Putting the award page together from the records…
Putting the award page together from the records…
MOBILE COMMAND VEHICLE (MCV) PRODUCTION SUPPORT
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
71 subawards totaling $25.64M (111.7% of what was obligated), as Science Applications International Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| T2S LLC | $6.00M | 1 | MD | 2025-02-19 | 2025-02-19 |
| Francisco Partners Management, L.P. | $2.98M | 4 | TX | 2024-07-30 | 2025-02-27 |
| Blueally Technology Solutions LLC | $2.55M | 5 | NC | 2024-08-27 | 2025-02-25 |
| Sterling Precision Machining, Inc | $2.07M | 4 | SC | 2024-07-17 | 2024-07-31 |
| Red River Technology LLC | $1.67M | 2 | VA | 2025-02-05 | 2025-02-20 |
| Aar Manufacturing, Inc. | $1.53M | 2 | MI | 2024-09-25 | 2025-03-26 |
| Sterling Computers Corporation | $1.52M | 2 | SD | 2025-02-05 | 2025-02-19 |
| Iron Bow Technologies, LLC | $1.05M | 1 | VA | 2025-02-07 | 2025-02-07 |
| HDT Expeditionary Systems Inc | $737.9K | 1 | OH | 2026-07-17 | 2026-07-17 |
| Shock Tech Inc | $657.2K | 3 | NJ | 2024-07-18 | 2024-07-18 |
| Gill Metal Fab Inc |
6 actions since 2024-06-28. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-03-12 | P00005 | Administrative change | $0 | THIS ACTION COVERS SYSTEMS DESIGN, SYSTEMS ENGINEERING, INTEGRATION, TESTING, QUALITY ASSURANCE, LOGISTICS, PROCUREMENT, KITTING, TECHNICAL DOCUMENTATION, PROGRAM MANAGEMENT AND PRODUCTION SERVICES IN SUPPORT OF THE NIWC ATLANTIC MCV PROJECT. |
| 2025-12-22 | P00004 | Funding only | $2.89M | THIS ACTION COVERS SYSTEMS DESIGN, SYSTEMS ENGINEERING, INTEGRATION, TESTING, QUALITY ASSURANCE, LOGISTICS, PROCUREMENT, KITTING, TECHNICAL DOCUMENTATION, PROGRAM MANAGEMENT AND PRODUCTION SERVICES IN SUPPORT OF THE NIWC ATLANTIC MCV PROJECT. |
| 2025-06-30 | P00003 | Option exercised | $6.30M | MOBILE COMMAND VEHICLE (MCV) PRODUCTION SUPPORT |
| 2025-05-19 | P00002 | Administrative change | $0 | ENGINEERING SUPPORT |
| 2025-02-14 | P00001 | Supplemental agreement (work within scope) | $4.57M | MOBILE COMMAND VEHICLE PRODUCTION SUPPORT |
| 2024-06-28 | 0 | $9.19M | MOBILE COMMAND VEHICLE (MCV) PRODUCTION SUPPORT |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
| $605.7K |
| 3 |
| MA |
| 2024-07-11 |
| 2025-09-23 |
| Master Sheetmetal Works Inc | $575.5K | 2 | SC | 2025-09-15 | 2025-09-15 |
| Heilind Mil-Aero LLC | $496.4K | 5 | NJ | 2024-07-18 | 2025-09-18 |
| Electromet Corporation | $468.7K | 3 | MD | 2024-07-19 | 2025-09-03 |
| Eaco Corporation | $400.8K | 4 | CA | 2024-07-18 | 2025-11-07 |
| Lyme Computer Systems, Inc. | $365.1K | 1 | NH | 2025-02-13 | 2025-02-13 |
| Carahsoft Technology Corp | $254.4K | 1 | VA | 2024-10-09 | 2024-10-09 |
| Phantom Products, Inc. | $221.9K | 3 | FL | 2024-07-11 | 2025-08-25 |
| Tabet Manufacturing Company, Inc. | $182.9K | 2 | VA | 2024-07-31 | 2024-07-31 |
| Rko Total Graphics, LLC | $163.0K | 3 | SC | 2024-07-18 | 2024-07-18 |
| Logistics365 Inc | $148.3K | 2 | NE | 2024-07-16 | 2024-07-16 |
| Afp Industries Inc | $133.0K | 2 | SC | 2025-09-16 | 2025-09-24 |
| J&K Electronics Inc | $125.2K | 3 | NY | 2024-07-19 | 2024-07-31 |
| Mvrsimulation Inc | $120.1K | 1 | MA | 2025-02-04 | 2025-02-04 |
| General Devices Co Inc | $107.7K | 3 | IN | 2024-07-18 | 2024-07-18 |
The 25 largest of 33; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2025-02-19 | T2S, LLC | $6.00M | SUPPORTING EXPERTISE AND BACKGROUND IN IN THE AREAS OF ENGINEERING SERVICES, SYSTEMS ENGINEERING, ELECTRONIC ENGINEERING, MECHANICAL ENGINEERING, COMPUTER ENGINEERING, SOFTWARE DESIGN, DEVELOPMENT, FABRICATION,… |
| 2025-02-27 | Dell Federal Systems L.P | $2.33M | DELL COMPUTERS |
| 2025-02-25 | Blueally Technology Solutions LLC | $1.65M | CITRIX CLOUD RENEWAL PLUS NEW LICENSES AND SUPPORT |
| 2024-09-25 | Aar Manufacturing, Inc. | $1.43M | AAR SHELTERS |
| 2025-02-20 | Red River Technology LLC | $1.13M | VMWARE CLOUD FOUNDATIONS 5 LICENSES |
| 2025-02-07 | Iron Bow Technologies, LLC | $1.05M | CISCO ROUTERS, SWITCHES, NETWORK MODULES, POWER SUPPLIES AND CABLE MANAGEMENT. |
| 2025-02-19 | Sterling Computers Corporation | $1.01M | HP THIN CLIENTS AND PERIPHERAL HARDWARE |
| 2024-07-31 | Sterling Precision Machining, Inc | $962.3K | METAL FAB |
| 2024-07-31 | Sterling Precision Machining, Inc | $962.3K | METAL FAB |
| 2026-07-17 | HDT Expeditionary Systems Inc | $737.9K | DATABRICKS SERVICES |
| 2025-02-13 | Blueally Technology Solutions LLC | $556.5K | DELL OPTIPLEX THIN CLIENTS, LG MONITORS, BELKIN SWITCH, HP LASERJET PRINTER AND INK, CISCO CONFERENCE PHONES AND IDENTIV SMART CARD READERS. |
| 2025-02-05 | Red River Technology LLC | $542.7K | PALO ALTO SOFTWARE LICENSES |
| 2025-02-05 | Sterling Computers Corporation | $515.1K | SPIRENT HARDWARE AND PRODUCT SUPPORT RENEWALS |
| 2025-02-13 | Lyme Computer Systems, Inc. | $365.1K | PREPHIX SOFTWARE LICENSES |
| 2025-02-13 | Dell Marketing L.P. | $360.7K | MICROSOFT LICENSES |
| 2025-09-15 | Master Sheetmetal Works Inc | $306.9K | METAL FAB |
| 2025-09-15 | Master Sheetmetal Works Inc | $268.6K | METAL FAB |
| 2024-10-09 | Carahsoft Technology Corp | $254.4K | SERVICENOW LICENSES AND ON-SITE TRAINING |
| 2024-07-11 | Gill Metal Fab Inc | $240.3K | CABINET - MODIFIED, UPPER, FORWARD CABINET - MODIFIED, UPPER, REAR CABINET - MODIFIED, LOWER |
| 2024-07-11 | Gill Metal Fab Inc | $240.3K | CABINET - MODIFIED, UPPER, FORWARD CABINET - MODIFIED, UPPER, REAR CABINET - MODIFIED, LOWER |
| 2024-07-18 | Shock Tech Inc | $219.1K | SHOCKTECH PRODUCT |
| 2024-07-18 | Shock Tech Inc | $219.1K | SHOCKTECH PRODUCT |
| 2024-07-18 | Shock Tech Inc | $219.1K | SHOCKTECH PRODUCT |
| 2024-07-19 | Electromet Corporation | $194.9K | LEG, ELECTRICAL EQUIPMENT-MODIFIED LEG, ELECTRICAL EQUIPMENT-MODIFIEDLEG, ELECTRICAL EQUIPMENT, BATTERY BOX BRACKET, SUPPORT, CEILING BRACKET, SUPPORT, FLOOR |
| 2024-07-19 | Electromet Corporation | $194.9K | LEG, ELECTRICAL EQUIPMENT-MODIFIED LEG, ELECTRICAL EQUIPMENT-MODIFIEDLEG, ELECTRICAL EQUIPMENT, BATTERY BOX BRACKET, SUPPORT, CEILING BRACKET, SUPPORT, FLOOR |