N0042125F0145↗

Bae Systems Technology Solutions & Services Inc. received this contract from Naval Air Warfare Center Air Div, Department of the Navy: $1.42M obligated so far for installation of equipment- ship and marine equipment. It runs to 2027-03-31, or to 2030-03-31 if every option is exercised.

Key facts · data as of Oct 26, 2026

Recipient
Bae Systems Technology Solutions & Services Inc.
Awarding agency
Department of the Navy (Department of Defense)
Contracting office
Naval Air Warfare Center Air Div (N00421)
Obligated to date
$1.42M
Potential value
$5.32M
Ends
2027-03-31

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 26, 2026.

Cite this page: SpendQuery, Award N0042125F0145, data as of Oct 26, 2026, https://spendquery.com/award?id=CONT_AWD_N0042125F0145_9700_N0042125D0002_9700

AWARD TO INCORPORATE TDL 0001 AND 0002 AND IF CLINS 0100 AND 0200

Delivery Order · Department of the Navy · to Bae Systems Technology Solutions & Services Inc. (UEI LX3BSV6NNW58) · data as of 2026-10-26

Obligated to date$1.42M3 actions
Current value$2.34Mwith options exercised
Potential value$5.32Mif every option is used
Period2025-04-01 → 2027-03-31up to 2030-03-31 with options
Passed on$391.1Kto 2 subcontractors

Up for re-bid: ends 2027-03-31. Recompete brief → · NAWCAD WOLF Aegis ↗

What it is

Product or service
Installation of Equipment- Ship and Marine Equipment (PSC N020)
Industry
Engineering Services (NAICS 541330)
Contracting office
Naval Air Warfare Center Air Div (N00421)
Competition
Full and open competition
Pricing
Cost no fee
How it was bought
Single-award IDIQ · under N0042125D0002
Where the work is
Saint Marys, MD · district MD-05

Obligations by fiscal year

FY2025$597.1K
FY2026$820.0K

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

2 subawards totaling $391.1K (27.6% of what was obligated), as Bae Systems Technology Solutions & Services Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.

SubcontractorAmountSubawardsWhereFirstLast
Cornet Technology, Inc.$277.2K1VA2025-05-082025-05-08
A & J Manufacturing Co$113.9K1CA2025-04-232025-04-23
The largest single subawards
DateToAmountFor
2025-05-08Cornet Technology, Inc.$277.2KCCHA41185-3 MTX-MR PC RED KIT,COR-PATCH-1A DPC-24 PACTCH CORD, 24 INCHES LONG,CCHA40170 SB-4124C/WSC PATCH PANEL,NPN SHIPPING
2025-04-23A & J Manufacturing Co$113.9K150-005+J FIXED SHELF KIT 150-044+E BRACKET, MOUNTING (MT-4841) 150-111-3+F STRIP JOINING, M/D RACK 150-146+D ANGLE, MOUNTING, FIXED 150-255+C SUPPORT BAR, CABLE 150-274+R POWER PANEL, 8 POSITION 150-348-2+A…

Every action

3 actions since 2025-03-11. Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2026-04-15P00002Funding only$122.0KINCORPORATE TDL 1001 AND IF CLINS 1100 AND 1200
2026-03-26P00001Option exercised$698.0KEX OPT CLINS 1100, 1200, 1998 AND 1999. INCORPORATE TDLS 1002, 1003 AND 1004 AND IF 1100 AND 1200
2025-03-110$597.1KAWARD TO INCORPORATE TDL 0001 AND 0002 AND IF CLINS 0100 AND 0200

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-26). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗