DESIGN-BID-BUILD CONSTRUCTION SERVICES FOR THE ATHENS COMPOUND MAJOR REHAB IN GREECE.IGF::OT::IGF
Up for re-bid: ends 2026-12-31. Recompete brief → · Tegucigalpa Office Setup ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
19 actions since 2022-12-20. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-17 | P00041 | Change order | $191.1K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN THE FOLLOWING: RFP 145 FOR UPS ROOM AT LOWER-LEVEL CHANGE. |
| 2026-09-10 | P00040 | Change order | $241.4K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN THE FOLLOWING: RFP 150 FOR WEST TUNNEL UPGRADE. |
| 2026-08-24 | P00039 | Change order | $7.03M | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN THE FOLLOWING: RFP 131 FOR EXISTING GAS PIPE REPLACEMENT AND 148 FOR FIRE LIVE SAFETY SYSTEMS CHANGES. |
| 2026-06-02 | P00038 | Change order | $151.8K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN THE FOLLOWING: RFP 131 FOR EXISTING GAS PIPE REPLACEMENT AND 148 FOR FIRE LIVE SAFETY SYSTEMS CHANGES. |
| 2026-04-08 | P00037 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADMINISTRATIVELY CHANGE THE INVOICING PROCEDURES TO ALLOW FOR THE CONTRACTOR TO SUBMIT INVOICES VIA THE IPP SYSTEM. THIS MODIFICATION DOES NOT CHANGE THE CONTRACT COMPLETION DATE. |
| 2026-02-24 | P00036 | Change order | $320.2K | THIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN RFPS FOR RELOCATING LIGHT FIXTURES, ADDITIONAL DUCT RISERS, TECHNICAL EQUIPMENT, AND WATER LINES. |
| 2026-01-15 | P00035 | Change order | $30.6K | THIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN RFP 137 FOR FIBER OPTIC CABLE INSTALLATION. |
| 2025-12-19 | P00034 | Change order | $5.50M | THIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN RFP 129 AND EXTEND THE PERIOD OF PERFORMANCE TO MARCH 21, 2026. |
| 2025-11-14 | P00033 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADMINISTRATIVELY CHANGE THE INVOICING PROCEDURES TO ALLOW FOR THE CONTRACTOR TO SUBMIT INVOICES VIA THE IPP SYSTEM. THIS MODIFICATION DOES NOT CHANGE THE CONTRACT COMPLETION DATE. |
| 2025-07-21 | P00032 | Change order | $0 | THIS MODIFICATION IS WRITTEN TO CHANGE THE DELEGATED COR TO JORGE VAZQUEZ AND EXTEND THE PERIOD OF PERFORMANCE TO OCTOBER 4, 2025. |
| 2025-06-13 | P00031 | Change order | $491.8K | THIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN THE FOLLOWING: RFPS FOR INSPECTION AND CLEANING OF TWO TANKS FOR EMBASSY BACKUP GENERATOR, INSTALLATION OF 53MM CONDUITS ON ROOF, AND TELECOM ROOM |
| 2025-05-12 | P00030 | Change order | $147.8K | THIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN THE FOLLOWING: RFPS FOR INSPECTION AND CLEANING OF TWO TANKS FOR EMBASSY BACKUP GENERATOR, INSTALLATION OF 53MM CONDUITS ON ROOF, AND TELECOM ROOM |
| 2025-03-24 | P00029 | Change order | $0 | THIS MODIFICATION IS WRITTEN TO EXTEND THE PERIOD OF PERFORMANCE BY 120 DAYS FROM MARCH 16, 2025 TO JULY 14, 2025. ALL TERMS AND CONDITIONS REMAIN UNCHANGED. |
| 2024-12-03 | P00028 | Change order | $243.8K | THIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN THE FOLLOWING: RFPS FOR STEEL COVER FOR ELECTRICAL DUCT BANK, UNDER SLAB SANITARY LINE REPLACEMENT, AND FRENCH DRAIN UNDER BASEMENT SLAB. |
| 2024-05-14 | P00027 | Change order | $299.7K | THIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN THE FOLLOWING: RFPS FOR WATERPROOFING WORKS, RELOCATION OF WALL MOUNTED PHONE, WEST TUNNEL STRUCTURE DEMO, AND CHANGES TO FEBR DOOR. |
| 2024-01-17 | P00026 | Change order | $295.3K | THIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN THE FOLLOWING: RFPS 110, 111, AND 114 - 117. |
| 2023-09-20 | P00025 | Change order | $1.60M | THIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN THE FOLLOWING: RFPS 85, 89, 90 THROUGH 102, AND 104 THROUGH 109. |
| 2023-03-31 | P00024 | Administrative change | $0 | ATHENS MAJOR REHAB. THIS MODIFICATION IS WRITTEN TO INCORPORATE THE GUIDE TO INTERNET COLLABORATION SYSTEMS AS J.1.15 AND REVISE SECTIONS E AND H TO UTILIZE OTHER GOVERNMENT-PROVIDED/APPROVED SBU SYSTEMS IN ADDITION TO PROJNET. |
| 2022-12-20 | P00023 | Change order | $50.9K | ATHENS MAJOR REHAB. THIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN THE FOLLOWING: RFPS RFPS 82 THROUGH 84 AND 86 THROUGH 88. |