2024-04-24 | A00216 | Supplemental agreement (work within scope) | $7.9K | MATERIAL DIVERSION SHIPPING COST |
| 2024-04-22 | A00215 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO ADD UNPRICED CONTRACT ACTION MODIFICATIONS AND A WEIGHT STATEMENT RESULT |
| 2024-04-22 | A00214 | Supplemental agreement (work within scope) | $0 | DIVERT MATERIAL FOR GOVERNMENT USE. |
| 2024-04-22 | A00213 | Change order | $0 | PURCHASE LONG LEAD TIME MATERIAL TO SUPPORT COMMON WEAPON LAUNCHER |
| 2024-04-16 | A00212 | Change order | $335.0K | ADDITIONAL SHIP SYSTEM TURBINE GENERATOR TESTING PHASE 1 |
| 2024-04-12 | A00211 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS |
| 2024-04-12 | A00210 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS |
| 2024-04-11 | A00209 | Supplemental agreement (work within scope) | $0 | DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS (LETTER #116) |
| 2024-04-10 | A00208 | Supplemental agreement (work within scope) | $0 | DIVERT THIN LINE TOWED ARRAY OUTBOARD SENSOR ASSEMBLY |
| 2024-04-09 | A00207 | Change order | $0 | AUTHORIZES DIVERSION OF CABLES FOR GOV'T USE. |
| 2024-04-05 | A00206 | Change order | $164.0K | PROCURE MICROPROCESSOR BOARDS |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗