FIRM-FIXED-PRICE FOR ALL LABOR, MATERIALS, EQUIPMENT, AND ASSOCIATED COSTS FOR A DESIGN-BUILD PROJECT TO REPLACE LIFT STATION IN COMPLIANCE WITH UFC 3-240-01 AND REMOVE EXISTING PUMP HOUSE BUILDING 102.
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
4 subawards totaling $988.3K (82.6% of what was obligated), as Chugach Solutions Enterprise, LLC reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Holmes Mechanical, Inc. | $750.1K | 1 | WA | 2025-05-13 | 2025-05-13 |
| Bronco Electric, Inc | $139.6K | 1 | WA | 2024-10-22 | 2024-10-22 |
| Long Building Technologies, Inc. | $50.9K | 1 | CO | 2024-11-15 | 2024-11-15 |
| Wood Harbinger Inc | $47.8K | 1 | WA | 2024-10-30 | 2024-10-30 |
| Date | To | Amount | For |
|---|---|---|---|
| 2025-05-13 | Holmes Mechanical, Inc. | $750.1K | PROVIDE CIVIL WORK, LIFT STATION DEMOLITION AND MECHANICAL. |
| 2024-10-22 | Bronco Electric, Inc. | $139.6K | DEMOLISH EXISTING ELECTRICAL AT B102 PANELS, DISCONNECTS, TRANSFORMERS, RACEWAYS, AND CONDUCTORS. INSTALL NEW ELECTRICAL SERVICE EQUIPMENT FOR B102. |
| 2024-11-15 | Long Building Technologies, Inc. | $50.9K | PROVIDE AND INSTALL APPROVED MANAGED ETHERNET SWITCH AND CONNECT TO A FIBER PATCH PANEL AT THE NEW LIFT STATION PANEL. PROVIDE AND INSTALL NIAGARA SUPERVISORY CONTROLLER THAT WILL COMMUNICATE WITH THE LIFT STATION… |
| 2024-10-30 | Wood Harbinger Inc | $47.8K | REPLACE LIFT STATION AND NEARBY PIPING. |
1 action since 2024-06-25. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2024-06-25 | 0 | $1.20M | FIRM-FIXED-PRICE FOR ALL LABOR, MATERIALS, EQUIPMENT, AND ASSOCIATED COSTS FOR A DESIGN-BUILD PROJECT TO REPLACE LIFT STATION IN COMPLIANCE WITH UFC 3-240-01 AND REMOVE EXISTING PUMP HOUSE BUILDING 102. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗