CONSOLIDATED AFLOAT NETWORKS AND ENTERPRISE SERVICES (CANES) HARDWARE SYSTEM TECHNICAL DATA PACKAGE (TDP), ENVIRONMENTAL QUALIFICATIONS TESTING (EQT), FIELD SYSTEMS, AND ENGINEERING DESIGN MODIFICATIONS (EDM), FISCAL YEARS 2024-2026
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
9 subawards totaling $1.48M (20.9% of what was obligated), as Science Applications International Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
11 actions since 2024-03-08. Each is a modification or amendment with the money it added or took back.
Date
Modification
Kind
Amount
What the agency wrote
2026-04-15
P00010
Option exercised
$95.5K
THIS TASK ORDER COVERS CONSOLIDATED AFLOAT NETWORKS AND ENTERPRISE SERVICES HARDWARE SYSTEM TECHNICAL DATA PACKAGE, ENVIRONMENTAL QUALIFICATIONS TESTING, FIELD SYSTEMS, AND ENGINEERING DESIGN MODIFICATIONS FOR FISCAL YEARS 2024-2026
2026-03-06
P00009
Administrative change
$362.0K
THIS TASK ORDER COVERS CONSOLIDATED AFLOAT NETWORKS AND ENTERPRISE SERVICES HARDWARE SYSTEM TECHNICAL DATA PACKAGE, ENVIRONMENTAL QUALIFICATIONS TESTING, FIELD SYSTEMS, AND ENGINEERING DESIGN MODIFICATIONS FOR FISCAL YEARS 2024-2026
2025-08-26
P00008
Administrative change
$0
THIS MODIFICATION IS TO CORRECTLY SPLIT COST AND FEE ON CLIN 0004 AND SLINS 0004AA, 0004AB, AND 0004AC. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
2025-07-29
P00007
Funding only
$152.0K
1)TO REALIGN CEILING: CLIN 1010 BY $119,939.65 TO $1,015,862.44 CLIN1003 BY $119,974.33 TO $992,930.41 2) INCREMENTALLY FUND CLIN1010 BY $98,258.24 & $53,775.14 3)UPDATE SECTION B 4)CORRECT PSC AND PROG CODES ON SLINS 1003AD, 1004AD, 1008AC, 1009AC
2025-06-25
P00006
Funding only
$713.6K
INCREMENTAL FUNDING
2025-05-30
P00005
Administrative change
$1.14M
1) DEOB $159,271.95 FROM THE FOLLOWING SLINS: 0005AE BY: $7,200.00 0010AD BY: $53,803.04 0010AE BY: $98,268.91 2) INCREMENTALLY FUND BY $1,298,765.31 3) UPDATE SECTION B TEXT ACCORDINGLY
2025-03-07
P00004
Option exercised
$1.06M
EXERCISE OPTION CLINS 1001 TO 1006, 1008 TO 1011, AND 1016 FOR THE PERIOD 10 MARCH 2025 TO 9 MARCH 2026 ADD CLINS 1016 ENGINEERING DESIGN MODIFICATION SCN AND 1017 TDP MAINTENANCE REARRANGE CEILING INC FUND $1,059,747.86
2024-08-15
P00003
Funding only
$1.39M
THE PURPOSE OF THIS MODIFICATION IS TO: 1. TO INCREMENTALLY FUND THE ORDER 2. CORRECTS PREVIOUS HOLDING SLIN ERRORS 3. UPDATES SECTION B TEXT ACCORDINGLY
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
2024-07-29
Intellipower, Inc.
$31.7K
UNINTERRUPTIBLE POWER SUPPLIES AND BATTERY MODULES
2024-07-29
Intellipower, Inc.
$31.7K
UNINTERRUPTIBLE POWER SUPPLIES AND BATTERY MODULES
2024-06-24
P00002
Option exercised
$1.50M
EXERCISE OPTION, INCREMENTAL FUNDING
2024-04-03
P00001
Administrative change
-$16.1K
THIS MOD IS TO DE-OBLIGATE THE AMOUNTS FROM THE FOLLOWING SLINS: 0001AB $174,968.14 0002 $8,961.21 0003AB $474,992.19 0005AB$25,000.00 AND RE-OBLIGATE 0001AC $474,970.44 0016 $8,961.21 0003AC $174,923.47 0005AC $8,961.21.
2024-03-08
0
$683.9K
CONSOLIDATED AFLOAT NETWORKS AND ENTERPRISE SERVICES (CANES) HARDWARE SYSTEM TECHNICAL DATA PACKAGE (TDP), ENVIRONMENTAL QUALIFICATIONS TESTING (EQT), FIELD SYSTEMS, AND ENGINEERING DESIGN MODIFICATIONS (EDM), FISCAL YEARS 2024-2026
N6523624F0211: Consolidated Afloat Networks and Enterprise Services (Canes)… · SpendQuery