FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Up for re-bid: ends 2026-12-31. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
74 actions since 2022-10-21. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-02 | 424 | Funding only | $3.00M | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2026-08-21 | 423 | Funding only | -$4.25M | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2026-08-21 | 422 | Supplemental agreement (work within scope) | $0 | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2026-08-18 | 421 | Supplemental agreement (work within scope) | $0 | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2026-06-30 | 420 | Administrative change | $0 | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2026-06-15 | 419 | Administrative change | $0 | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2026-05-27 | 418 | Funding only | $5.00M | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2026-05-07 | 417 | Supplemental agreement (work within scope) | $0 | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2026-04-30 | 416 | Supplemental agreement (work within scope) | $0 | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2026-04-27 | 415 | Funding only | $5.00M | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2026-03-26 | 414 | Funding only | $2.00M | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2026-02-24 | 413 | Funding only | $600.0K | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2026-01-15 | 412 | Funding only | $1.20M | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2025-11-24 | 411 | Funding only | $4.60M | SPACE LAUNCH SYSTEM (SLS) BOOSTER |
| 2025-11-10 | 410 | Funding only | $125.5K | SPACE LAUNCH SYSTEM (SLS) BOOSTER - INCREMENTAL FUNDING |
| 2025-10-31 | 409 | Funding only | $1.20M | SPACE LAUNCH SYSTEM (SLS) BOOSTER - INCREMENTAL FUNDING |
| 2025-10-31 | 408 | Supplemental agreement (work within scope) | $0 | SPACE LAUNCH SYSTEM (SLS) BOOSTER - ARTEMIS II AMERICA 250 LOGO. |
| 2025-09-30 | 407 | Change order | $0 | SPACE LAUNCH SYSTEM (SLS) BOOSTER - BUDGET TO BUDGET TRANSFER OF ARTEMIS II AND III - FLIGHT SUPPORT FROM NNM07AA75C TO 80MSFC20D0008. |
| 2025-09-18 | 406 | Administrative change | $0 | SPACE LAUNCH SYSTEM (SLS) BOOSTER - IN-SCOPE ADMINISTRATIVE UPDATE TO FUND THROUGH DATE. |
| 2025-09-03 | 405 | Funding only | $3.00M | SPACE LAUNCH SYSTEM (SLS) BOOSTER - INCREMENTAL FUNDING MODIFICATION. |
| 2025-08-28 | 404 | Supplemental agreement (work within scope) | $0 | THE PURPOSE OF THIS IN-SCOPE MODIFICATION IS TO INCORPORATE OVERRUN COSTS ASSOCIATED WITH CLIN 0007 - TASK ORDER 53 AND CLIN 0010. |
| 2025-07-29 | 403 | Change order | $0 | THIS IN-SCOPE MODIFICATION INCORPORATES APU REQUIREMENT AND UPDATES FUND-THROUGH DATE AND B.7 LANGUAGE. |
| 2025-07-10 | 402 | Change order | $0 | THIS IN-SCOPE MODIFICATION EQUITABLY ADJUSTS THE CONTRACT FOR THE INSURANCE PAYMENTS MADE FOR THE SLS PROGRAM. |
| 2025-06-12 | 401 | Funding only | $3.50M | THIS IN-SCOPE MODIFICATION ADDS ADDITIONAL INCREMENTAL FUNDING. |
| 2025-05-21 | 400 | Administrative change | $0 | KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) |
| 2025-04-21 | 399 | Change order | $0 | KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) |
| 2025-04-16 | 398 | Supplemental agreement (work within scope) | $0 | KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) |
| 2025-04-01 | 397 | Funding only | $1.90M | KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) |
| 2025-03-28 | 396 | Change order | $0 | KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) |
| 2025-03-24 | 395 | Supplemental agreement (work within scope) | $0 | KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) |
| 2025-03-14 | 394 | Supplemental agreement (work within scope) | $0 | KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) |
| 2025-03-10 | 393 | Supplemental agreement (work within scope) | $0 | KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) |
| 2025-03-03 | 392 | Supplemental agreement (work within scope) | $0 | KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) |
| 2025-02-27 | 391 | Supplemental agreement (work within scope) | $0 | KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2025-02-20 | 390 | Funding only | $1.00M | KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-12-31 | 389 | Supplemental agreement (work within scope) | $0 | KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-12-19 | 388 | Change order | $0 | KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-12-17 | 387 | Funding only | $4.00M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-12-16 | 386 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-12-05 | 385 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-10-28 | 384 | Funding only | $4.30M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-10-28 | 383 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-09-20 | 382 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-08-19 | 381 | Funding only | $7.00M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-08-12 | 380 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-07-03 | 379 | Administrative change | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-04-19 | 378 | Funding only | $30.00M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-04-18 | 377 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-03-12 | 376 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-03-08 | 375 | Funding only | $7.50M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-02-13 | 374 | Funding only | $10.00M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2024-01-25 | 373 | Funding only | $4.03M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-12-13 | 372 | Funding only | $14.88M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-11-21 | 371 | Administrative change | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-10-25 | 370 | Supplemental agreement (work within scope) | $10.00M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-10-03 | 369 | Administrative change | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-10-03 | 368 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-09-30 | 367 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-09-27 | 366 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-09-08 | 365 | Funding only | $16.93M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-09-07 | 364 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-08-30 | 363 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-07-26 | 362 | Administrative change | $144.7K | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-07-11 | 361 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-06-01 | 360 | Funding only | $25.18M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-05-01 | 359 | Administrative change | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-04-03 | 358 | Administrative change | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-03-22 | 357 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-02-21 | 356 | Funding only | $43.00M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-02-06 | 355 | Administrative change | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2023-01-23 | 354 | Funding only | $6.90M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2022-12-19 | 353 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2022-10-21 | 352 | Supplemental agreement (work within scope) | $0 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |
| 2022-10-21 | 351 | Administrative change | $32.52M | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)... |