Gulf Coast Electric Cooperative Inc received this contract from Dla Energy, Defense Logistics Agency: $52.20M obligated so far for utilities- electric. It runs to 2061-05-31.
Key facts · data as of Oct 22, 2026
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 22, 2026.
Cite this page: SpendQuery, Award SP060010C8253, data as of Oct 22, 2026, https://spendquery.com/award?id=CONT_AWD_SP060010C8253_9700_-NONE-_-NONE-
Gulf Coast Electric Cooperative Inc: all federal awards · Department of Defense: spending · Dla Energy: what it buys
PRIVATIZATION OF THE ELECTRIC AND WATER UTILITY DISTRIBUTION SYSTEM ON TYNDALL AIR FORCE BASE, FL
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
86 actions since 2022-10-14. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-22 | P00232 | Supplemental agreement (work within scope) | $0 | THIS MODIFICATION INCORPORATES FAR 52.222-90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APRIL 2026), INTO THE CONTRACT. |
| 2026-06-15 | P00231 | Supplemental agreement (work within scope) | $919.1K | THIS MODIFICATION AWARDS CHANGE ORDERS 11, 16, 19, 22, 25, AND 26 FOR PROJECT XLWU203050, ZONE 4 INFRASTRUCTURE PHASE 2. |
| 2026-06-10 | P00230 | Administrative change | $0 | THIS MODIFICATION UPDATES THE WAGE DETERMINATIONS FOR CONTRACT YEAR 16. |
| 2026-05-26 | P00229 | Supplemental agreement (work within scope) | $372.5K | THIS MODIFICATION AWARDS CHANGE ORDER #1 FOR PROJECT XLWU203041, AIRCRAFT PARKING APRON. |
| 2026-05-26 | P00228 | Supplemental agreement (work within scope) | $237.1K | THIS MODIFICATION AWARDS CHANGE ORDERS 14, 18, AND 21 FOR PROJECT XLWU203045, ZONE 4 INFRASTRUCTURE - PHASE 1. |
| 2026-05-18 | P00227 | Supplemental agreement (work within scope) | -$2.12M | THIS MODIFICATION PROVIDES AN EQUITABLE ADJUSTMENT FOR COSTS TO REPLACE EXISTING CONDUIT AND SWITCHGEAR IN PERFORMANCE OF PROJECT XLWU203045, ZONE 4 INFRASTRUCTURE PHASE 1. |
| 2026-04-13 | P00226 | Supplemental agreement (work within scope) | $0 | THIS MODIFICATION REVERTS THE MATERIAL SUBCLIN PRICES TO THEIR PRIOR VALUE AS INVOICED AND PAID IN ACCORDANCE WITH MODIFICATION P00154 AND APPLIES PRICE REDUCTIONS TO THE CORRESPONDING LABOR SUBCLINS. |
| 2026-03-23 | P00225 | Supplemental agreement (work within scope) | $888.4K | THIS MODIFICATION AWARDS CHANGE ORDER #2 FOR PROJECT XLWU203048, F-35 MUNITIONS STORAGE. |
| 2026-03-19 | P00224 | Supplemental agreement (work within scope) |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-22). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
| $10.55M |
| THIS MODIFICATION AWARDS AN EQUITABLE ADJUSTMENT ASSOCIATED WITH PROJECT XLWU203050, ZONE 4 INFRASTRUCTURE - PHASE 2. |
| 2026-02-10 | P00223 | Supplemental agreement (work within scope) | $20.2K | THIS MODIFICATION AWARDS CHANGE ORDER #1 FOR PROJECT XLWU203005, TYNDALL CHAPEL. |
| 2026-01-05 | P00222 | Administrative change | $0 | THIS MODIFICATION UPDATES CONTRACT SECTION G.2 TO UPDATE THE SERVICE ACCEPTOR DEPARTMENT OF DEFENSE ACTIVITY ADDRESS CODE AUTHORIZED FOR THE CONTRACT. |
| 2025-12-08 | P00221 | Supplemental agreement (work within scope) | $422.8K | THIS MODIFICATION AWARDS CHANGE ORDER #6 FOR PROJECT XLWU203028, LODGING FACILITIES. |
| 2025-11-18 | P00220 | Funding only | $5.86M | THIS MODIFICATION FUNDS THE FISCAL YEAR 2026 UTILITY SERVICE CHARGE. |
| 2025-11-03 | P00219 | Supplemental agreement (work within scope) | $104.9K | THIS MODIFICATION AWARDS CHANGE ORDERS #12 AND #17 FOR PROJECT XLWU203050, ZONE 4 INFRASTRUCTURE - PHASE 2. |
| 2025-10-27 | P00218 | Supplemental agreement (work within scope) | $105.5K | THIS MODIFICATION AWARDS CHANGE ORDER #3 FOR PROJECT XLWU203012, OSS RAPCON, AND CHANGE ORDER #2 FOR PROJECT XLWU203047, AGE FACILITY. |
| 2025-09-17 | P00217 | Supplemental agreement (work within scope) | $68.3K | THIS MODIFICATION AWARDS PROJECT TEW-25-001, CONDUIT INSTALLATION. |
| 2025-09-17 | P00216 | Supplemental agreement (work within scope) | $240.5K | THIS MODIFICATION REVISES THE SCOPE OF WORK FOR PROJECT XLWU203041, AIRCRAFT PARKING APRON. |
| 2025-09-16 | P00215 | Supplemental agreement (work within scope) | -$595 | THIS MODIFICATION REVISES THE SCOPE OF WORK FOR PROJECT XLWU203034, SILVER FLAG FACILITIES. |
| 2025-09-03 | P00214 | Supplemental agreement (work within scope) | $85.9K | THIS MODIFICATION INCORPORATES THE ECONOMIC PRICE ADJUSTMENT FOR CONTRACT YEAR 15. |
| 2025-09-02 | P00213 | Supplemental agreement (work within scope) | $3.87M | THIS MODIFICATION AWARDS CHANGE ORDERS #7 AND #15 FOR PROJECT XLWU203045, ZONE 4 INFRASTRUCTURE - PHASE 1. |
| 2025-08-20 | P00212 | Supplemental agreement (work within scope) | -$27.3K | THIS MODIFICATION AWARDS CHANGE ORDER #3 FOR PROJECT XLWU203004, DORMITORY COMPLEX. |
| 2025-08-12 | P00211 | Supplemental agreement (work within scope) | $553.5K | THIS MODIFICATION AWARDS CHANGE ORDERS #3 AND #4 FOR THE CE COMPLEX PROJECT. |
| 2025-08-06 | P00210 | Administrative change | $0 | THIS MODIFICATION UPDATES THE WAGE DETERMINATIONS FOR CONTRACT YEAR 15. |
| 2025-07-31 | P00209 | Supplemental agreement (work within scope) | $38.2K | THIS MODIFICATION AWARDS CHANGE ORDER #3 FOR THE MSA FACILITIES PROJECT. |
| 2025-07-31 | P00208 | Supplemental agreement (work within scope) | $283.6K | THIS MODIFICATION AWARDS CHANGE ORDER #13 FOR THE ZONE 4 INFRASTRUCTURE PROJECT AND CHANGE ORDER #2 FOR THE OSS RAPCON PROJECT. |
| 2025-07-29 | P00207 | Supplemental agreement (work within scope) | $367.9K | THIS MODIFICATION AWARDS CHANGE ORDER #3 TO PROJECT XLWU203021, LRS COMPLEX. |
| 2025-07-16 | P00206 | Administrative change | $0 | THIS MODIFICATION REMOVES FAR CLAUSES 52.222-21, PROHIBITION OF SEGREGATED FACILITIES, 52.222-24, PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATION, AND 52.222-26, EQUAL OPPORTUNITY AND UPDATES FAR CLAUSE 52.244-6, SUBCONTRACTS FOR COMMERCIAL ITEMS,… |
| 2025-07-16 | P00205 | Supplemental agreement (work within scope) | $2.11M | THIS MODIFICATION AWARDS CHANGE ORDER #1 FOR THE SPORTS COMPLEX AND POOL PROJECT. |
| 2025-06-25 | P00204 | Administrative change | $0 | THIS MODIFICATION REVISES THE CONTRACT'S PAY OFFICE DODAAC AND REVISES DFARS 252.232-7006, WIDE AREA WORKFLOW PAYMENT. |
| 2025-04-08 | P00203 | Supplemental agreement (work within scope) | -$66.6K | THIS MODIFICATION PROVIDES THE GOVERNMENT WITH A CREDIT FOR DEWATERING THAT WAS NOT NECESSARY IN PERFORMANCE OF MILITARY CONSTRUCTION (MILCON) PROJECT XLWU203002. |
| 2025-02-05 | P00202 | Supplemental agreement (work within scope) | $32.4K | THIS MODIFICATION AWARDS CHANGE ORDER #1 TO THE F-35 MUNITIONS STORAGE PROJECT. |
| 2024-12-19 | P00201 | Supplemental agreement (work within scope) | $31.2K | THIS MODIFICATION AWARDS CHANGE ORDER #2 TO THE LRS COMPLEX PROJECT. |
| 2024-11-08 | P00200 | Funding only | $5.78M | THIS MODIFICATION OBLIGATES FUNDING FOR THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2025. |
| 2024-10-15 | P00199 | Administrative change | $0 | THIS MODIFICATION INCORPORATES UPDATES TO DFARS CLAUSES 252.204-7012 AND 252.204-7020. |
| 2024-09-26 | P00198 | Supplemental agreement (work within scope) | $402.8K | THIS MODIFICATION AWARDS CHANGE ORDER #1 TO PROJECT XLWU203008, WEG COMPLEX. |
| 2024-09-19 | P00197 | Supplemental agreement (work within scope) | $37.2K | THIS MODIFICATION AWARDS CHANGE ORDER #2 TO PROJECT XLWU203036, FIRE STATION #4. |
| 2024-09-19 | P00196 | Supplemental agreement (work within scope) | $578.5K | THIS MODIFICATION AWARDS CHANGE ORDERS #2 AND #5 TO PROJECT XLWU203045, ZONE 4 INFRASTRUCTURE. |
| 2024-09-17 | P00195 | Supplemental agreement (work within scope) | $169.3K | THIS MODIFICATION INCORPORATES AN ECONOMIC PRICE ADJUSTMENT FOR CONTRACT YEAR 14. |
| 2024-09-16 | P00194 | Supplemental agreement (work within scope) | -$837.1K | THIS MODIFICATION AWARDS CHNAGE ORDER #4 TO PROJECT XLWU203045, ZONE 4 INFRASTRUCTURE. |
| 2024-08-16 | P00193 | Supplemental agreement (work within scope) | $33.7K | THIS MODIFICATION AWARDS PROJECT TEW-24-003. |
| 2024-07-23 | P00192 | Supplemental agreement (work within scope) | $169.3K | THIS MODIFICATION AWARDS A CHANGE ORDER TO CLIN 1212, UTILITY CONNECTION XLWU203002, CE MAINTENANCE AREA. |
| 2024-07-02 | P00191 | Administrative change | $0 | THIS MODIFICATION UPDATES THE DEPARTMENT OF LABOR'S WAGE DETERMINATIONS FOR CONTRACT YEAR 14. |
| 2024-06-18 | P00190 | Supplemental agreement (work within scope) | $180.5K | TO ESTABLISH AND FUND SUBCLINS 1226FA AND 1226FB FOR THE CHANGE ORDERS #9 AND #10 ON PTOJECT XLWU203050, ZONE 4 INFRASTRUCTURE - PHASE 2 PROJECT. |
| 2024-06-04 | P00189 | Administrative change | $0 | THIS ADMINISTRATIVE MODIFICATION REVISES THE LINE OF ACCOUNTING FOR ACRN GN. |
| 2024-06-03 | P00188 | Supplemental agreement (work within scope) | $330.5K | THIS MODIFICATION REVISES SUBCLIN 1205AM FOR THE CHANGE ORDER#2 OF PROJECT XLWU203011, MUNITIONS STORAGE FACILITY. |
| 2024-05-16 | P00187 | Administrative change | $0 | THIS MODIFICATION CORRECTS TYPOGRAPHICAL ERRORS CONTAINED IN P00186. |
| 2024-04-25 | P00186 | Supplemental agreement (work within scope) | $47.0K | THIS MODIFICATION AWARDS A CHANGE ORDER TO PROJECT XLWU203050 FOR THE INSTALLATION OF LAYDOWN SPACE. |
| 2024-04-25 | P00185 | Supplemental agreement (work within scope) | -$907.7K | THIS MODIFICATION AWARDS CHANGE ORDERS #6 AND #8 TO THE ZONE 4 INFRASTRUCTURE PROJECT. |
| 2024-03-19 | P00184 | Supplemental agreement (work within scope) | $106.9K | THIS MODIFICATION AWARDS A CHANGE ORDER TO THE ZONE 4 INFRASTRUCTURE PROJECT. |
| 2024-03-08 | P00183 | Supplemental agreement (work within scope) | $212.0K | THIS MODIFICATION AWARDS A PROJECTS TEW-23-009 AND TEW-24-001. |
| 2024-03-07 | P00182 | Supplemental agreement (work within scope) | $135.2K | THIS MODIFICATION AWARDS A CHANGE ORDER FOR AN ADDITIONAL ELECTRIC UTILITY SERVICE CONNECTION UNDER PROJECT CLIN 1115 UTILITY CONNECTION XLWU203034, SILVER FLAG FACILITIES. |
| 2024-02-26 | P00181 | Supplemental agreement (work within scope) | $78.4K | THIS MODIFICATION AWARDS CHANGE ORDERS TO THE FIRE STATION #4 AND COMMUNITY COMMONS FACILITY PROJECTS. |
| 2024-02-22 | P00180 | Supplemental agreement (work within scope) | $24.3K | THIS MODIFICATION AWARDS CHANGE ORDERS TO THE FIRE TRUCK MHE AND CE COMPLEX PROJECTS. |
| 2024-02-08 | P00179 | Supplemental agreement (work within scope) | $0 | THIS MODIFICATION CORRECTS AN ERROR IN P00177, WHICH EFFECTED CHANGE ORDERS AND DEOBLIGATED EXCESS FUNDS FROM THE CONTRACT. THIS MODIFICATION CORRECTS WHICH PARTICULAR SUBCLINS THE FOR WHICH FUNDS SHOULD HAVE BEEN DEOBLIGATED. |
| 2024-01-17 | P00178 | Supplemental agreement (work within scope) | $63.8K | THIS MODIFICATION AWARDS CHANGE ORDERS TO THE CE COMPLEX, LRS COMPLEX, EMERGENCY OPERATIONS CENTER (EOC), AND OSS-RAPCON PROJECTS. |
| 2024-01-11 | P00177 | Supplemental agreement (work within scope) | -$64.5K | THIS MODIFICATION AWARDS CHANGE ORDERS TO THE AGE FACILITY, F-35 MXS COMPLEX, AND CORROSION CONTROLS FACILITY PROJECTS. |
| 2023-12-12 | P00176 | Administrative change | $0 | THIS MODIFICATION UPDATES THE LINES OF ACCOUNTING FOR FY24 FUNDING THAT WERE PREVIOUSLY ESTABLISHED IN P00169. |
| 2023-12-01 | P00175 | Supplemental agreement (work within scope) | $370.0K | THIS MODIFICATION REVISES CONTRACT LINE ITEM NUMBER (CLIN) 1228 TO ESTABLISH AND FUND SUBCLIN 1228AF, AUTHORIZING GULF COAST ELECTRIC COOPERATIVE, INC. (GCEC) TO COMPLETE A REVISED REQUIREMENT FOR A UTILITY SERVICE CONNECTION ASSOCIATED WITH MILITARY… |
| 2023-11-27 | P00174 | Supplemental agreement (work within scope) | $77.9K | THIS MODIFICATION REVISES SUB-CONTRACT LINE ITEM NUMBER (CLIN) 1205AF, AUTHORIZING GULF COAST ELECTRIC COOPERATIVE, INC. (GCEC) TO COMPLETE A REVISED REQUIREMENT FOR A UTILITY SERVICE CONNECTION ASSOCIATED WITH MILITARY CONSTRUCTION (MILCON) PROJECT… |
| 2023-11-17 | P00173 | Administrative change | $0 | THIS MODIFICATION CORRECTS AN ERROR IN THE LINE OF ACCOUNTING FOR ACRN GN IN MODIFICATION P00171 AND P00172. |
| 2023-11-14 | P00172 | Administrative change | $0 | THIS MODIFICATION CORRECTS AN ERROR IN THE LINE OF ACCOUNTING FOR ACRN GN IN MODIFICATION P00172. |
| 2023-11-13 | P00171 | Supplemental agreement (work within scope) | $274.6K | TO ESTABLISH AND FUND SUBCLINS 1312AE-1312AG, AUTHORIZING GCEC TO COMPLETE THREE ADDITIONAL ELECTRIC UTILITY SERVICE REQUIREMENTS ASSOCIATED WITH PROJECT TEW-23-006, ELECTRIC VEHICLE CHARGING FACILITY (EVCF) |
| 2023-11-13 | P00170 | Supplemental agreement (work within scope) | $561.8K | TO ESTABLISH ASSOCIATED SUBCLIN 1226EX, FOR AN ADDITIONAL UTILITY SERVICE CONNECTION FOR MILITARY CONSTRUCTION (MILCON) PROJECT XLWU203045, ZONE 4 INFRASTRUCTURE. |
| 2023-10-31 | P00169 | Funding only | $5.41M | TO FUND THE FIXED MONTHLY CHARGES FOR CONTRACT YEAR (CY)13 MONTHS 149-15 AND CY14 MONTHS 157 -160 - 12 MONTHS. |
| 2023-10-31 | P00168 | Supplemental agreement (work within scope) | $385.2K | TO ESTABLISH SUBCLIN 1111AF TO FUND PROJECT XLWU203046 COMMERCIAL GATE COMPLEX CHANGE ORDER 1 HIGHWAY 98 LIGHTING |
| 2023-09-27 | P00167 | Supplemental agreement (work within scope) | $370.1K | TO ESTABLISH CLIN 1312, TEW 23-006, ELECTRIC VEHICLE CHARGING FACILITY, AND ASSOCIATED SUBCLINS 1312AA-AD. |
| 2023-09-27 | P00166 | Supplemental agreement (work within scope) | $4.44M | TO ESTABLISH CLIN 1311, TEW 23-008, LAYDOWN AREAS - SITES G&I, AND ASSOCIATED SUBCLINS 1311AA-AE. |
| 2023-09-07 | P00165 | Supplemental agreement (work within scope) | $105.5K | THIS MODIFICATION ADJUSTS THE UTILITY SERVICE CHARGE FOR CY13 EFFECTIVE JUNE 1, 2023, AND UPDATED THE CONTRACT'S INSPECTION AND LINE LOCATE RATES. |
| 2023-08-22 | P00164 | Supplemental agreement (work within scope) | $132.1K | TO ESTABLISH AND FUND CLINS 1308, 1309, 1310 AND SUBCLINS 1310AA - 1310AD. |
| 2023-07-31 | P00163 | Supplemental agreement (work within scope) | -$37.6K | TO REMOVE SUBCLIN 1307AM AND DE-OBLIGATE FUNDS FROM ACRN GD. |
| 2023-07-21 | P00162 | Administrative change | $0 | THIS MODIFICATION UPDATES THE DEPARTMENT OF LABOR'S WAGE DETERMINATIONS FOR CONTRACT YEAR 13. |
| 2023-07-03 | P00161 | Supplemental agreement (work within scope) | $1.53M | TO ESTABLISH CLIN 1307 AND FUND PROJECT XLWU203048, F-35 MUNITIONS STORAGE. |
| 2023-06-29 | P00160 | Administrative change | $0 | TO INCORPORATE FAR CLAUSE 52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023). |
| 2023-06-27 | P00159 | Supplemental agreement (work within scope) | -$25.0K | TO REVISE THE SCOPE OF WORK FOR PROJECT TEW-19-023, FIRE FLOW TO BUIDING 290 WATER MAIN EXTENSION DE-OBLIGATE FUNDS FROM ACRN CS. |
| 2023-06-22 | P00158 | Supplemental agreement (work within scope) | $35.9K | TO AWARD PROJECTS TEW-23-001, AMMO RD REDUCED PRESSURE ZONE (RPZ) BACKFLOW AND TEW-23-002, BLDG. 36175 MODULAR RELOCATION. |
| 2023-02-17 | P00157 | Administrative change | $0 | P00157 CORRECTS PARAGRAPH A OF P00153 AND REPLACES FAR 52.222-44 WITH FAR 52.222-43. |
| 2023-02-16 | P00156 | Supplemental agreement (work within scope) | $3.1K | P00156 APPROVES AND FUNDS AN EQUITABLE ADJUSTMENT FOR ADDITIONAL COST INCURRED TO TAP INTO A BAY COUNTY WATER LINE AT TYNDALL AFB. |
| 2023-02-07 | P00155 | Supplemental agreement (work within scope) | $46.4K | THIS MODIFICATION REVISES CLIN 1102 TO ESTABLISH ASSOCIATED SUBCLIN 1102AL, FOR AN ADDITIONAL UTILITY SERVICE CONNECTION FOR MILITARY CONSTRUCTION (MILCON) PROJECT XLWU203028, LODGING FACILITIES |
| 2023-02-07 | P00154 | Supplemental agreement (work within scope) | -$1.21M | DUE TO A COST SAVING MATERIAL CHANGE, THIS MODIFICATION REVISES THE TOTALS AND REORGANIZES THE PREVIOUSLY ESTABLISHED CLINS 1225 AND 1226 ON THE MODIFICATION P00134 TO REDUCE FUNDING FOR THE REQUIRED ELECTRIC AND WATER SERVICE CONNECTIONS ASSOCIATED WITH… |
| 2022-12-14 | P00153 | Supplemental agreement (work within scope) | $0 | TO REVISE ASSOCIATED SUBCLINS UNDER CLINS 1213-1224 FOR THE TWELVE ZONE 1 INFRASTRUCTURE PROJECTS, TO FURTHER BREAKDOWN THE LINE ITEMS TO ACCOMMODATE MATERIAL ALLOWANCES, AND TO ALLOW FOR THE CONTRIBUTION OF FUNDS TO GULF COAST ELECTRIC COOPERATIVE, INC. |
| 2022-11-30 | P00152 | Supplemental agreement (work within scope) | $21.1K | TO AUTHORIZE AND FUND A CHANGE ORDER FOR PROJECT XLWU203028, LODGING FACILITIES. |
| 2022-11-09 | P00151 | Supplemental agreement (work within scope) | $3.04M | TO FUND AUTHORIZE AND FUND PROJECTS XLWU203002, CE COMPLEX AND XLWU203021, LRS COMPLEX. |
| 2022-11-08 | P00150 | Supplemental agreement (work within scope) | $174.5K | TO FUND CHANGE ORDERS 1, 2 AND 3 OF THE PROJECT XLWU203028, LODGING FACILITIES. |
| 2022-10-31 | P00149 | Funding only | $4.97M | TO PROVIDE FUNDING FOR THE FIXED MONTHLY CHARGES FOR 12 MONTHS (OCTOBER 1, 2022 - SEPTEMBER 30, 2023). |
| 2022-10-14 | P00148 | Supplemental agreement (work within scope) | $13.4K | THIS MODIFICATION ESTABLISHES AND FUNDS SUBCLINS 11203AM AND 1203AN FOR ADDED SCOPE TO PROJECT XLWU203004, DORMITORY COMPLEX. |
| 2022-10-14 | P00147 | Supplemental agreement (work within scope) | $9.3K | THIS MODIFICATION INCREASES FUNDING ON SUBCLIN 1115AE FOR ADDED SCOPE TO PROJECT XLWU203034, SILVER FLAG FACILITIES. |