THIS PROJECT IS TO ADD LOCAL, MANUAL STEAM PRESSURE REDUCING CONTROL STATIONS AT THE MAIN CARRIER DOCKING PIERS, PIER D AND PIER B.
Up for re-bid: ends 2026-09-25. Recompete brief → · 26RF015_FY26 P942U Explosives Handling Route Relocation ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
3 subawards totaling $1.16M (51.3% of what was obligated), as Chugach Solutions Enterprise, LLC reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Holmes Mechanical, Inc. | $826.7K | 1 | WA | 2025-10-23 | 2025-10-23 |
| Lmo Construction, LLC | $175.0K | 1 | WA | 2025-09-05 | 2025-09-05 |
| Art Anderson Associates Inc | $159.7K | 1 | WA | 2025-09-03 | 2025-09-03 |
| Date | To | Amount | For |
|---|---|---|---|
| 2025-10-23 | Holmes Mechanical, Inc. | $826.7K | INSTALL MANUAL STEAM CONTROLS AT PIER B AND PIER D. |
| 2025-09-05 | Lmo Construction, LLC | $175.0K | PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO INSTALL A PREFABRICATED METAL BUILDING APPROXIMATELY 8' X 16' WITH ONE 3' X 7' MAN‐DOOR, GUTTERS, DOWNSPOUTS, AND SPLASH BLOCKS; BOLT BUILDING TO EXISTING CONCRETE SLAB;… |
| 2025-09-03 | Art Anderson Associates Inc | $159.7K | PREPARE DESIGN QUALITY CONTROL PLAN AND ACTING AS DESIGN QUALITY CONTROL MANAGER; DESIGN SUBMITTALS AS OUTLINED IN THE GOVERNMENT REQUEST FOR PROPOSAL FOR DESIGN DEVELOPMENT, PREFINAL, AND FINAL DESIGN; CONSTRUCTION… |
2 actions since 2025-07-21. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2025-12-18 | P00001 | Administrative change | $0 | THIS PROJECT IS TO ADD LOCAL, MANUAL STEAM PRESSURE REDUCING CONTROL STATIONS AT THE MAIN CARRIER DOCKING PIERS, PIER D AND PIER B. |
| 2025-07-21 | 0 | $2.26M | THIS PROJECT IS TO ADD LOCAL, MANUAL STEAM PRESSURE REDUCING CONTROL STATIONS AT THE MAIN CARRIER DOCKING PIERS, PIER D AND PIER B. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗