14 subawards totaling $2.24M (81.5% of what was obligated), as Phoenix International Holdings, Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
SUBCONTRACTOR TO DESIGN, TEST, AND PURCHASE TAPERED BORING EQUIPMENT TO MACHINE TAPERED COUPLING BOLT HOLES WITHIN DEFINED CONSTRAINTS.
Every action
5 actions since 2024-04-15. Each is a modification or amendment with the money it added or took back.
Date
Modification
Kind
Amount
What the agency wrote
2025-08-01
P00004
Funding only
$179.5K
CVN 68 CLASS IN-WATER SHAFT REPLACEMENT
2025-06-05
P00003
Additional work (new agreement)
$14.3K
CVN 68 CLASS IN-WATER SHAFT REPLACEMENT
2024-09-16
P00002
Funding only
$176.6K
CVN 68 CLASS IN-WATER SHAFT REPLACEMENT
2024-07-11
P00001
Additional work (new agreement)
$667.6K
CVN 68 CLASS IN-WATER SHAFT REPLACEMENT
2024-04-15
0
$1.71M
CVN 68 CLASS IN-WATER SHAFT REPLACEMENT
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
2024-09-26
Hilman, Inc.
$291.0K
DESIGNED MANUFACTURE HIGH CAPACITY PIPE ROLLERS.
2024-09-26
Hilman, Inc.
$291.0K
DESIGNED MANUFACTURE HIGH CAPACITY PIPE ROLLERS.
2024-11-15
Kidder, Inc.
$278.8K
FOR SUPPORT STRUCTURE AND BEAM FABRICATION
2024-07-11
Colonial Welding, LLC
$168.0K
FABRICATE 2 ALUMINUM HABITAT BOTTOM SECTION IAW INCLUDING PAD-EYE MODIFICATION, ALL HARDWARE AND ALL GASKETS
2024-07-25
Iawelding Inc
$163.2K
INTERMEDIATE STRUS HABITAT ASSEMBLY CVN IWSR - DELIVERY BY OCTOBER 5 2024.
2024-11-15
East Coast Repair & Fabrication, LLC
$128.3K
FOR THE FABRICATION OF THE STERN TUBE ASSEMBLY
2024-09-16
Kidder, Inc.
$127.3K
MANUFACTURE OF COFFERDAM
2024-09-16
Kidder, Inc.
$127.3K
MANUFACTURE OF COFFERDAM
2024-12-04
Motion Industries, Inc.
$103.6K
MACHINE CUSTOM LENGTH/END CONDITION DUFF NORTON 3€Ͽ½ STAINLESS STEEL ACME
SCREWS AND PROVIDE ACCOMPANYING FLANGES
2024-07-15
East Coast Repair & Fabrication, LLC
$99.2K
SUBCONTRACTOR TO PROVIDE STBD OUTBOARD STERN TUBE SKIRT ASSEMBLY AND PORT OUTBOARD STERN TUBE SKIRT ASSEMBLY.
2024-07-29
East Coast Repair & Fabrication, LLC
$82.8K
INTERMEDIATE STRUT HABITAT ASSEMBLY
2025-02-26
Industrial Alloys Inc
$51.4K
THIS SUBCONTRACT SUPPORT FOR SHAFT INTERFACE PADS (PART NUMBER: 8549704-01) TO ONGOING PROJECT MISSION REQUIREMENTS.
2026-04-09
Afp Industries, Inc.
$31.4K
CVN 68 CLASS IN-WATER SHAFT REPLACEMENT - PROCUREMENT-THE REQUIREMENT IS FOR A HYDRAULIC POWER UNIT (HPU) CAPABLE OF OPERATING UP TO TWO SUBSEA CHAIN HOISTS SIMULTANEOUSLY. THE SYSTEM INCLUDES MOTORS, PUMPS, CONTROL…