Huntington Ingalls Inc received this contract from Sup of Shipbuilding Conv and Repair, Department of the Navy: $8.62M obligated so far for combat ships and landing vessels. Its period of performance ended 2021-08-21.
Key facts · data as of Oct 23, 2026
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 23, 2026.
Cite this page: SpendQuery, Award N0002417C2105, data as of Oct 23, 2026, https://spendquery.com/award?id=CONT_AWD_N0002417C2105_9700_-NONE-_-NONE-
Huntington Ingalls Inc: all federal awards · Department of Defense: spending · Sup of Shipbuilding Conv and Repair: what it buys
FY17 RCOH ACCOMPLISHMENT
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
1688 subawards totaling $211.92M (2457.3% of what was obligated), as Huntington Ingalls Inc reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Main Industries Inc. | $157.64M | 1172 | CA, VA | 2022-10-10 | 2023-05-16 |
| American Maritime Holdings, LLC | $15.16M | 164 | CA, VA | 2022-10-05 | 2023-06-28 |
| Mid-Atlantic Coatings Inc | $14.16M | 4 | VA | 2023-03-22 | 2023-07-06 |
| NTT Data Fedhealth, Inc. | $9.27M | 1 | VA | 2023-04-26 | 2023-04-26 |
| Aqua-Chem, Inc. | $6.28M | 64 | TN | 2023-06-02 | 2023-06-02 |
| Atlantic Constructors LLC | $1.59M | 1 | VA | 2025-05-13 | 2025-05-13 |
| Curtiss-Wright Corporation | $904.8K | 17 | NY, PA, VA | 2022-10-05 | 2023-12-20 |
| Domestic Fuels & Lubes, Inc. | $885.9K | 3 | VA | 2022-10-25 | 2022-10-27 |
| Fluid Power Solution LLC | $857.8K | 36 | OH | 2023-03-13 | 2023-09-27 |
| Southern Fasteners & Supply, Inc. | $588.0K | 1 | NC | 2025-04-13 | 2025-04-13 |
| Rix Industries | $564.0K | 10 | CA | 2023-04-12 | 2023-04-28 |
| Seaward Marine Corporation | $556.6K | 6 | VA | 2023-03-23 | 2023-05-01 |
| Northrop Grumman Systems Corporation | $352.4K | 5 | CA | 2023-03-02 | 2023-06-27 |
| In-Place Machining Company, LLC | $213.7K | 2 | WI | 2022-11-11 | 2022-11-23 |
| Scot Forge Company | $204.9K | 8 | IL | 2023-03-13 | 2023-07-20 |
| Tar LLC | $198.4K | 1 | CT | 2022-10-14 | 2022-10-14 |
| Electric Motor and Contracting Company | $195.1K | 16 | VA | 2022-10-06 | 2023-02-23 |
| Hampton Rubber Company | $183.7K | 13 | VA | 2023-06-19 | 2024-01-26 |
| Timken Gears & Services Inc. | $178.7K | 3 | PA | 2023-05-04 | 2023-05-17 |
| The Timken Company | $156.7K | 4 | PA | 2023-04-03 | 2023-04-24 |
| Delta Centrifugal, LLC | $130.4K | 1 | TX | 2024-03-06 | 2024-03-06 |
| Wesco Distribution, Inc. | $130.0K | 1 | VA | 2025-06-13 | 2025-06-13 |
| Colfax Corporation | $129.5K | 2 | MA | 2023-09-26 | 2023-09-26 |
| L3Harris Technologies, Inc | $121.6K | 9 | PA, VA | 2022-10-18 | 2023-05-16 |
| R. S. Harritan & Company, Inc. | $117.2K | 3 | VA | 2023-03-31 | 2023-03-31 |
The 25 largest of 43; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2023-04-26 | NTT Data Federal Services, Inc. | $9.27M | INFORMATION ASSURANCE ENGINEERS PROGRAM MANAGER SYSTEM ADMINISTRATOR NETWORK ENGINEER CONFIG MGT/ ASSET MGT CONFIG MGMT/ SFIMS ADMIN CVNIT TRAINING CVNIT VAN RENTAL |
| 2023-04-19 | Main Industries, Inc. | $5.71M | FLIGHT DECK NONSKID |
| 2023-03-27 | Main Industries, Inc. | $5.71M | FLIGHT DECK NONSKID |
| 2022-12-14 | Main Industries, Inc. | $5.71M | PO 4500661212 PO ITEM NO. 1 - FLIGHT DECK NONSKID |
| 2023-04-27 | Main Industries, Inc. | $5.71M | FLIGHT DECK NONSKID |
| 2022-10-10 | Main Industries, Inc. | $5.71M | PO 4500661212 PO ITEM NO. 1 - FLIGHT DECK NONSKID |
| 2023-03-30 | Main Industries, Inc. | $5.71M | FLIGHT DECK NONSKID |
| 2023-03-29 | Main Industries, Inc. | $5.71M | FLIGHT DECK NONSKID |
| 2023-04-12 | Main Industries, Inc. | $5.71M | FLIGHT DECK NONSKID |
| 2022-12-13 | Main Industries, Inc. | $5.71M | PO 4500661212 PO ITEM NO. 1 - FLIGHT DECK NONSKID |
| 2022-10-31 | Main Industries, Inc. | $5.71M | PO 4500661212 PO ITEM NO. 1 - FLIGHT DECK NONSKID |
| 2023-02-10 | Main Industries, Inc. | $5.71M | PO 4500661212 PO ITEM NO. 1-FLIGHT DECK NONSKID |
| 2022-11-07 | Main Industries, Inc. | $5.71M | PO 4500661212 PO ITEM NO. 1 - FLIGHT DECK NONSKID |
| 2023-07-06 | Mid-Atlantic Coatings Inc | $3.57M | T&M FREEBOARD NEW & DISTURBED DAMAGE T/U |
| 2023-06-05 | Mid-Atlantic Coatings Inc | $3.57M | T&M FREEBOARD NEW & DISTURBED DAMAGE T/U |
| 2023-04-18 | Mid-Atlantic Coatings Inc | $3.54M | T&M FREEBOARD NEW & DISTURBED DAMAGE T/U |
| 2023-03-22 | Mid-Atlantic Coatings Inc | $3.49M | T&M FREEBOARD NEW & DISTURBED DAMAGE T/U |
| 2023-04-19 | Main Industries, Inc. | $2.54M | HANGER BAY NONSKID |
| 2023-02-10 | Main Industries, Inc. | $2.54M | PO 4500661212 PO ITEM NO. 2-HANGER BAY NONSKID |
| 2023-03-29 | Main Industries, Inc. | $2.54M | HANGER BAY NONSKID |
| 2022-10-31 | Main Industries, Inc. | $2.54M | PO 4500661212 PO ITEM NO. 2 - HANGER BAY NONSKID |
| 2023-04-27 | Main Industries, Inc. | $2.54M | HANGER BAY NONSKID |
| 2022-11-07 | Main Industries, Inc. | $2.54M | PO 4500661212 PO ITEM NO. 2 - HANGER BAY NONSKID |
| 2022-10-10 | Main Industries, Inc. | $2.54M | PO 4500661212 PO ITEM NO. 2 - HANGER BAY NONSKID |
| 2023-04-12 | Main Industries, Inc. | $2.54M | HANGER BAY NONSKID |
77 actions since 2022-10-04. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-06-25 | A00134 | Supplemental agreement (work within scope) | $0 | ADJUDICATE FMRS FOR THE PERIOD OF 12 MARCH 2019 THROUGH 19 JUNE 2026. |
| 2026-06-24 | A00133 | Supplemental agreement (work within scope) | $0 | EQUIPMENT DISPOSITIONED FROM CONTRACT CVN 73EX: N00024-17-C-2105 TO HIINC-NNS. |
| 2026-06-12 | P00066 | Supplemental agreement (work within scope) | $4.61M | CVN 73 RCOH CONTRACT CLOSEOUT |
| 2026-05-12 | A00132 | Supplemental agreement (work within scope) | $0 | CVN 73 (EX) PERIODIC RELEASE MODIFICATION 1 JAN 2025- 30 JUN 2025 |
| 2026-03-04 | A00131 | Supplemental agreement (work within scope) | $0 | TRANSFER GOVERNMENT FROM CVN 75 (AP) TO CVN 73 (EX) |
| 2025-12-19 | A00130 | Supplemental agreement (work within scope) | $0 | TO TRANSFER GOVERNMENT PROPERTY FROM N00024-17-C-2105 (CVN73 EXECUTION) TO N00024-21-C-2106 (CVN74 EXECUTION) AND N00024-24-C-2106 (CVN74 AP) |
| 2025-11-19 | A00129 | Supplemental agreement (work within scope) | $0 | PERIODIC RELEASE MODIFICATION |
| 2025-09-02 | A00128 | Supplemental agreement (work within scope) | $0 | TRANSFER OF GOVERNMENT PROPERTY FROM CVN 73 EXECUTION CONTRACT TO CVN 75 ADVANCE PLANNING CONTRACT. |
| 2025-07-31 | A00127 | Supplemental agreement (work within scope) | $0 | FY16 RCOH ACCOMPLISHMENT TRANSFER GOVERNMENT FURNISHED MATERIAL FROM CVN73 EXC TO FACILITIES. |
| 2025-05-21 | A00126 | Supplemental agreement (work within scope) | $0 | CVN 73 (EX) PERIODIC RELEASE MODIFICATION 1 JAN 2024- 30 JUN 2024 |
| 2024-12-19 | A00125 | Supplemental agreement (work within scope) | $0 | TRANSFER PROPERTY FROM CONTRACT N00024-17-C-2105 (CVN 73 EXECUTION) TO CONTRACT N00024-24-C-2106 (CVN 75 ADVANCED PLANNING). |
| 2024-11-06 | A00124 | Supplemental agreement (work within scope) | $0 | FY16 RCOH ACCOMPLISHMENT |
| 2024-08-29 | A00123 | Supplemental agreement (work within scope) | $0 | FY16 RCOH ACCOMPLISHMENT |
| 2024-08-27 | A00122 | Supplemental agreement (work within scope) | $0 | FY16 RCOH ACCOMPLISHMENT |
| 2024-07-26 | A00121 | Supplemental agreement (work within scope) | $0 | TRANSFER OF MATERIAL FROM CVN73 EXECUTION CONTRACT TO CVN75 ADVANCED PLANNING CONTRACT. |
| 2024-07-18 | A00120 | Supplemental agreement (work within scope) | $0 | TO PROVIDE DISPOSITION INFORMATION FOR MATERIAL FROM CVN 73 EX CONTRACT N00024-17-C-2105. |
| 2024-06-25 | A00119 | Supplemental agreement (work within scope) | $0 | GOVERNMENT PROPERTY TRANSFER TO CVN 74. |
| 2024-05-16 | A00118 | Supplemental agreement (work within scope) | $0 | GOVERNMENT PROPERTY TRANSFER TO THE FACILITATES USE CONTRACT AND CVN 784 EX |
| 2024-05-03 | A00117 | Supplemental agreement (work within scope) | $0 | PRM 1 JAN - 30 JUN 2023 |
| 2024-03-05 | A00116 | Supplemental agreement (work within scope) | $0 | IDENTIFY WORK ITEMS TO E&S AMOUNT (13 JAN 2024-16 FEB 2024). |
| 2024-02-02 | A00115 | Supplemental agreement (work within scope) | $0 | CVN 73 ADJUDICATION MODIFICATION (16 DEC- 12 JAN 24) |
| 2024-01-24 | A00114 | Supplemental agreement (work within scope) | $0 | CVN 73 ADJUDICATION MOD (18 NOV- 15 DEC 23) |
| 2023-11-30 | A00113 | Supplemental agreement (work within scope) | $0 | N00024-17-C-2105 NOVEMBER ADJUDICATION MOD |
| 2023-11-21 | A00112 | Supplemental agreement (work within scope) | $0 | N00024-17-C-2105 GFP MOD TO N00024-21-C-2106 |
| 2023-11-09 | A00111 | Supplemental agreement (work within scope) | $0 | PERIODIC RELEASE MOD 1 JUL - 31 DEC 2022 |
| 2023-10-24 | A00110 | Supplemental agreement (work within scope) | $0 | N00024-17-C-2105 OCTOBER ADJUDICATION MOD |
| 2023-10-13 | A00109 | Supplemental agreement (work within scope) | $0 | N00024-17-C-2105 GFP MOD TO N00024-21-C-2106 |
| 2023-09-26 | P00064 | Funding only | $331.7K | FY16 RCOH ACCOMPLISHMENT |
| 2023-09-21 | A00108 | Supplemental agreement (work within scope) | $0 | N00024-17-C-2105 AUGUST ADJUDICATION MOD |
| 2023-09-18 | P00063 | Funding only | $519.3K | FY16 RCOH ACCOMPLISHMENT |
| 2023-09-13 | A00107 | Supplemental agreement (work within scope) | $0 | GFP MOD FROM N00017-C-2105 TO N00024-21-C-2106 |
| 2023-08-24 | P00062 | Funding only | $3.16M | FY16 RCOH ACCOMPLISHMENT |
| 2023-08-09 | A00106 | Supplemental agreement (work within scope) | $0 | GOVERNMENT PROPERTY MOD FROM N00024-17-C-2105 TO N00024-21-C-2106 |
| 2023-08-08 | A00105 | Supplemental agreement (work within scope) | $0 | N00024-17-C-2105 ADJUDICATION MOD |
| 2023-07-25 | A00104 | Supplemental agreement (work within scope) | $0 | TRANSFER GOVERNMENT FURNISHED PROPERTY TO N0002421C2106 |
| 2023-07-03 | A00103 | Supplemental agreement (work within scope) | $0 | CVN 73 JUNE ADJUDICATION MOD |
| 2023-05-16 | P00061 | Supplemental agreement (work within scope) | $0 | FY16 RCOH ACCOMPLISHMENT |
| 2023-05-12 | A00102 | Supplemental agreement (work within scope) | $0 | CVN 73 PRM 1 JAN - 30 JUN 2022 |
| 2023-05-03 | A00101 | Supplemental agreement (work within scope) | $0 | CVN 73 ADJUDICATION MOD |
| 2023-03-02 | A00100 | Supplemental agreement (work within scope) | $0 | GOVERNMENT PROPERTY TRANSFER TO CVN74 |
| 2023-03-01 | A00099 | Supplemental agreement (work within scope) | $0 | CVN 73 ADJUDICATION MOD |
| 2023-01-27 | A00098 | Supplemental agreement (work within scope) | $0 | CVN 73 JANUARY ADJUDICATION MOD |
| 2023-01-17 | A00097 | Administrative change | $0 | CVN 73 DECEMBER ADJUDICATION MOD |
| 2022-12-21 | A00096 | Supplemental agreement (work within scope) | $0 | CVN 73 ADJUDICATION MOD |
| 2022-11-28 | A00095 | Supplemental agreement (work within scope) | $0 | CVN 73 HURRICANE ELSA STORM PREP |
| 2022-11-23 | A42013 | Change order | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-11-23 | A00094 | Supplemental agreement (work within scope) | $0 | FY16 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-11-18 | A42012 | Supplemental agreement (work within scope) | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-11-16 | A42011 | Supplemental agreement (work within scope) | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-11-09 | A00093 | Supplemental agreement (work within scope) | $0 | CVN 73 ADJUDICATION MOD |
| 2022-11-07 | A42010 | Supplemental agreement (work within scope) | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-11-04 | A42008 | Supplemental agreement (work within scope) | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-11-04 | A42007 | Supplemental agreement (work within scope) | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-11-02 | A42009 | Change order | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-11-02 | A42006 | Change order | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-11-01 | A42005 | Change order | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-28 | A42004 | Change order | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-27 | A42003 | Change order | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-26 | A42002 | Change order | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-25 | A41998 | Supplemental agreement (work within scope) | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-24 | A42001 | Change order | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-24 | A42000 | Change order | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-24 | A41999 | Change order | $0 | CVN 73 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-19 | A41997 | Supplemental agreement (work within scope) | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-19 | A41996 | Supplemental agreement (work within scope) | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-19 | A41995 | Supplemental agreement (work within scope) | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-19 | A41993 | Supplemental agreement (work within scope) | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-18 | A41994 | Change order | $0 | CVN 73 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-17 | A41992 | Change order | $0 | CVN 73 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-17 | A41991 | Change order | $0 | CVN 73 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-14 | A41990 | Change order | $0 | CVN 73 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-13 | A00092 | Administrative change | $0 | FY16 REFUEL AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-06 | A41989 | Change order | $0 | CVN 73 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-05 | A41988 | Change order | $0 | CVN 73 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-05 | A41987 | Change order | $0 | CVN 73 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-04 | A41986 | Change order | $0 | CVN 73 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| 2022-10-04 | A41985 | Change order | $0 | CVN 73 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-23). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗