N4425525F0265↗

WSM Pacific Siop, a Joint Venture received this contract from Navfacsyscom Northwest, Department of the Navy: $5.44M obligated so far for architect and engineering- general: landscaping, interior layout, and designing. It runs to 2027-04-22.

Key facts · data as of Oct 25, 2026

Recipient
WSM Pacific Siop, a Joint Venture
Awarding agency
Department of the Navy (Department of Defense)
Contracting office
Navfacsyscom Northwest (N44255)
Obligated to date
$5.44M
Potential value
$5.44M
Ends
2027-04-22

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.

Cite this page: SpendQuery, Award N4425525F0265, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_AWD_N4425525F0265_9700_N6274221D0001_9700

AUTHOR A DB RFP THAT IDENTIFIES THE DESIGN AND CONSTRUCTION REQUIREMENTS FOR A NEW SHIPFITTER-WELDER FACILITY (SHOPS 11 AND 26) THAT IS; 10-15 PERCENT DESIGN LEVEL OF COMPLETION AND NO GREATER THAN THE EXISTING B460 (310,088 SF).

Delivery Order · Department of the Navy · to WSM Pacific Siop, a Joint Venture (UEI LTRAAFDB1H51) · data as of 2026-10-25

Obligated to date$5.44M4 actions
Current value$5.44Mwith options exercised
Period2025-09-18 → 2027-04-22current end date

Up for re-bid: ends 2027-04-22. Recompete brief → · RFP Professional Engineering Services Support ↗

What it is

Product or service
Architect and Engineering- General: Landscaping, Interior Layout, and Designing (PSC C211)
Industry
Engineering Services (NAICS 541330)
Contracting office
Navfacsyscom Northwest (N44255)
Competition
Full and open competition
Pricing
Firm fixed price
How it was bought
Single-award IDIQ · under N6274221D0001
Where the work is
Kitsap, WA · district WA-06

Obligations by fiscal year

FY2025$3.09M
FY2026$2.35M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

4 actions since 2025-09-18. Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2026-07-14P00003Administrative change$0AUTHOR A DB RFP THAT IDENTIFIES THE DESIGN AND CONSTRUCTION REQUIREMENTS FOR A NEW SHIPFITTER-WELDER FACILITY (SHOPS 11 AND 26) THAT IS; 10-15 PERCENT DESIGN LEVEL OF COMPLETION AND NO GREATER THAN THE EXISTING B460 (310,088 SF).
2026-04-29P00002Supplemental agreement (work within scope)$335.7KAUTHOR A DB RFP THAT IDENTIFIES THE DESIGN AND CONSTRUCTION REQUIREMENTS FOR A NEW SHIPFITTER-WELDER FACILITY (SHOPS 11 AND 26) THAT IS; 10-15 PERCENT DESIGN LEVEL OF COMPLETION AND NO GREATER THAN THE EXISTING B460 (310,088 SF).
2026-04-27P00001Supplemental agreement (work within scope)$2.02MAUTHOR A DB RFP THAT IDENTIFIES THE DESIGN AND CONSTRUCTION REQUIREMENTS FOR A NEW SHIPFITTER-WELDER FACILITY (SHOPS 11 AND 26) THAT IS; 10-15 PERCENT DESIGN LEVEL OF COMPLETION AND NO GREATER THAN THE EXISTING B460 (310,088 SF).
2025-09-180$3.09MAUTHOR A DB RFP THAT IDENTIFIES THE DESIGN AND CONSTRUCTION REQUIREMENTS FOR A NEW SHIPFITTER-WELDER FACILITY (SHOPS 11 AND 26) THAT IS; 10-15 PERCENT DESIGN LEVEL OF COMPLETION AND NO GREATER THAN THE EXISTING B460 (310,088 SF).

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-25). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗