REMOVE CORRUGATED CEMENT ASBESTOS BOARD ROOFING SYSTEM, VENTILATION, FASCIA, DAMAGED STRUCTURAL MEMBERS. REPLACE WITH NEW STEEL ROOF SYSTEM INCLUDING DISCONNECTION AND RECONNECTION OF ALL UTILITIES AND THE REPLACEMENT OF DAMAGED STRUCTURAL MEMBERS.
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
3 subawards totaling $435.9K (66.6% of what was obligated), as Chugach Solutions Enterprise, LLC reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Columbia Sheet Metal, Inc. of Washington | $223.1K | 1 | WA | 2025-08-26 | 2025-08-26 |
| Lmo Construction, LLC | $159.5K | 1 | WA | 2025-09-05 | 2025-09-05 |
| Dickson Company | $53.3K | 1 | WA | 2025-08-12 | 2025-08-12 |
| Date | To | Amount | For |
|---|---|---|---|
| 2025-08-26 | Columbia Sheet Metal, Inc. of Washington | $223.1K | SUPPLY AND INSTALL 24 GAUGE PREFINISHED TAYLOR METALS VERSA‐SPAN 12" STANDING‐SEAM METAL ROOF; 24 GAUGE PREFINISHED METAL PANEL RELATED FLASHINGS ON EAVE, NON‐VENTED RIDGE, ZEES, RAKE, FASCIA WRAP; 20 EACH FALL… |
| 2025-09-05 | Lmo Construction, LLC | $159.5K | SELECTIVE DEMOLITION AND REPLACEMENT OF UP TO 20% OF STRUCTURAL MEMBERS AS IDENTIFIED IN ROOF SURVEY; RELEVEL 50% OF THE TOTAL ROOF SQUARE FOOTAGE BY ADJUSTING OR ADDING TO THE EXISTING ROOF STRUCTURAL SUPPORT MEMBERS;… |
| 2025-08-12 | Dickson Company | $53.3K | ABATE EXISTING CORRUGATED CEMENT ASBESTOS BOARD ROOFING SYSTEM; REMOVE VENTILATION, FASCIA ON ROOFING SYSTEM, DOWNSPOUTS, AND GUTTERS; COVER ALL SHELVING AND CONTENTS WITH PLASTICS PRIOR TO ABATEMENT WORK. |
1 action since 2025-06-12. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2025-06-12 | 0 | $654.3K | REMOVE CORRUGATED CEMENT ASBESTOS BOARD ROOFING SYSTEM, VENTILATION, FASCIA, DAMAGED STRUCTURAL MEMBERS. REPLACE WITH NEW STEEL ROOF SYSTEM INCLUDING DISCONNECTION AND RECONNECTION OF ALL UTILITIES AND THE REPLACEMENT OF DAMAGED STRUCTURAL MEMBERS. |