Putting the award page together from the records…
Putting the award page together from the records…
UNIQUE SURFACE SUPPORT EQUIPMENT (UK)
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
37 subawards totaling $7.44M (7.0% of what was obligated), as Lockheed Martin Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Maverick Aerospace LLC | $1.79M | 3 | CA | 2024-07-29 | 2024-08-14 |
| Caes Mission Systems LLC | $1.27M | 1 | PA | 2024-11-13 | 2024-11-13 |
| Franklin'S Industries of San Diego, Inc. | $821.4K | 8 | CA | 2024-08-01 | 2025-01-21 |
| Atlantic Wire and Rigging, Inc. | $680.0K | 2 | FL | 2024-07-23 | 2024-08-14 |
| Oak Ridge Tool - Engineering, Inc. | $644.9K | 4 | TN | 2024-08-06 | 2025-02-11 |
| Purolator Facet, Inc. | $550.9K | 2 | CA | 2024-11-21 | 2025-02-27 |
| Daniel Barath | $265.5K | 3 | CA | 2024-07-09 | 2024-11-04 |
| Johnstown Welding & Fabrication, Inc. | $254.9K | 2 | PA | 2024-07-16 | 2024-09-12 |
| Star Cases LLC | $229.3K | 2 | UT | 2024-09-10 | 2025-01-29 |
| Northrop Grumman Systems Corporation | $228.5K | 1 | UT | 2024-11-18 | 2024-11-18 |
| Incodema3D LLC | $132.1K | 1 | NY | 2025-02-19 | 2025-02-19 |
| Raetech Corp | $120.0K | 1 | MI | 2024-11-18 | 2024-11-18 |
| G P 50 New York, LTD. | $107.3K | 1 | NY | 2024-12-23 | 2024-12-23 |
| Jet Helseth Manufacturing, Inc. | $99.6K | 1 | FL | 2024-11-14 | 2024-11-14 |
| Schmiede Corporation | $75.9K | 1 | TN | 2024-08-05 | 2024-08-05 |
| Esco Technologies Inc. | $51.0K | 1 | CA | 2024-08-20 | 2024-08-20 |
| RMD Engineering LLC | $48.2K | 1 | FL | 2024-09-16 | 2024-09-16 |
| Performance Polymer Technologies, LLC | $38.0K | 1 | CA | 2025-01-28 | 2025-01-28 |
| Franklins Industries of San Diego Inc | $34.8K | 1 | CA | 2025-03-19 | 2025-03-19 |
| Date | To | Amount | For |
|---|---|---|---|
| 2024-08-14 | Maverick Aerospace LLC | $1.30M | MONORAIL EQUIPMENT SECTION PACKAGE INST SUPPORT ASSEMBLY MONORAIL. |
| 2024-11-13 | Caes Mission Systems LLC | $1.27M | ADDRESSABLE REMOTE ENCODER ARE NRE |
| 2024-07-23 | Atlantic Wire and Rigging, Inc. | $588.0K | PAD BODY TM. PAD BODY TM |
| 2024-11-21 | Meggitt North Hollywood Inc | $488.5K | SCD COUPLING HALF FEMALE (COUPLG). SCD COUPLING HALF QUICK DISCONNECT (COUP SCD COUPLING HALF QUICK DISCONNECT (CUPL SOCD COUPLING VALVED QUICK DISCONNECT (D |
| 2024-07-29 | Maverick Aerospace LLC | $395.1K | PROTECTOR MUZZLE HATCH SEAL. |
| 2024-08-14 | Franklin'S Industries of San Diego, Inc. | $369.2K | 105 DEGREES TRAY EQUIPMENT SECTION ACCES 145 DEGREES TRAY EQUIPMENT SECTION ACCES 215 DEGREES TRAY EQUIPMENT SECTION ACCES 255 DEGREES TRAY EQUIPMENT SECTION ACCES 300 DEGREES TRAY EQUIPMENT SECTION ACCES 60 DEGREES… |
| 2024-08-06 | Oak Ridge Tool - Engineering, Inc. | $265.6K | ES PKG INSTALLATION FIXTURE. ES PKG INSTALLATION FIXTURE |
| 2024-11-18 | Northrop Grumman Systems Corporation | $228.5K | SEE LINE ITEM TEXT. |
| 2024-09-12 | JWF Defense Systems, LLC | $220.2K | CONTROL PNEUMATIC ES PKG INSTL |
| 2024-10-08 | Oak Ridge Tool - Engineering, Inc. | $212.9K | FIXT HNDLG L.T. FWD END CAP FIXTURE TEST AIM SHIPPING FIXTURE SLIN SLING-AIM BULKHEAD |
| 2024-09-10 | Star Cases LLC | $189.1K | CASE STORAGE CARRIAGE GUIDANCE INST CASE STORAGE FIXTURE ES PACKAGE INSTALLA CASE STORAGE IMU DOLLY CASE STORAGE IMU HANDLING. CASE STORAGE IMU HANDLING CONTAINER PNEUMATIC CONTROL ASSY. CONTAINER PNEUMATIC CONTROL… |
| 2024-11-04 | Daniel Barath | $185.4K | HOSE ASSY PNEUMATIC CONTROL. HOSE ASSY PNEUMATIC CONTROL HOSE INSTALLATION FIXTURE HOSE INSTALLATION FIXTURE. SSE HOSE ASSEMBLY CARRIAGE/FCEP/EA OPERA |
| 2025-02-19 | Incodema3D LLC | $132.1K | ARM FIXED LHS. ARM FIXED RHS. ARM MOVABLE LHS. ARM MOVABLE RHS. HOUSING. SUPPORT BATTERY FIXED LHS. SUPPORT BATTERY FIXED RHS. SUPPORT BATTERY FIXED RHS SUPPORT BATTERY REMOVABLE LHS. SUPPORT… |
| 2025-02-11 | Oak Ridge Tool - Engineering, Inc. | $125.0K | COVER ASSY AFT |
| 2024-11-18 | Raetech Corp | $120.0K | FILTER INLINE DIFFERENTIAL INPUT LOW FILTER INLINE LOW PASS 100 HZ (XPR) |
| 2024-08-08 | Franklin'S Industries of San Diego, Inc. | $108.7K | DOLLY IMU AND BATTERY |
| 2024-12-23 | G P 50 New York, LTD. | $107.3K | TRANDUCER PRES 250PSI .1% TRANSDUCER PRES +/-20PSID 0-5V |
| 2024-11-14 | Jet Helseth Manufacturing, Inc. | $99.6K | LANYARD ASSEMBLY XPR SP2 |
| 2024-08-13 | Maverick Aerospace LLC | $99.5K | BRIDGE BODY ES |
| 2024-08-14 | Atlantic Wire and Rigging, Inc. | $92.0K | COVER NOZZLE TS |
| 2024-08-27 | Franklin'S Industries of San Diego, Inc. | $85.3K | 20 DEG TRAY ES ACCESS 340 DEG TRAY ES ACCESS |
| 2024-08-05 | Schmiede Corporation | $75.9K | HANDLING RING IMU. |
| 2024-09-03 | Franklin'S Industries of San Diego, Inc. | $72.4K | GUIDE RAIL MOTOR DOME CENTER. GUIDE RAIL MOTOR DOME CENTER GUIDE RAIL MOTOR DOME ENTRANCE. GUIDE RAIL MOTOR DOME ENTRANCE GUIDE RAIL MOTOR DOME INSTALLATION. GUIDE RAIL MOTOR DOME INSTALLATION |
| 2024-08-19 | Franklin'S Industries of San Diego, Inc. | $67.6K | BAIL HANDLING RING |
| 2025-02-27 | Meggitt Safety Systems Inc | $62.4K | CABLE ASSEMBLY TRANSMITTER TO SBFN SEMI |
18 actions since 2024-03-01. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-01-29 | P00007 | Option exercised | $0 | THIS AWARD FOR THE COMMON MISSILE COMPARTMENT SYSTEM IS BEING MODIFIED BY EXERCISING CLIN 0008 OPTION WITH US FUNDING ONLY. |
| 2026-01-29 | P00007 | Option exercised | $7.99M | THIS AWARD FOR THE COMMON MISSILE COMPARTMENT SYSTEM IS BEING MODIFIED BY EXERCISING CLIN 0008 OPTION. |
| 2025-07-15 | P00006 | Funding only | $3.75M | UNIQUE SURFACE SUPPORT EQUIPMENT (UK) |
| 2025-07-15 | P00006 | Funding only | $0 | CMC MISSILE SYSTEM INTEGRATION (US) |
| 2025-06-25 | P00005 | Funding only | $0 | UNIQUE SURFACE SUPPORT EQUIPMENT (UK) |
| 2025-06-25 | P00005 | Funding only | $26.89M | CMC MISSILE SYSTEM INTEGRATION (US) |
| 2025-05-02 | P00004 | Funding only | $1.46M | UNIQUE SURFACE SUPPORT EQUIPMENT (UK) |
| 2025-05-02 | P00004 | Funding only | $1.51M | CMC MISSILE SYSTEM INTEGRATION (US) |
| 2025-03-28 | P00003 | Administrative change | $0 | UNIQUE SURFACE SUPPORT EQUIPMENT (UK) |
| 2025-03-28 | P00003 | Administrative change | $0 | CMC MISSILE SYSTEM INTEGRATION (US) |
| 2024-08-26 | A00002 | Administrative change | $0 | UNIQUE SURFACE SUPPORT EQUIPMENT (UK) |
| 2024-07-16 | A00001 | Administrative change | $0 | UNIQUE SURFACE SUPPORT EQUIPMENT (UK) |
| 2024-04-17 | P00002 | Administrative change | $0 | UNIQUE SURFACE SUPPORT EQUIPMENT (UK) |
| 2024-04-17 | P00002 | Administrative change | $0 | CMC MISSILE SYSTEM INTEGRATION (US) |
| 2024-04-16 | P00001 | Administrative change | $0 | UNIQUE SURFACE SUPPORT EQUIPMENT (UK) |
| 2024-04-16 | P00001 | Administrative change | $0 | CMC MISSILE SYSTEM INTEGRATION (US) |
| 2024-03-01 | 0 | $18.89M | UNIQUE SURFACE SUPPORT EQUIPMENT (UK) | |
| 2024-03-01 | 0 | $46.21M | CMC MISSILE SYSTEM INTEGRATION (US) |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-22). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗