USS GABRIELLE GIFFORDS (LCS 10) FY25 DSRA
Up for re-bid: ends 2026-12-18. Recompete brief → · USS GABRIELLE GIFFORDS (LCS-10) Port and Starboard Amah repair ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
79 subawards totaling $33.90M (35.4% of what was obligated), as Vigor Marine LLC reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Life Cycle Engineering Inc | $4.99M | 1 | SC | 2025-07-15 | 2025-07-15 |
| Delphinus Engineering, Inc. | $4.32M | 6 | PA | 2025-06-16 | 2025-12-09 |
| Rolls-Royce Holdings PLC | $2.40M | 3 | MI | 2025-05-06 | 2025-10-13 |
| Austal Limited | $2.31M | 2 | AL | 2025-05-05 | 2026-01-24 |
| Washington Marine Cleaning LLC | $2.17M | 5 | WA | 2025-05-28 | 2025-10-08 |
| Defense Maritime Solutions, Inc. | $2.12M | 2 | VA | 2025-05-06 | 2025-06-10 |
| Cascade Power Inc | $1.89M | 1 | WA | 2025-06-12 | 2025-06-12 |
| Performance Contracting Inc | $1.55M | 2 | KS | 2025-05-09 | 2025-08-05 |
| South Bay Sand Blasting and Tank Cleaning, Inc. | $1.43M | 2 | CA | 2025-06-04 | 2026-01-09 |
| Pacific River Patrol | $1.32M | 1 | WA | 2025-06-19 | 2025-06-19 |
| Lake Shore Systems, Inc. | $1.17M | 3 |
33 actions since 2024-12-20. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-17 | A00033 | Change order | $5.83M | C440B, MODIFICATION TO UNILATERALLY SETTLE GROWTH AND DE-SCOPE RCCS IN SUPPORT OF THE USS GABRIELLE GIFFORDS (LCS-10) FY25 |
| 2026-07-15 | A00032 | Supplemental agreement (work within scope) | $94.2K | C440A- MODIFICATION TO INCORPORATE GROWTH AND DESCOPE RCCS 178G, 200G, 274G, 337G, AND 343G. |
| 2026-07-07 | A00031 | Supplemental agreement (work within scope) | $278.9K | CODE 440B USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N00024-25-C-4409 TO INCORPORATE GROWTH WORK CHANGES. |
| 2026-06-12 | A00029 | Administrative change | $0 | C440- MODIFICATION TO ACCOMPLISH ADMINISTRATIVE CHANGE TO CORRECT CLIN 0075/AP LINE OF ACCOUNTING |
| 2026-06-05 | A00028 | Supplemental agreement (work within scope) | $701.3K | TYCOM (1B4B) |
| 2026-05-19 | A00027 | Supplemental agreement (work within scope) | $413.4K | C440B - USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA |
| 2026-04-14 | A00026 | Supplemental agreement (work within scope) | $81.6K | CODE 440B USS GABRIELLE GIFFORDS FY25 DSRA INCORPORATE GROWTH WORK RCC'S 233G/257NG/273G |
| 2026-04-06 | A00025 | Supplemental agreement (work within scope) | $999.1K | CODE 440B USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N00024-25-C-4409 TO INCORPORATE GROWTH WORK OF RCCS 193G/198NG/207G R1/214G R1/217G/237G/258G/271G. TO INCORPORATE ACCELERATION COSTS FOR W.I 565-11-001. |
| 2026-03-26 | A00024 | Administrative change | $0 | SWRMC C440B - FUNDING RE-ALIGNMENT |
| 2026-03-16 | A00023 | Supplemental agreement (work within scope) | $1.64M |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
| MI |
| 2025-05-07 |
| 2025-10-23 |
| Macdonald-Miller Facility Solutions LLC | $872.3K | 4 | WA | 2025-06-13 | 2025-09-18 |
| Heimdall Fire and Safety, LLC | $846.7K | 2 | WA | 2025-05-29 | 2025-07-28 |
| Mantech International Corporation | $822.8K | 3 | AL | 2025-06-24 | 2026-01-31 |
| Pacific Mobile Structures, Inc. | $813.3K | 3 | WA | 2025-06-25 | 2025-11-21 |
| Pacific Power Group, LLC | $578.3K | 1 | WA | 2025-07-29 | 2025-07-29 |
| Omega Morgan Inc | $481.9K | 1 | OR | 2025-07-11 | 2025-07-11 |
| Coastal Veterans Repair Group LLC | $456.0K | 1 | NC | 2025-06-11 | 2025-06-11 |
| N C Power Systems Co. | $391.5K | 1 | WA | 2025-09-29 | 2025-09-29 |
| Curtiss-Wright Electro-Mechanical Corporation | $307.7K | 1 | CA | 2025-05-06 | 2025-05-06 |
| Saab Defense and Security USA LLC | $240.5K | 2 | NY | 2025-05-29 | 2025-11-06 |
| Global Diving & Salvage, Inc. | $197.0K | 2 | WA | 2025-06-23 | 2025-08-05 |
| American Vulkan Corporation | $184.7K | 1 | FL | 2025-05-07 | 2025-05-07 |
| United Rentals (North America), Inc. | $172.4K | 2 | CT | 2025-06-23 | 2025-09-05 |
| General Dynamics Corporation | $152.6K | 1 | VA | 2025-07-03 | 2025-07-03 |
The 25 largest of 49; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2025-07-15 | Life Cycle Engineering Inc | $4.99M | "PMAV PERIOD 25P6 PROVIDED QUOTED PMAV SERVICES FOR 25P6, INCLUDING LABOR, MATERIAL, SUBCONTRACT, AND TRAVEL COSTS" |
| 2025-06-16 | Delphinus Engineering, Inc. | $2.37M | "110-10-001 UNDERWATER HULL; INSPECT AND REPAIR PARAGRAPHS: 3.6 -3.6.5.3" |
| 2025-05-05 | Austal USA, LLC | $2.28M | "561-11-001 RIDE CONTROL INTERCEPTOR; REPAIR PARAGRAPHS 3.1 - 3.4.1" |
| 2025-05-06 | Rolls-Royce Solutions America Inc | $2.09M | "237-11-001 HYDRAULIC PRIME MOVER (HPM) DIESEL ENGINE FLEXIBLE HOSE REPLACEMENT; ACCOMPLISH PARAGRAPHS: 3.1, 3.3, 3.3.1, 3.5, 3.6" |
| 2025-06-12 | Cascade Power Inc | $1.89M | "321-90-001 SHIPALT LCS2-90333K, STK SPS-77 MOD B+ TRANSIENT VOLTAGE SUPPRESSOR SYSTEM (TVSS); ACCOMPLISH PARAGRAPH 3.1" |
| 2025-05-09 | Performance Contracting Inc | $1.50M | "110-10-001 UNDERWATER HULL; INSPECT AND REPAIR PARAGRAPHS: 3.10-3.10.1" |
| 2025-05-28 | Washington Marine Cleaning LLC | $1.41M | "123-10-001 TANK AND VOID CLEANING AND PUMPING; ACCOMPLISH PARAGRAPHS: 3.1-3.4.1.2" |
| 2025-06-04 | South Bay Sand Blasting and Tank Cleaning, Inc. | $1.36M | "634-11-001 NON-SKID REPLACEMENT; ACCOMPLISH PARAGRAPHS 3.1 - 3.2" |
| 2025-06-19 | Pacific River, LLC | $1.32M | PROVIDE ARMED AND UNARMED SECURITY OFFICERS FOR LCS10 |
| 2025-06-24 | Delphinus Engineering, Inc. | $1.26M | "123-90-001 SHIPALT LCS2-95022K, FUEL OIL TANK; ACCOMPLISH (OPTION ITEM) PARAGRAPHS: 3.1 - 3.5" |
| 2025-05-06 | Defense Maritime Solutions, Inc. | $1.24M | "243-10-001 WATER JET SHAFT SEAL ASSEMBLY; OVERHAUL PARAGRAPH 3.1" |
| 2025-06-10 | Defense Maritime Solutions, Inc. | $876.2K | "243-10-001 WATER JET SHAFT SEAL ASSEMBLY; OVERHAUL PARAGRAPH 3.1" |
| 2025-05-29 | Heimdall Fire and Safety, LLC | $722.4K | "863-51-001 TEMPORARY AUTOMATIC FIRE DETECTION SYSTEM; INSTALL 20% DOWN PAYMENT PROVIDE TEMPORARY AUTOMATIC FIRE DETECTION SYSTEM PER HEIMDALL PROPOSAL DATED 6/20/2024" |
| 2025-05-07 | Lake Shore Systems, Inc. | $639.8K | "573-11-001 LIFT PLATFORM SYSTEM OPERABILITY TEST (SOT) LEVEL III; ACCOMPLISH PARAGRAPH 3.1 PLATFORM LIFT SOT III TEST" |
| 2025-07-29 | Pacific Power Group, LLC | $578.3K | "WORK ITEM: 311-22-008 NUMBER ONE SHIP SERVICE DIESEL GENERATOR (SSDG); CLASS B OVERHAUL (REF RCC 0001N) RCC 1N OVERHAUL 8V396 LCS GENERATOR AS DETAILED IN PACIFIC POWER GROUP ESTIMATE GW 45799" |
| 2025-07-11 | Morgan Industrial Inc | $481.9K | "311-22-008 RIGGING SUPPORT FOR THE REMOVAL OF A DIESEL GENERATOR AS DETAILED IN OMEGA MORGAN QUOTE 6063-25 VERSION 2 NUMBER ONE SHIP SERVICE DIESEL GENERATOR (SSDG); CLASS B OVERHAUL (REF RCC 0001N)" |
| 2025-06-24 | Imia, LLC | $464.3K | "110-11-001 ENGINE ROOM NUMBER ONE STRUCTURAL WELD, FRAME 57; REPAIR PARAGRAPHS: 3.1-3.2.2" |
| 2025-06-11 | Coastal Veterans Repair Group LLC | $456.0K | "428-90-002 SHIPALT LCS2-90271K, NAVIGATION CRITICAL DISTRIBUTION SYSTEM (NCDS) HARDWARE INSTALLATION; ACOMPLISH (OPTION ITEM) PARAGRAPHS: 2.1 AND 2.10 THRU 2.17 IN ACCORDANCE WITH PARA(S) 3.1, 3.6 (FOR CABLE… |
| 2025-06-13 | Macdonald-Miller Facility Solutions LLC | $447.4K | "514-21-001 AIR CONDITIONING (A/C) PLANT NUMBER ONE CONDENSER; MECHANICALLY CLEAN PARAGRAPHS: 3.1-3.2, 3.22-3.3, 3.4-3.5.3.1, 3.5.4, 3.5.5-3.5.6.1, 3.6" |
| 2025-10-10 | Pacific Mobile Structures, Inc. | $426.8K | "RENTAL ITEMS - 2EA 12X56 OFFICE W/ CHAIRS, LOCKERS, BUNKS, PILLOWS BLANKETS, OUTSIDE LOCKERS. 1EA 12X56 OFFICE (FOR MESS) WITH 35EA FLDING CHAIRS AND 6EA TABLES, 1EA 14X60 RESTROOM/SHOWER FACILITY WITH SECURITY KIT,… |
| 2025-10-08 | Washington Marine Cleaning LLC | $422.2K | "123-10-001 TANK AND VOID CLEANING AND PUMPING; ACCOMPLISH PARAGRAPHS: 3.1-3.4.1.2" |
| 2025-09-29 | N C Power Systems Co. | $391.5K | RENTAL 992-11-017- 1EA CATERPILLAR XQ1500, 1500KW (1875 KVA), 3000A MBT, 3000G AUX TANK W/25’ LINES W/ (2) BERMS, 2000’ OF 4/0 CABLE. |
| 2025-07-16 | Lake Shore Systems, Inc. | $382.0K | "573-11-001 LIFT PLATFORM SYSTEM OPERABILITY TEST (SOT) LEVEL III; ACCOMPLISH PARAGRAPH 3.1 PLATFORM LIFT SOT III TEST" |
| 2025-05-06 | Curtiss-Wright Electro-Mechanical Corporation | $307.7K | "551-52-001 MEDIUM PRESSURE AIR COMPRESSOR (MPAC) AND MOTOR REPAIR; ACCOMPLISH PARAGRAPHS 3.1, 3.2 -3.6, 3.8 - 3.8.1" |
| 2025-06-19 | Macdonald-Miller Facility Solutions LLC | $278.0K | "512-11-002 VENTILATION DUCTING AND DAMPER; INSPECT AND REPLACE PARAGRAPHS: 3.1 - 3.5" |
| CODE 440B USS GABRIELLE GIFFORDS LCS-10 FY25 DSRA N0002425C4409 TO INCORPORATE GROWTH WORK OF RCCS |
| 2026-03-11 | A00022 | Supplemental agreement (work within scope) | $9.64M | C440B_MODIFICATION TO INCORPORATE ADDITIONAL WORK |
| 2026-03-09 | A00021 | Change order | $1.14M | CODE 440B USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N0002425C4409 TO INCORPORATE GROWTH WORK OF RCCS 181G 219G CFR 0144 |
| 2026-02-20 | A00020 | Supplemental agreement (work within scope) | $159.7K | C440B_MODFICATION TO INCORPORATE ADDITIONAL WORK. |
| 2026-01-28 | A00019 | Supplemental agreement (work within scope) | $1.30M | C440B_MODIFICATION TO INCORPORATE GROWTH WORK AND ADMINISTRATIVE CHANGES. |
| 2026-01-09 | A00018 | Supplemental agreement (work within scope) | -$899.5K | CODE 440B TOSETTLE DESCOPE CHANGES USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N00024-25-C-4409 |
| 2025-12-04 | A00017 | Supplemental agreement (work within scope) | $51.8K | CODE 440B USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N00024-25-C-4409 TO INCORPORATE GROWTH AND DESCOPE WORK |
| 2025-11-06 | A00016 | Supplemental agreement (work within scope) | -$135.9K | CODE 440B USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N00024-25-C-4409 TO INCORPORATE DESCOPE WORK |
| 2025-10-23 | A00015 | Supplemental agreement (work within scope) | -$66.1K | CODE 440B USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N00024-25-C-4409 TO INCORPORATE DESCOPE WORK |
| 2025-10-20 | A00014 | Supplemental agreement (work within scope) | $1.80M | CODE 440B USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N00024-25-C-4409 TO INCORPORATE AVAILABILITY DATE SHIFT AND FUND PREVIOUS MILESTONE CHANGES |
| 2025-10-03 | A00013 | Additional work (new agreement) | $4.68M | CODE 440B USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N00024-25-C-4409 TO FULLY FUND NEW WORK |
| 2025-10-01 | A00012 | Supplemental agreement (work within scope) | -$633.3K | SWRMC 440B: USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N00024-25-C-4409 TO DESCOPE WORK AND ADMIN CHANGE |
| 2025-09-26 | A00011 | Supplemental agreement (work within scope) | $146.0K | SWRMC C440B: USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N00024-25-C-4409 TO FULLY FUND GROWTH WORK |
| 2025-09-03 | A00010 | Supplemental agreement (work within scope) | $46.8K | CODE 440B TO INCORPORATE GROWTH WORK |
| 2025-07-28 | A00009 | Supplemental agreement (work within scope) | $0 | C440B - TO CORRECT THE WIDE AREA WORK FLOW INFORMATION IN SUPPORT OF USS GABRIELLE GIFFORDS |
| 2025-07-22 | A00008 | Option exercised | $3.98M | CODE 440B EXERCISE OPTIONS |
| 2025-07-17 | A00007 | Supplemental agreement (work within scope) | $135.8K | C440B - TO INCORPORATE MILESTONE CHANGES AND GROWTH WORK IN SUPPORT OF THE USS GABRIELLE GIFFORDS |
| 2025-07-14 | A00006 | Supplemental agreement (work within scope) | $1.86M | C440B - TO AWARD THE SUPPLEMENTAL PACKAGE IN SUPPORT OF THE USS GABRIELLE GIFFORDS |
| 2025-07-02 | A00005 | Option exercised | $6.12M | CODE 440B EXERCISE OPTIONS |
| 2025-06-27 | A00004 | Option exercised | $368.6K | CODE 440B EXERCISE OPTIONS |
| 2025-06-24 | A00003 | Supplemental agreement (work within scope) | $254.6K | USS GABRIELLE GIFFORDS, N00024-25-C-4409, C440B TO FUND PREVIOUS MILESTONE CHANGES |
| 2025-04-28 | A00002 | Supplemental agreement (work within scope) | $0 | USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N00024-25-C-4409 TO INCORPORATE AVAILABILITY DATE SHIFT |
| 2025-04-04 | A00001 | Supplemental agreement (work within scope) | $0 | C440B - INCORPORATE CLASS DEVIATIONS AND MODIFY POINT OF CONTACTS UNDER CLAUSE G-242-H001 |
| 2024-12-20 | 0 | $55.88M | USS GABRIELLE GIFFORDS (LCS 10) FY25 DSRA |