DB CONSTRUCT O2 CLEAN ROOM, B7000, TRF BANGOR-PROVIDING A CLEAN ROOM FACILITY WITHIN EXISTING BUILDING FOOTPRINT OF BUILDING 7000 (B7000) TO ACCOMMODATE O2 CLEANING PROCESSES, AND INCLUDES A RECEIVING AREA, DRESSING/LOCKER ROOM, AND AIR SHOWER.
Up for re-bid: ends 2026-10-02. Recompete brief → · 26RF015_FY26 P942U Explosives Handling Route Relocation ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
4 subawards totaling $1.49M (67.1% of what was obligated), as Chugach Solutions Enterprise, LLC reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Holmes Mechanical, Inc. | $645.0K | 1 | WA | 2026-03-02 | 2026-03-02 |
| Miller Sheetmetal Inc | $440.3K | 1 | WA | 2026-03-06 | 2026-03-06 |
| Chinook Properties, Inc. | $324.9K | 1 | WA | 2026-07-20 | 2026-07-20 |
| Art Anderson Associates Inc | $78.0K | 1 | WA | 2025-10-16 | 2025-10-16 |
| Date | To | Amount | For |
|---|---|---|---|
| 2026-03-02 | Holmes Mechanical, Inc. | $645.0K | DESIGN BUILD CONTRACT TO INCLUDE DESIGN, LABOR, MATERIALS, SUPERVISION AND EQUIPMENT TO PERFORM ALL REQUIRED WORK AT B7000 TO ACCOMMODATE O2 CLEANING PROCESSES, AND INCLUDES A RECEIVING AREA, DRESSING/LOCKER ROOMS AND… |
| 2026-03-06 | Miller Sheetmetal Inc | $440.3K | DESIGN BUILD CONTRACT TO INCLUDE DESIGN, LABOR, MATERIALS, SUPERVISION AND EQUIPMENT TO PERFORM ALL REQUIRED WORK AT B7000, BANGOR WASHINGTON. THE WORK WILL PROVIDE A CLEAN ROOM FACILITY WITHIN EXISTING BUILDING… |
| 2026-07-20 | Chinook Properties, Inc. | $324.9K | CONCRETE AND SAFETY WALLS AND DOORS, FLOORING, FINISHES AND CONCRETE MASONRY UNIT. |
| 2025-10-16 | Art Anderson Associates Inc | $78.0K | DESIGN SERVICE. PROVIDE ENGINEERING, DESIGN, DESIGNER OF RECORD, AND DESIGN QUALITY CONTROL. |
1 action since 2025-09-17. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2025-09-17 | 0 | $2.22M | DB CONSTRUCT O2 CLEAN ROOM, B7000, TRF BANGOR-PROVIDING A CLEAN ROOM FACILITY WITHIN EXISTING BUILDING FOOTPRINT OF BUILDING 7000 (B7000) TO ACCOMMODATE O2 CLEANING PROCESSES, AND INCLUDES A RECEIVING AREA, DRESSING/LOCKER ROOM, AND AIR SHOWER. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗