Bath Iron Works Corporation received this contract from Sup of Shipbuilding Conv and Repair, Department of the Navy: $419.55M obligated so far for combat ships and landing vessels. It runs to 2027-07-31, or to 2029-07-31 if every option is exercised.
Key facts · data as of Oct 21, 2026
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 21, 2026.
Cite this page: SpendQuery, Award N0002424C4212, data as of Oct 21, 2026, https://spendquery.com/award?id=CONT_AWD_N0002424C4212_9700_-NONE-_-NONE-
Bath Iron Works Corporation: all federal awards · Department of Defense: spending · Sup of Shipbuilding Conv and Repair: what it buys · The follow-on: recompete brief
CEILING HOLDER
Up for re-bid: ends 2027-07-31. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
227 actions since 2024-06-14 (the newest 200 shown). Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-22 | A00212 | Change order | $1.11M | SHIP ALTERATION WORK |
| 2026-07-21 | A00211 | Funding only | $2.85M | SHIP ALTERATION WORK |
| 2026-07-16 | P00015 | Administrative change | $0 | SHIP ALTERATION WORK |
| 2026-07-16 | A00210 | Change order | $2.67M | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-07-15 | A00209 | Funding only | $1.66M | SHIP ALTERATION WORK |
| 2026-07-13 | P00014 | Administrative change | $0 | SHIP ALTERATION WORK |
| 2026-07-09 | A00208 | Change order | $543.6K | SHIP ALTERATION WORK - PROVISIONED ITEMS ORDER |
| 2026-07-08 | A00207 | Funding only | -$167.9K | SHIP ALTERATION WORK |
| 2026-07-01 | A00206 | Change order | $486.8K | SHIP ALTERATION WORK - LONG LEAD TIME MATERIAL |
| 2026-06-26 | A00204 | Supplemental agreement (work within scope) | $108.0K | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-06-23 | A00203 | Funding only | $2.01M | SHIP ALTERATION WORK |
| 2026-06-18 | A00202 | Supplemental agreement (work within scope) | $1.18M | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-06-16 | A00201 | Funding only | $4.88M | SHIP ALTERATION WORK-SEVERABLE |
| 2026-06-11 | A00200 | Supplemental agreement (work within scope) | $786.3K | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-06-10 | A00199 | Funding only | $4.44M | SHIP ALTERATION WORK |
| 2026-06-09 | A00198 | Funding only | $574.1K | SHIP ALTERATION WORK |
| 2026-06-05 | P00013 | Administrative change | $0 | SHIP ALTERATION WORK |
| 2026-06-04 | A00197 | Supplemental agreement (work within scope) | $1.07M | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-06-03 | A00196 | Funding only | $3.73M | SHIP ALTERATION WORK |
| 2026-06-01 | A00195 | Funding only | $2.52M | SHIP ALTERATION WORK |
| 2026-05-29 | A00194 | Supplemental agreement (work within scope) | $1.24M | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-05-28 | A00193 | Funding only | $16.69M | SHIP ALTERATION WORK |
| 2026-05-21 | A00192 | Change order | $466.7K | SHIP ALTERATION WORK |
| 2026-05-19 | A00191 | Funding only | $4.19M | SHIP ALTERATION WORK |
| 2026-05-14 | A00190 | Supplemental agreement (work within scope) | $505.3K | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-05-13 | A00189 | Funding only | $2.6K | SHIP ALTERATION WORK |
| 2026-05-12 | A00188 | Funding only | $1.83M | SHIP ALTERATION WORK |
| 2026-05-07 | A00187 | Supplemental agreement (work within scope) | $342.1K | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-05-05 | A00186 | Funding only | -$325.9K | SHIP ALTERATION WORK - SEVERABLE |
| 2026-04-30 | A00185 | Supplemental agreement (work within scope) | $598.9K | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-04-27 | A00184 | Funding only | $239.8K | SHIP ALTERATION WORK - SEVERABLE |
| 2026-04-23 | A00183 | Supplemental agreement (work within scope) | $392.3K | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-04-23 | A00182 | Option exercised | $10.19M | SHIP ALTERATION WORK - SEVERABLE |
| 2026-04-22 | A00181 | Funding only | $107.0K | SHIP ALTERATION WORK - SEVERABLE |
| 2026-04-16 | A00180 | Supplemental agreement (work within scope) | $3.08M | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-04-14 | A00179 | Funding only | $3.33M | SHIP ALTERATION WORK-SEVERABLE |
| 2026-04-10 | A00178 | Supplemental agreement (work within scope) | $1.98M | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-04-07 | A00177 | Funding only | $246.0K | SHIP ALTERATION WORK |
| 2026-04-02 | A00176 | Supplemental agreement (work within scope) | $199.9K | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-03-31 | A00175 | Funding only | -$367.8K | SHIP ALTERATION WORK-SEVERABLE |
| 2026-03-26 | A00174 | Supplemental agreement (work within scope) | $138.8K | (PIO) PROVISIONED ITEM ORDERS |
| 2026-03-24 | A00173 | Funding only | -$214.0K | SHIP ALTERATION WORK |
| 2026-03-20 | A00172 | Supplemental agreement (work within scope) | $2.04M | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-03-17 | A00171 | Funding only | $1.86M | SHIP ALTERATION WORK-SEVERABLE |
| 2026-03-12 | A00170 | Supplemental agreement (work within scope) | $912.6K | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-03-10 | A00169 | Funding only | $2.06M | SHIP ALTERATION WORK |
| 2026-03-05 | A00168 | Supplemental agreement (work within scope) | $242.4K | PROVISIONED ITEM ORDERS (PIO) |
| 2026-03-02 | A00167 | Funding only | $841.7K | SHIP ALTERATION WORK-SEVERABLE |
| 2026-02-27 | A00166 | Change order | $511.0K | SHIP ALTERATION WORK |
| 2026-02-25 | A00165 | Funding only | $629.7K | SHIP ALTERATION WORK |
| 2026-02-19 | A00164 | Supplemental agreement (work within scope) | $123.9K | PROVISIONED ITEM ORDERS |
| 2026-02-18 | A00163 | Funding only | $1.12M | SHIP ALTERATION WORK - FUNDING ONLY ACTION |
| 2026-02-13 | A00162 | Supplemental agreement (work within scope) | $100.0K | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-02-11 | A00161 | Funding only | $2.65M | SHIP ALTERATION WORK - FUNDING ACTION. |
| 2026-02-11 | A00160 | Funding only | -$3.50M | SHIP ALTERATION WORK - FUNDING ACTION |
| 2026-02-05 | A00159 | Supplemental agreement (work within scope) | $1.51M | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-02-04 | A00158 | Funding only | $699.6K | SHIP ALTERATION WORK |
| 2026-01-29 | A00157 | Supplemental agreement (work within scope) | $207.2K | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-01-27 | A00156 | Funding only | $4.71M | SHIP ALTERATION WORK |
| 2026-01-23 | A00155 | Funding only | $256.6K | SHIP ALTERATION WORK |
| 2026-01-23 | A00154 | Supplemental agreement (work within scope) | $3.10M | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-01-21 | A00153 | Funding only | $8.19M | SHIP ALTERATION WORK-SEVERABLE |
| 2026-01-15 | A00152 | Supplemental agreement (work within scope) | $2.20M | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-01-12 | A00151 | Funding only | $1.79M | SHIP ALTERATION WORK |
| 2026-01-09 | A00150 | Supplemental agreement (work within scope) | $4.97M | PROVISIONED ITEMS ORDERS (PIO) |
| 2026-01-07 | A00149 | Funding only | $297.3K | SHIP ALTERATION WORK-SEVERABLE |
| 2025-12-22 | A00148 | Supplemental agreement (work within scope) | $189.0K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-12-17 | P00012 | Administrative change | $0 | SHIP ALTERATION WORK. THE PURPOSE OF THE MOD IS TO REALIGN CEILING/INCENTIVE FROM CLINS 1003, 1006, 1009 AND 1010 TO CLINS 0101, 0106, 0109 AND 0110. |
| 2025-12-16 | A00147 | Funding only | $1.13M | SHIP ALTERATION WORK |
| 2025-12-10 | A00146 | Funding only | $10.07M | SHIP ALTERATION WORK |
| 2025-12-10 | A00145 | Funding only | $976.4K | SHIP ALTERATION WORK - WITHIN SCOPE |
| 2025-12-08 | A00144 | Funding only | $1.72M | SHIP ALTERATION WORK - WITHIN SCOPE. |
| 2025-12-04 | A00143 | Supplemental agreement (work within scope) | $981.6K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-12-01 | A00142 | Funding only | -$231.6K | PROVISIONED ITEM ORDER - CHANGE WORK - IN SCOPE |
| 2025-11-21 | A00141 | Funding only | -$599.1K | SHIP ALTERATION WORK-SEVERABLE |
| 2025-11-20 | A00140 | Supplemental agreement (work within scope) | $2.81M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-11-14 | A00139 | Supplemental agreement (work within scope) | $713.4K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-11-13 | A00138 | Supplemental agreement (work within scope) | $1.98M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-10-31 | A00137 | Funding only | $2.34M | SHIP ALTERATION WORK-SEVERABLE |
| 2025-10-21 | A00136 | Supplemental agreement (work within scope) | $4.92M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-10-10 | P00011 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCLUDE THE 3D CAD MODELING INTO THE SOW AND CDRL A026. |
| 2025-09-29 | A00135 | Funding only | $922.0K | SHIP ALTERATION WORK |
| 2025-09-25 | A00134 | Supplemental agreement (work within scope) | $2.74M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-09-23 | A00133 | Funding only | $2.75M | SHIP ALTERATION WORK |
| 2025-09-18 | A00132 | Supplemental agreement (work within scope) | $2.06M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-09-16 | A00131 | Funding only | $1.41M | SHIP ALTERATION WORK-SEVERABLE |
| 2025-09-11 | A00130 | Supplemental agreement (work within scope) | $581.6K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-09-09 | A00129 | Funding only | $1.66M | SHIP ALTERATION WORK-SEVERABLE |
| 2025-09-04 | A00128 | Supplemental agreement (work within scope) | $608.7K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-09-03 | A00127 | Funding only | -$763.9K | SHIP ALTERATION WORK |
| 2025-09-02 | A00126 | Supplemental agreement (work within scope) | $3.92M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-08-26 | A00125 | Funding only | $2.62M | SHIP ALTERATION WORK |
| 2025-08-21 | A00124 | Supplemental agreement (work within scope) | $1.91M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-08-19 | A00123 | Funding only | -$955.4K | SHIP ALTERATION WORK-SEVERABLE |
| 2025-08-14 | A00122 | Supplemental agreement (work within scope) | $398.5K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-08-12 | A00121 | Funding only | $2.16M | SHIP ALTERATION WORK |
| 2025-08-07 | A00120 | Supplemental agreement (work within scope) | $3.56M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-08-05 | A00119 | Funding only | $3.89M | SHIP ALTERATION WORK |
| 2025-07-31 | A00118 | Supplemental agreement (work within scope) | $2.33M | PIO |
| 2025-07-30 | A00117 | Funding only | $8.76M | SHIP ALTERATION WORK |
| 2025-07-24 | A00116 | Supplemental agreement (work within scope) | $222.5K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-07-23 | A00115 | Funding only | $4.39M | SHIP ALTERATION |
| 2025-07-17 | A00114 | Supplemental agreement (work within scope) | $1.47M | PIO |
| 2025-07-16 | A00113 | Funding only | $3.85M | SHIP ALTERATION WORK-SEVERABLE |
| 2025-07-11 | P00010 | Administrative change | $0 | LANGUAGE FOR POTENTIAL SPECIAL CAPITAL EXPENDITURE (CAPEX) INCENTIVES FOR CONTRACTOR AND SUBCONTRACTOR SHIP REPAIR INVESTMENTS IN FACILITIES AND PROCESS IMPROVEMENT PROJECTS. |
| 2025-07-11 | A00112 | Supplemental agreement (work within scope) | $781.1K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-07-08 | A00111 | Funding only | $935.8K | SHIP ALTERATION WORK |
| 2025-07-07 | A00110 | Funding only | $53.8K | DDG51 CLASS PLANNING YARD - SUPPLIES - AWARD FEE PAYOUT |
| 2025-07-02 | A00109 | Supplemental agreement (work within scope) | $97.7K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-07-01 | A00108 | Funding only | $20.19M | SHIP ALTERATION |
| 2025-06-26 | A00107 | Supplemental agreement (work within scope) | $634.0K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-06-24 | A00106 | Funding only | $9.32M | SHIP ALTERATION WORK-SEVERABLE |
| 2025-06-17 | A00105 | Supplemental agreement (work within scope) | $1.52M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-06-16 | A00104 | Funding only | $2.13M | SHIP ALTERATION WORK-SEVERABLE |
| 2025-06-13 | P00009 | Administrative change | $0 | PIO |
| 2025-06-12 | A00103 | Supplemental agreement (work within scope) | $3.58M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-06-11 | A00102 | Funding only | $541.3K | SHIP ALTERATION WORK |
| 2025-06-11 | A00101 | Funding only | $3.71M | SHIP ALTERATION WORK |
| 2025-06-04 | A00100 | Funding only | $784.8K | SHIP ALTERATION WORK - SERVABLE |
| 2025-06-03 | A00099 | Funding only | $2.71M | SHIP ALTERATION WORK |
| 2025-05-29 | A00098 | Supplemental agreement (work within scope) | $3.73M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-05-23 | A00097 | Funding only | $1.88M | SHIP ALTERATION WORK |
| 2025-05-23 | A00096 | Funding only | $2.00M | SHIP ALTERATION WORK - AWARD FEE EARNED PAYOUT |
| 2025-05-22 | A00095 | Supplemental agreement (work within scope) | $1.19M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-05-20 | A00094 | Option exercised | $374.6K | SHIP ALTERATION WORK - OPTION ONE EXERCISE |
| 2025-05-20 | A00093 | Funding only | $550.8K | SHIP ALTERATION WORK |
| 2025-05-15 | A00092 | Supplemental agreement (work within scope) | $175.7K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-05-08 | A00091 | Supplemental agreement (work within scope) | $571.7K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-05-05 | A00090 | Funding only | -$168.6K | SHIP ALTERATION WORK |
| 2025-05-02 | A00089 | Supplemental agreement (work within scope) | $1.17M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-04-29 | A00088 | Funding only | $2.71M | SHIP ALTERATION WORK-SEVERABLE |
| 2025-04-24 | A00087 | Supplemental agreement (work within scope) | $93.2K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-04-23 | A00086 | Funding only | $4.30M | SHIP ALTERATION WORK |
| 2025-04-17 | A00085 | Supplemental agreement (work within scope) | $415.4K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-04-11 | P00008 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CONDUCT CEILING REALIGNMENT. |
| 2025-04-11 | A00084 | Funding only | -$833.5K | SHIP ALTERATION WORK-SEVERABLE |
| 2025-04-10 | A00083 | Supplemental agreement (work within scope) | $116.8K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-04-08 | A00082 | Funding only | $150.1K | SHIP ALTERATION WORK |
| 2025-04-03 | A00081 | Supplemental agreement (work within scope) | $1.38M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-04-01 | A00080 | Funding only | $1.08M | SHIP ALTERATION WORK |
| 2025-03-25 | A00079 | Funding only | $18.1K | SHIP ALTERATION WORK |
| 2025-03-24 | A00078 | Supplemental agreement (work within scope) | $1.15M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-03-18 | A00077 | Funding only | $994.2K | SHIP ALTERATION WORK |
| 2025-03-14 | A00076 | Supplemental agreement (work within scope) | $394.2K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-03-10 | A00075 | Funding only | $1.62M | SHIP ALTERATION WORK |
| 2025-03-06 | A00074 | Supplemental agreement (work within scope) | $532.8K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-03-05 | A00073 | Funding only | -$1.04M | SHIP ALTERATION WORK-SEVERABLE |
| 2025-02-27 | A00072 | Supplemental agreement (work within scope) | $347.9K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-02-25 | A00071 | Funding only | $68.9K | SHIP ALTERATION WORK |
| 2025-02-20 | A00070 | Supplemental agreement (work within scope) | $327.3K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-02-19 | A00069 | Funding only | $1.56M | SHIP ALTERATION WORK |
| 2025-02-12 | A00068 | Supplemental agreement (work within scope) | $4.08M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-02-11 | A00067 | Funding only | $1.82M | SHIP ALTERATION WORK-SEVERABLE |
| 2025-02-06 | A00066 | Supplemental agreement (work within scope) | $525.1K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-02-04 | A00065 | Funding only | $3.74M | SHIP ALTERATION WORK-SEVERABLE |
| 2025-01-30 | A00064 | Supplemental agreement (work within scope) | $667.9K | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-01-28 | A00063 | Funding only | $1.90M | SHIP ALTERATION WORK - SEVERABLE |
| 2025-01-23 | A00062 | Supplemental agreement (work within scope) | $2.87M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-01-22 | A00061 | Funding only | $7.56M | SHIP ALTERATION WORK - SEVERABLE |
| 2025-01-16 | A00060 | Supplemental agreement (work within scope) | $2.71M | PROVISIONED ITEMS ORDERS (PIO) |
| 2025-01-14 | A00059 | Funding only | $598.5K | SHIP ALTERATION WORK |
| 2025-01-13 | P00007 | Administrative change | $0 | CEILINGS REALIGNMENT FROM CLIN 0409 AND CLIN 0410 TO CLIN 1006 IN SUPPORT OF SPECIAL TASKING UPDATING THE DD254. |
| 2025-01-08 | A00058 | Funding only | $248.0K | SHIP ALTERATION WORK - SEVERABLE |
| 2025-01-08 | A00057 | Supplemental agreement (work within scope) | $17.0K | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-12-23 | A00056 | Funding only | $374.1K | SHIP ALTERATION WORK-SEVERABLE |
| 2024-12-20 | A00055 | Supplemental agreement (work within scope) | $3.73M | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-12-18 | A00054 | Funding only | $231.8K | SHIP ALTERATION WORK-SEVERABLE |
| 2024-12-13 | A00053 | Administrative change | $0 | SHIP ALTERATION WORK - SEVERABLE |
| 2024-12-12 | A00052 | Supplemental agreement (work within scope) | $424.0K | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-12-09 | A00051 | Funding only | $1.14M | SHIP ALTERATION WORK-SEVERABLE |
| 2024-12-05 | A00050 | Supplemental agreement (work within scope) | $248.9K | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-11-27 | A00049 | Supplemental agreement (work within scope) | $370.1K | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-11-26 | A00048 | Funding only | $407.9K | SHIP ALTERATION WORK |
| 2024-11-21 | A00047 | Supplemental agreement (work within scope) | $95.6K | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-11-20 | A00046 | Funding only | $2.41M | SHIP ALTERATION WORK-SEVERABLE |
| 2024-11-14 | A00045 | Supplemental agreement (work within scope) | $1.83M | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-11-13 | P00006 | Administrative change | $0 | CEILING REALIGNMENT FROM CLIN 1017 TO CLIN 1007. |
| 2024-11-13 | A00044 | Funding only | $720.5K | SHIP ALTERATION WORK-SEVERABLE |
| 2024-11-07 | A00043 | Supplemental agreement (work within scope) | $4.94M | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-11-05 | A00042 | Funding only | $3.95M | SHIP ALTERATION WORK |
| 2024-10-31 | A00041 | Supplemental agreement (work within scope) | $90.9K | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-10-29 | A00040 | Funding only | $4.34M | SHIP ALTERATION WORK-SEVERABLE |
| 2024-10-24 | A00039 | Supplemental agreement (work within scope) | $630.5K | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-10-23 | A00038 | Funding only | $9.76M | SHIP ALTERATION WORK - SEVERABLE |
| 2024-10-18 | A00037 | Supplemental agreement (work within scope) | $1.29M | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-10-17 | A00036 | Funding only | $1.90M | SHIP ALTERATION WORK - SEVERABLE |
| 2024-10-10 | A00035 | Supplemental agreement (work within scope) | $11.5K | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-10-08 | A00034 | Funding only | $416.1K | SHIP ALTERATION WORK - SEVERABLE |
| 2024-10-03 | A00033 | Supplemental agreement (work within scope) | $212.8K | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-09-25 | A00032 | Supplemental agreement (work within scope) | $3.82M | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-09-23 | A00031 | Funding only | $245.3K | SHIP ALTERATION WORK - SEVERABLE |
| 2024-09-20 | A00030 | Supplemental agreement (work within scope) | $5.46M | SHIP ALTERATION WORK |
| 2024-09-18 | A00029 | Funding only | $4.53M | SHIP ALTERATION WORK - SEVERABLE |
| 2024-09-13 | A00028 | Funding only | $4.12M | SHIP ALTERATION WORK - SEVERABLE |
| 2024-09-12 | A00027 | Supplemental agreement (work within scope) | $272.5K | PIO |
| 2024-09-10 | A00026 | Funding only | $333.7K | SHIP ALTERATION WORK-SEVERABLE |
| 2024-09-06 | A00025 | Funding only | $3.44M | SHIP ALTERATION WORK - SEVERABLE |
| 2024-09-05 | A00024 | Supplemental agreement (work within scope) | $80.8K | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-08-29 | A00023 | Supplemental agreement (work within scope) | $36.1K | PROVISIONED ITEMS ORDERS (PIO) |
| 2024-08-27 | A00022 | Funding only | $2.42M | SHIP ALTERATION WORK-SEVERABLE |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗