CONTRACT N62742-23-C-1329, FY23 FHCON H-366, H-283, & H-375 REPLACE ANDERSEN HOUSING PHASE IV, V, & VI, NAVAL SUPPORT ACTIVITY ANDERSEN,GUAM
Up for re-bid: ends 2027-04-14. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
12 actions since 2023-07-28. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-06-01 | P00011 | Supplemental agreement (work within scope) | $8.86M | N62742-23-C-1329 H366, H283 AND H375 FY23 MCON REPLACE ANDERSEN HOUSING PHASE IV, V, AND VI NAVAL SUPPORT ACTIVITY ANDERSEN, GUAMPC 11 - ADDITIONAL DUPLEXESPC 13 - REPLACE SINKRFI 0185A.01 REPLACEMENT OF CLOSET 2 BI-FOLD DOOR D206 AND SINGLE LEAF |
| 2026-01-07 | P00010 | Supplemental agreement (work within scope) | $96.2K | N62742-23-C-1329 H366, H283 AND H375 FY23 MCON REPLACE ANDERSEN HOUSING PHASE IV, V, AND VI NAVAL SUPPORT ACTIVITY ANDERSEN, GUAMP00010 -THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE PC12 SWITCHGEAR PROVISIONS |
| 2025-12-29 | P00009 | Supplemental agreement (work within scope) | $0 | N62742-23-C-1329 H366, H283 AND H375 FY23 MCON REPLACE ANDERSEN HOUSING PHASE IV, V, AND VI NAVAL SUPPORT ACTIVITY ANDERSEN, GUAM P00009 -THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE PC09 PHASING PLAN REVISION AND PC10 EXTEND TURNOVER OF PH 1. |
| 2025-07-10 | A00008 | Supplemental agreement (work within scope) | $31.3K | N62742-23-C-1329 H366, H283 AND H375 FY23 MCON REPLACE ANDERSEN HOUSING PHASE IV, V, AND VI NAVAL SUPPORT ACTIVITY ANDERSEN, GUAM P00008 -THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE PC08 GOVERNMENT FIBER OPTIC LINES |
| 2025-03-18 | P00007 | Administrative change | $0 | P00007: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FINAL DESIGN DRAWINGS AND SPECIFICATIONS. |
| 2025-03-10 | P00006 | Supplemental agreement (work within scope) | $197.3K | PC06 PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY TO INSTALL AN ACCESS HOLE FOR INTERIOR TO EXTERIOR CABLE CONNECTION. |
| 2025-02-03 | P00005 | Supplemental agreement (work within scope) | $254.6K | PROPOSED CHANGE (PC) 05: PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY TO RELOCATE RADON RISER AND FAN ASSEMBLY FROM ORIGINAL LOCATION AT THE MECHANICAL ROOMS TO THE EXTERIOR OF THE HOUSING UNITS. |
| 2024-08-06 | P00004 | Supplemental agreement (work within scope) | $609.5K | P00004/PROPOSED CHANGE (PC) 04: PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY TO TRANSFER COMMISSIONING AGENT AND COMMISSIONING RESPONSIBILITY TO CONTRACTOR. |
| 2024-08-05 | P00003 | Supplemental agreement (work within scope) | $228.3K | P00003/PROPOSED CHANGE (PC) 03: PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY TO CONDUCT SOIL SAMPLING AND ANALYSIS FROM 2-10 FT AT 0-0.5 FT BELOW GROUND SURFACE FOR THE REMAINING 62 FORMER HOUSING LOCATIONS. |
| 2024-07-18 | P00002 | Supplemental agreement (work within scope) | $80.2K | P00002/PROPOSED CHANGE (PC) 01: PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY FOR TEN (10) VARIOUS DESIGN CHANGES |
| 2024-06-28 | P00001 | Supplemental agreement (work within scope) | $9.4K | P00001/PROPOSED CHANGE (PC) 02: PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY FOR A BUILDING UNIT LOCATION SWAP. NOTE THAT THE UNIT QUANTITIES AND TYPE REMAINS THE SAME. |
| 2023-07-28 | 0 | $216.88M | CONTRACT N62742-23-C-1329, FY23 FHCON H-366, H-283, & H-375 REPLACE ANDERSEN HOUSING PHASE IV, V, & VI, NAVAL SUPPORT ACTIVITY ANDERSEN,GUAM |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-23). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗