80 subawards totaling $2.17M (1.6% of what was obligated), as Northrop Grumman Systems Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Chemical Strategies Inc | $1.16M | 8 | AZ | 2025-07-22 | 2025-07-22 |
| Maritime Applied Physics Corporation | $1.05M | 4 | MD | 2024-01-23 | 2025-02-10 |
| Cepeda Associates, Inc. | $779.0K | 1 | KY | 2024-11-27 | 2024-11-27 |
| Landstar System, Inc. | $185.6K | 10 | FL | 2024-08-21 | 2025-07-28 |
| Elantas North America, LLC | $166.5K | 2 | NY | 2025-01-28 | 2025-03-12 |
| Goodwin Steel Castings Limited | $112.4K | 1 | 2023-01-24 | 2023-01-24 | |
| Temasek Holdings (Private) Limited | $95.2K | 2 | MD | 2026-01-27 | 2026-06-12 |
| Graco Supply Company | $23.5K | 2 | TX | 2025-08-21 | 2025-08-21 |
| Transdigm Group Incorporated | $0 | 2 | CT | 2026-02-02 | 2026-02-02 |
| Insight Enterprises Inc | -$3.5K | 1 | AZ | 2023-11-07 | 2023-11-07 |
| Afg Acquisition Group L.L.C. | -$6.3K | 1 | OK | 2025-10-16 | 2025-10-16 |
| Pip Manufacturing, Inc. | -$186.8K | 16 | IL | 2025-07-17 | 2025-07-17 |
| Ametek Inc | -$514.1K | 2 | MA | 2025-08-13 | 2025-08-13 |
| Esco Technologies Inc. | -$688.7K | 28 | CA | 2025-09-04 | 2025-09-09 |
| Date | To | Amount | For |
|---|---|---|---|
| 2024-11-27 | Cepeda Associates, Inc. | $779.0K | OTHER GUIDED MISSILE AND SPACE VEHICLE PARTS AND AUXILIARY EQUIPMENT MANUFACTURING |
| 2025-02-10 | Maritime Applied Physics Corporation | $438.5K | RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY) (SEE FOOTNO |
| 2025-02-10 | Maritime Applied Physics Corporation | $438.5K | RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY) (SEE FOOTNO |
| 2025-07-22 | Chemical Strategies Inc | $144.5K | ALL OTHER MISCELLANEOUS CHEMICAL PRODUCT AND PREPARATION MANUFACTURING |
| 2025-07-22 | Chemical Strategies Inc | $144.5K | ALL OTHER MISCELLANEOUS CHEMICAL PRODUCT AND PREPARATION MANUFACTURING |
| 2025-07-22 | Chemical Strategies Inc | $144.5K | ALL OTHER MISCELLANEOUS CHEMICAL PRODUCT AND PREPARATION MANUFACTURING |
| 2025-07-22 | Chemical Strategies Inc | $144.5K | ALL OTHER MISCELLANEOUS CHEMICAL PRODUCT AND PREPARATION MANUFACTURING |
| 2025-07-22 | Chemical Strategies Inc | $144.5K | ALL OTHER MISCELLANEOUS CHEMICAL PRODUCT AND PREPARATION MANUFACTURING |
| 2025-07-22 | Chemical Strategies Inc | $144.5K | ALL OTHER MISCELLANEOUS CHEMICAL PRODUCT AND PREPARATION MANUFACTURING |
| 2025-07-22 | Chemical Strategies Inc | $144.5K | ALL OTHER MISCELLANEOUS CHEMICAL PRODUCT AND PREPARATION MANUFACTURING |
| 2025-07-22 | Chemical Strategies Inc | $144.5K | ALL OTHER MISCELLANEOUS CHEMICAL PRODUCT AND PREPARATION MANUFACTURING |
| 2025-03-12 | Elantas North America, LLC | $126.0K | PLASTICS MATERIAL AND RESIN MANUFACTURING |
| 2024-01-23 | Maritime Applied Physics Corporation | $115.2K | INSTRUMENT MANUFACTURING FOR MEASURING AND TESTING ELECTRICITY AND ELECTRICAL SIGNALS |
| 2023-01-24 | Goodwin Steel Castings Limited | $112.4K | LABORATORY AND SCIEN |
| 2026-01-27 | NTS Technical Systems LLC | $67.6K | OTHER SCIENTIFIC AND TECHNICAL CONSULTING SERVICES |
| 2024-01-23 | Maritime Applied Physics Corporation | $58.7K | INSTRUMENT MANUFACTURING FOR MEASURING AND TESTING ELECTRICITY AND ELECTRICAL SIGNALS |
| 2026-02-02 | Harcosemco LLC | $45.9K | AIRCRAFT ENGINE AND ENGINE PARTS MANUFACTURING |
| 2025-01-28 | Elantas North America, LLC | $40.5K | PLASTICS MATERIAL AND RESIN MANUFACTURING |
| 2024-08-21 | Landstar Inway, Inc. | $32.4K | FACIL MAINT AND MODS |
| 2026-06-12 | NTS Technical Systems LLC | $27.7K | OTHER SCIENTIFIC AND TECHNICAL CONSULTING SERVICES |
| 2025-07-28 | Landstar Inway, Inc. | $18.7K | LABORATORY AND SCIEN |
| 2025-07-28 | Landstar Inway, Inc. | $18.7K | LABORATORY AND SCIEN |
| 2025-07-28 | Landstar Inway, Inc. | $18.7K | LABORATORY AND SCIEN |
| 2025-07-28 | Landstar Inway, Inc. | $18.7K | LABORATORY AND SCIEN |
| 2025-07-28 | Landstar Inway, Inc. | $18.7K | LABORATORY AND SCIEN |
107 actions since 2022-10-06. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-04-10 | P00043 | Funding only | $0 | UMBILICAL HOUSING PRODUCTION |
| 2026-04-10 | P00043 | Funding only | $885.0K | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2026-04-10 | P00043 | Funding only | -$5.8K | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2026-04-10 | P00042 | Funding only | $0 | UMBILICAL HOUSING PRODUCTION |
| 2026-04-10 | P00042 | Funding only | $0 | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2026-04-10 | P00042 | Funding only | $0 | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2026-04-10 | P00042 | Funding only | $347.0K | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2026-04-10 | P00041 | Funding only | $0 | UMBILICAL HOUSING PRODUCTION |
| 2026-04-10 | P00041 | Funding only | $875.3K | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2026-04-10 | P00041 | Funding only | $652.1K | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2026-04-10 | P00041 | Funding only | $0 | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2026-01-16 | P00040 | Funding only | $0 | UMBILICAL HOUSING PRODUCTION |
| 2026-01-16 | P00040 | Funding only | $1.58M | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2026-01-16 | P00040 | Funding only | $0 | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2026-01-16 | P00040 | Funding only | $0 | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2025-11-25 | P00039 | Funding only | $0 | UMBILICAL HOUSING PRODUCTION |
| 2025-11-25 | P00039 | Funding only | $897.7K | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2025-11-25 | P00039 | Funding only | $0 | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2025-11-25 | P00039 | Funding only | $0 | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2025-09-30 | P00038 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2025-09-30 | P00038 | Funding only | $768.1K | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2025-09-30 | P00038 | Administrative change | $0 | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2025-09-30 | P00038 | Funding only | -$750.1K | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2025-08-07 | P00037 | Funding only | $23.23M | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2025-08-07 | P00037 | Funding only | $454.4K | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2025-08-07 | P00037 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2025-08-07 | P00037 | Administrative change | $0 | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2025-06-12 | P00036 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2025-06-12 | P00036 | Funding only | $1.37M | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2025-06-12 | P00036 | Funding only | -$246.7K | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2025-06-12 | P00036 | Funding only | $5.91M | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2025-02-24 | P00035 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2025-02-24 | P00035 | Funding only | $6.25M | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2025-02-24 | P00035 | Funding only | $2.91M | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2025-02-24 | P00035 | Administrative change | $0 | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2024-12-18 | P00034 | Administrative change | $0 | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2024-12-18 | P00034 | Administrative change | $0 | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2024-12-18 | P00034 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2024-12-18 | P00034 | Administrative change | $0 | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2024-10-03 | P00033 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2024-10-03 | P00033 | Funding only | $2.17M | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2024-10-03 | P00033 | Funding only | -$30.1K | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2024-10-03 | P00033 | Funding only | -$4.1K | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2024-08-07 | P00032 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2024-08-07 | P00032 | Administrative change | $0 | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2024-08-07 | P00032 | Funding only | -$899.9K | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2024-08-07 | P00032 | Funding only | $1.54M | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2024-04-19 | P00031 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2024-04-19 | P00031 | Change order | $2.58M | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2024-04-19 | P00031 | Change order | $1.52M | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2024-04-19 | P00031 | Change order | -$860.2K | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2024-03-13 | P00030 | Funding only | $4.44M | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2024-03-13 | P00030 | Funding only | $0 | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2024-03-13 | P00030 | Funding only | $0 | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2024-03-13 | P00030 | Funding only | $49.1K | UMBILICAL HOUSING PRODUCTION |
| 2024-02-09 | P00029 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2024-02-09 | P00029 | Funding only | -$16.21M | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2024-02-09 | P00029 | Funding only | $4.56M | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2024-02-09 | P00029 | Funding only | $13.17M | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2023-12-22 | P00028 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2023-12-22 | P00028 | Administrative change | $0 | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2023-12-22 | P00028 | Administrative change | $0 | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2023-12-22 | P00028 | Administrative change | $0 | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2023-09-28 | P00027 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2023-09-28 | P00027 | Administrative change | $0 | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2023-09-28 | P00027 | Option exercised | $15.03M | U.S. COLUMBIA DETONATOR POWER ASSEMBLY |
| 2023-09-28 | P00027 | Administrative change | $0 | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2023-09-13 | P00026 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2023-09-13 | P00026 | Funding only | $56.8K | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2023-09-13 | P00026 | Funding only | $0 | FY22 U.S. PROGRAM MGMT AND SYSTEMS ENG. |
| 2023-09-13 | P00026 | Funding only | $0 | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2023-07-19 | P00025 | Funding only | $2.10M | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2023-07-19 | P00025 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2023-07-19 | P00025 | Funding only | $2.45M | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2023-07-19 | P00025 | Option exercised | $10.36M | FY22 U.S. PROGRAM MGMT AND SYSTEMS ENG. |
| 2023-05-22 | P00024 | Administrative change | $0 | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2023-05-22 | P00024 | Administrative change | $0 | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2023-05-22 | P00024 | Administrative change | $0 | FY22 U.S. PROGRAM MGMT AND SYSTEMS ENG. |
| 2023-05-22 | P00024 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2023-03-30 | P00023 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2023-03-30 | P00023 | Administrative change | $0 | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2023-03-30 | P00023 | Funding only | $3.38M | FY22 U.S. PROGRAM MGMT AND SYSTEMS ENG. |
| 2023-03-30 | P00023 | Funding only | -$124.5K | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2023-03-10 | P00022 | Option exercised | $2.57M | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2023-03-10 | P00022 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2023-03-10 | P00022 | Administrative change | $0 | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2023-03-10 | P00022 | Funding only | $0 | FY22 U.S. PROGRAM MGMT AND SYSTEMS ENG. |
| 2023-02-16 | P00021 | Option exercised | $329.8K | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2023-02-16 | P00021 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2023-02-16 | P00021 | Administrative change | $0 | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2023-02-16 | P00021 | Option exercised | $2.33M | FY22 U.S. PROGRAM MGMT AND SYSTEMS ENG. |
| 2023-01-12 | P00020 | Funding only | $36.2K | UMBILICAL HOUSING PRODUCTION |
| 2023-01-12 | P00020 | Funding only | $94.0K | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2023-01-12 | P00020 | Option exercised | $729.9K | FY22 U.S. PROGRAM MGMT AND SYSTEMS ENG. |
| 2023-01-12 | P00020 | Option exercised | $192.0K | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2022-11-30 | P00019 | Funding only | $6.92M | UMBILICAL HOUSING PRODUCTION |
| 2022-11-30 | P00019 | Option exercised | $5.76M | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2022-11-30 | P00019 | Funding only | $2.88M | FY22 U.S. PROGRAM MGMT AND SYSTEMS ENG. |
| 2022-11-30 | P00019 | Option exercised | $4.88M | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2022-11-15 | P00018 | Administrative change | $0 | UMBILICAL HOUSING PRODUCTION |
| 2022-11-15 | P00018 | Administrative change | $0 | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2022-11-15 | P00018 | Administrative change | $0 | FY22 U.S. PROGRAM MGMT AND SYSTEMS ENG. |
| 2022-11-15 | P00018 | Administrative change | $0 | UK09 DREADNOUGHT HARDWARE PRODUCTION |
| 2022-10-06 | P00017 | Funding only | $8.30M | US01 COLUMBIA FY20 HARDWARE PRODUCTION |
| 2022-10-06 | P00017 | Funding only | $11.36M | UMBILICAL HOUSING PRODUCTION |
| 2022-10-06 | P00017 | Funding only | $118.8K | FY22 U.S. PROGRAM MGMT AND SYSTEMS ENG. |
| 2022-10-06 | P00017 | Funding only | -$1.55M | UK09 DREADNOUGHT HARDWARE PRODUCTION |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-20). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗