WSM Pacific Siop, a Joint Venture received this contract from Navfacsyscom Northwest, Department of the Navy: $205.69M obligated so far for architect and engineering- general: landscaping, interior layout, and designing. It runs to 2028-06-06.
Key facts · data as of Oct 23, 2026
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 23, 2026.
Cite this page: SpendQuery, Award N4425522F4035, data as of Oct 23, 2026, https://spendquery.com/award?id=CONT_AWD_N4425522F4035_9700_N6274221D0001_9700
WSM Pacific Siop, a Joint Venture: all federal awards · Department of Defense: spending · Navfacsyscom Northwest: what it buys · The follow-on: recompete brief
P454 MULTI-MISSION DRYDOCK - INITIAL STUDIES
Up for re-bid: ends 2028-06-06. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
90 subawards totaling $144.74M (70.4% of what was obligated), as WSM Pacific Siop, a Joint Venture reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| WSP USA Solutions Inc | $34.07M | 3 | DC | 2023-03-20 | 2024-01-27 |
| Mustang Acquisition Holdings Inc. | $27.92M | 2 | HI | 2023-03-24 | 2023-04-20 |
| Moffatt & Nichol | $19.50M | 5 | CA, HI | 2023-03-20 | 2024-05-14 |
| Stantec Consulting Services Inc. | $10.36M | 3 | HI | 2023-11-09 | 2024-05-16 |
| Haley & Aldrich, Inc | $9.89M | 4 | MA | 2023-04-20 | 2024-02-07 |
| Vet Industrial Inc | $6.39M | 2 | WA | 2023-04-19 | 2024-01-08 |
| P2S LP | $5.83M | 3 | CA | 2023-03-23 | 2024-01-03 |
| Wood Harbinger Inc | $5.34M | 4 | WA | 2023-03-21 | 2024-01-12 |
| Burns & Mcdonnell Engineering Company, Inc. | $4.62M | 2 | MO | 2024-01-16 | 2024-01-16 |
| Earth Mechanics, Inc. | $2.44M | 2 | CA | 2023-03-22 | 2023-12-13 |
| Burns & Mcdonnell, Inc. | $1.89M | 2 | MO | 2022-11-28 | 2023-04-07 |
| Holt Services Inc | $1.65M | 2 | WA | 2023-10-02 | 2023-10-02 |
| Osborn Consulting, Inc. | $1.52M | 3 | WA | 2023-03-21 | 2024-01-12 |
| Fathom Architecture, LLC | $1.44M | 2 | WA | 2023-03-21 | 2024-01-17 |
| SC Solutions, Inc. | $1.37M | 3 | CA | 2023-04-06 | 2024-01-03 |
| Prodims LLC | $1.01M | 3 | WA | 2023-03-24 | 2024-01-12 |
| Veltre Engineering Inc. | $990.5K | 5 | CA | 2022-10-07 | 2024-01-12 |
| Casper, Phillips & Associates, Inc. P.C. | $853.5K | 3 | WA | 2023-04-11 | 2024-01-02 |
| Als Limited | $827.9K | 1 | WA | 2023-07-06 | 2023-07-06 |
| WSP Global Inc. | $804.7K | 2 | DC | 2024-01-27 | 2024-05-16 |
| Kelly Mcnutt Consulting LLC | $699.1K | 2 | WA | 2023-03-24 | 2023-12-18 |
| Pangeo, Inc. | $648.6K | 3 | WA | 2023-04-28 | 2024-01-18 |
| Tetra Tech, Inc. | $521.9K | 1 | WA | 2023-12-11 | 2023-12-11 |
| HDR Engineering, Inc. | $511.9K | 1 | CA | 2023-12-21 | 2023-12-21 |
| Sitts & Hill Engineers, Inc. | $510.2K | 3 | WA | 2023-04-18 | 2024-01-11 |
The 25 largest of 36; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2023-03-20 | WSP USA Solutions Inc | $30.28M | DESIGN DEVELOPMENT AND PROGRAM MANAGEMENT |
| 2023-04-20 | Stantec Consulting Services Inc. | $18.45M | DESIGN DEVELOPMENT |
| 2023-11-14 | Stantec Consulting Services Inc. | $10.23M | DESIGN DEVELOPMENT |
| 2023-04-11 | Moffatt & Nichol | $9.61M | DESIGN DEVELOPMENT |
| 2023-03-20 | Moffatt & Nichol | $9.55M | DESIGN DEVELOPMENT |
| 2023-03-24 | Stantec Consulting Services Inc. | $9.47M | DESIGN DEVELOPMENT |
| 2023-04-20 | Haley & Aldrich, Inc | $5.08M | DESIGN DEVELOPMENT |
| 2023-04-19 | Vet Industrial Inc | $4.86M | TOPOGRAPHIC SURVEY AND UTILITY INVESTIGATION; UPLAND SOIL CHARACTERIZATION, AQUIFER TESTING; SUBSURFACE/GEOTECHNICAL INVESTIGATION |
| 2023-12-08 | Haley & Aldrich, Inc | $4.46M | PROJECT DESIGN |
| 2023-06-16 | WSP USA Solutions Inc | $3.73M | DESIGN DEVELOPMENT AND PROGRAM MANAGEMENT |
| 2024-01-16 | Burns & Mcdonnell Engineering Company, Inc. | $2.31M | DESIGN DEVELOPMENT |
| 2024-01-16 | Burns & Mcdonnell Engineering Company, Inc. | $2.31M | DESIGN DEVELOPMENT |
| 2024-01-03 | P2S LP | $2.04M | DESIGN DEVELOPMENT |
| 2024-01-03 | P2S LP | $2.04M | DESIGN DEVELOPMENT |
| 2023-03-23 | P2S LP | $1.75M | DESIGN DEVELOPMENT |
| 2023-12-13 | Earth Mechanics, Inc. | $1.74M | DESIGN DEVELOPMENT |
| 2023-04-07 | Burns & Mcdonnell Engineering Company, Inc. | $1.71M | DESIGN DEVELOPMENT |
| 2024-01-08 | Vet Industrial Inc | $1.53M | FIELD SERVICES, INCLUDING TOPOGRAPHIC SURVEY AND UTILITY INVESTIGATION, CONTRIBUTING TO DESIGN DEVELOPMENT |
| 2023-03-21 | Wood Harbinger Inc | $1.39M | DESIGN DEVELOPMENT |
| 2023-03-21 | Wood Harbinger Inc | $1.39M | DESIGN DEVELOPMENT |
| 2024-01-12 | Wood Harbinger Inc | $1.28M | DESIGN DEVELOPMENT FOR PHASE 3 |
| 2024-01-12 | Wood Harbinger Inc | $1.28M | DESIGN DEVELOPMENT FOR PHASE 3 |
| 2023-07-06 | Als Group USA, Corp. | $827.9K | LABORATORY ANALYTICAL SERVICES |
| 2023-10-02 | Holt Services Inc | $824.8K | DRILLING SERVICES |
| 2023-10-02 | Holt Services Inc | $824.8K | DRILLING SERVICES |
28 actions since 2023-03-14. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-20 | P00029 | Administrative change | $0 | P454 MULTI-MISSION DRYDOCK |
| 2026-05-29 | P00028 | Supplemental agreement (work within scope) | $1.34M | P454 MULTI-MISSION DRYDOCK |
| 2026-04-01 | P00027 | Supplemental agreement (work within scope) | $338.9K | PREPARE, PRESENT, ATTEND, AND SUPPORT NAVFAC NW P454 PM AND DM IN NUMEROUS EXECUTIVE LEADERSHIP BRIEFS AND INDUSTRY EXCHANGE EVENTS PLANNED FOR MARCH THROUGH APRIL 2026. |
| 2026-03-11 | P00026 | Supplemental agreement (work within scope) | $143.2K | REQUEST FOR EQUITABLE ADJUSTMENT P 454 - MULTI MISSION DRY DOCK (M2D2) - INITIAL STUDIES PUGET SOUND NAVAL SHIPYARD (PSNS), BREMERTON, WASHINGTON |
| 2026-03-02 | P00025 | Additional work (new agreement) | $2.73M | P454 MULTI MISSION DRY DOCK - PERFORM BIO-ASSAY TESTING IN SUPPORT OF PERMITTING OF M2D2 CONSTRUCTION, KITSAP, BREMERTON. |
| 2025-10-17 | P00024 | Change order | $996.2K | P454 MULTI MISSION DRY DOCK - PERFORM BIO-ASSAY TESTING IN SUPPORT OF PERMITTING OF M2D2 CONSTRUCTION, KITSAP, BREMERTON. |
| 2025-09-05 | P00023 | Additional work (new agreement) | $10.41M | P454 - PHASE 4.2: CREATION OF MULTIPLE CONSTRUCTION CONTRACTS DESIGN PACKAGES, IN NAVAL BASE KITSAP, BREMERTON |
| 2025-08-14 | P00022 | Supplemental agreement (work within scope) | $76.0K | REQUEST FOR EQUITABLE ADJUSTMENT |
| 2025-05-15 | P00021 | Administrative change | $0 | PROVIDE ALL EFFORTS AS REQUIRED TO INCORPORATE COST REDUCTION OPPORTUNITIES INTO THE P454 M2D2 DESIGN PACKAGE. |
| 2025-04-17 | P00020 | Change order | $9.05M | PROVIDE ALL EFFORTS AS REQUIRED TO INCORPORATE COST REDUCTION OPPORTUNITIES INTO THE P454 M2D2 DESIGN PACKAGE. |
| 2025-03-27 | P00019 | Supplemental agreement (work within scope) | $9.2K | P454 MULTI-MISSION DRYDOCK (50% DESIGN, PHASE 4.5 80% OTS MEETING |
| 2025-03-25 | P00018 | Supplemental agreement (work within scope) | $206.6K | P454 MULTI-MISSION DRYDOCK, PHASE 3.5.1 MCCA |
| 2025-03-21 | P00017 | Administrative change | $0 | P454 MULTI-MISSION DRYDOCK, FUNDING ACRN UPDATES TO SLIN 001201 UNDER CLIN 0012. |
| 2025-02-19 | P00016 | Option exercised | $36.23M | P454 MULTI-MISSION DRYDOCK- 80% TO FINAL DESIGN. |
| 2025-01-29 | P00015 | Administrative change | $0 | P454 MULTI-MISSION DRYDOCK - DESIGN PHASE 4.0.1 - 65% SHORE FACILITY DESIGN COORDINATION EXTENSION - NO COST MOD |
| 2024-12-18 | P00014 | Administrative change | $0 | ADMIN MODIFICATION TO ADD SDN TO FUNDING TAB |
| 2024-11-27 | P00013 | Supplemental agreement (work within scope) | $249.5K | PHASE 3.5 MULTIPLE CONSTRUCTION CONTRACT ASSESSMENT |
| 2024-11-25 | P00012 | Supplemental agreement (work within scope) | $39.93M | P454 MULTI-MISSION DRYDOCK - 80% AND OPTION FOR FINAL DESIGN |
| 2024-08-01 | P00011 | Supplemental agreement (work within scope) | $239.1K | P454 MULTI-MISSION DRYDOCK PHASE 3.4 COST SAVINGS REDUCTION |
| 2024-05-09 | P00010 | Supplemental agreement (work within scope) | $931.3K | P454 MULTI-MISSION DRY DOCK PHASE 3.1 |
| 2024-01-24 | P00009 | Supplemental agreement (work within scope) | $58.3K | P454 MULTI-MISSION DRYDOCK (50% DESIGN)- REQUEST FOR EQUITABLE ADJUSTMENT - ESTABLISHMENT OF A CENTRAL ACCUMULATION AREA (CAA) AT PUGET SOUND NAVAL SHIPYARD, BREMERTON, WA |
| 2023-11-14 | P00008 | Supplemental agreement (work within scope) | $49.97M | P454 MULTI-MISSION DRYDOCK, AE SERVICES, PSNS, BREMERTON, WA |
| 2023-11-02 | P00007 | Funding only | $130.6K | P454 MULTI-MISSION DRYDOCK (35% DESIGN) |
| 2023-07-14 | P00006 | Supplemental agreement (work within scope) | -$702.8K | P454 MULTI-MISSION DRYDOCK (35% DESIGN) |
| 2023-06-09 | P00005 | Supplemental agreement (work within scope) | $3.97M | P454 MULTI-MISSION DRYDOCK (35% DESIGN) ADDITIONAL SURVEYS, TEST PILE PROGRAM STUDY, DREDGE MATERIAL CHARACTERIZATION |
| 2023-04-12 | P00004 | Administrative change | $0 | P454 MULTI-MISSION DRYDOCK (35% DESIGN)- NO-COST, ADMINISTRATIVE MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE FOR CLINS 0002 AND 0003. |
| 2023-04-10 | P00003 | Supplemental agreement (work within scope) | $86.0K | P454 MULTI-MISSION DRYDOCK DESIGN (VADM BRIEF - WASH DC) |
| 2023-03-14 | P00002 | Supplemental agreement (work within scope) | $49.30M | P454 MULTI-MISSION DRYDOCK (35% DESIGN) |