R.A. Burch Construction Co., Inc. received this contract from Navfacsyscom Southwest, Department of the Navy: $26.50M obligated so far for maintenance of other educational buildings. It runs to 2027-01-19.
Key facts · data as of Oct 23, 2026
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 23, 2026.
Cite this page: SpendQuery, Award N6247323F4585, data as of Oct 23, 2026, https://spendquery.com/award?id=CONT_AWD_N6247323F4585_9700_N6247320D1126_9700
R.A. Burch Construction Co., Inc.: all federal awards · Department of Defense: spending · Navfacsyscom Southwest: what it buys · The follow-on: recompete brief
BUILDING 232 - SPANAGEL HALL
Up for re-bid: ends 2027-01-19. Recompete brief → · IDIQ JOC FOR GENERAL CONSTRUCTION PROJECTS AT GOVERNMENT INSTALLATIONS WITHIN NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND SOUTHWEST THE METROPOLITAN SAN DIEGO (NAVAL BASES SAN DIEGO, POINT LOMA, CORONADO AND MARINE CORPS AIR STATION (MCAS) MIRAMAR, CALIF ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
7 subawards totaling $13.48M (50.9% of what was obligated), as R.A. Burch Construction Co., Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Empire Contract Glazing Inc | $10.00M | 1 | CA | 2024-03-18 | 2024-03-18 |
| A1 Quality Blinds | $1.16M | 1 | CA | 2024-04-08 | 2024-04-08 |
| Nicholas Antonio Lecce | $1.00M | 1 | CA | 2024-11-06 | 2024-11-06 |
| Clauss Construction | $682.5K | 1 | CA | 2023-11-10 | 2023-11-10 |
| M3 Environmental, LLC | $300.0K | 1 | CA | 2024-08-05 | 2024-08-05 |
| RGM Design Group, Inc | $225.8K | 1 | CA | 2024-05-16 | 2024-05-16 |
| Rizza Engineering, Inc. | $110.0K | 1 | CA | 2023-10-13 | 2023-10-13 |
| Date | To | Amount | For |
|---|---|---|---|
| 2024-03-18 | Empire Contract Glazing Inc | $10.00M | INSTALLATION OF ALUMINUM DOORS, ALUMINUM WINDOWS |
| 2024-04-08 | A1 Quality Blinds | $1.16M | COMPLETE INSTALLATION OF ROLLER WINDOW SHADES |
| 2024-11-06 | Nicholas Antonio Lecce | $1.00M | ELECTRICAL AND COMM REMOVAL |
| 2023-11-10 | Clauss Construction | $682.5K | SITE AND STRUCTURAL DEMOLITION |
| 2024-08-05 | M3 Environmental, LLC | $300.0K | ONSITE HYGIENIST |
| 2024-05-16 | RGM Design Group, Inc | $225.8K | STRUCTURAL ENGINEERING DESIGN THROUGH DEVELOPMENT |
| 2023-10-13 | Rizza Engineering, Inc. | $110.0K | ELECTRICAL ENGINEERING |
2 actions since 2023-09-11. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2025-03-05 | P00001 | Supplemental agreement (work within scope) | $2.47M | B232 & B235 FENESTRATIONS ABATEMENT - UPOB |
| 2023-09-11 | 0 | $24.03M | BUILDING 232 - SPANAGEL HALL |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-23). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗