IGF::OT::IGF THIS CONTRACT IS AWARDED FOR THE OWNERSHIP, OPERATION AND MAINTENANCE OF THE WATER AND WASTEWATER UTILITY SYSTEMS AT FORT RILEY, KANSAS.
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
17 subawards totaling $1.14M (1.4% of what was obligated), as Fort Riley Utility Services, Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Cogent, Inc. | $420.7K | 1 | MO | 2024-04-17 | 2024-04-17 |
| Walters Morgan Construction Inc | $309.0K | 1 | KS | 2024-01-03 | 2024-01-03 |
| Fit Excavating Inc | $270.0K | 3 | KS | 2023-09-17 | 2025-01-06 |
| KLM Engineering Inc | $122.0K | 1 | MN | 2025-04-15 | 2025-04-15 |
| Ace Pipe Cleaning, Inc. | $104.3K | 1 | MO | 2024-04-16 | 2024-04-16 |
| Bayer Construction Company, Inc. | $50.3K | 1 | KS | 2024-10-01 | 2024-10-01 |
| Smith & Loveless, Inc | $50.0K | 1 | KS | 2024-07-18 | 2024-07-18 |
| Mississippi Lime Company | $50.0K | 1 | MO | 2024-09-16 | 2024-09-16 |
| Cat Cans Portable Services of Manhattan LLC | $45.0K | 1 | KS | 2024-01-16 | 2024-01-16 |
| Olgoonik Enterprises, LLC | $38.5K | 1 | CO | 2024-02-14 | 2024-02-14 |
| Onterris Treatment Technologies, Inc. | $33.8K | 1 | ME | 2025-03-31 | 2025-03-31 |
| Kaw Valley Engineering Inc | $30.8K | 1 | KS | 2022-11-08 | 2022-11-08 |
| Lee Byong S | $30.0K | 1 | KS | 2023-10-02 | 2023-10-02 |
| Sak Construction LLC | -$410.6K | 2 | MO | 2022-12-27 | 2023-01-17 |
| Date | To | Amount | For |
|---|---|---|---|
| 2024-04-17 | Cogent, Inc. | $420.7K | QTY 3 FLYGT 6" NP3315 HT-457 SUBMERSIBLE PUMPS W/ACCESSORIES |
| 2024-01-03 | Walters Morgan Construction Inc | $309.0K | CLARIFIER DRIVE REBUILD FOR THE WTP |
| 2025-04-15 | KLM Engineering Inc | $122.0K | CONSULTING AND INSPECTION SERVICES DURING THE REHABILITATION OF TWO TANKS |
| 2023-09-17 | Fit Excavating Inc | $113.8K | AREA REVENUE METERS INSTALLATION |
| 2023-09-17 | Fit Excavating Inc | $113.8K | AREA REVENUE METERS INSTALLATION |
| 2024-04-16 | Ace Pipe Cleaning, Inc. | $104.3K | SEWER MAINTENANCE & TRENCHLESS REHABILITATION |
| 2024-10-01 | Bayer Construction Company, Inc. | $50.3K | ASPHALT PAVING |
| 2024-07-18 | Smith & Loveless, Inc | $50.0K | PURCHASE PUMPS AND CONTROL PANEL |
| 2024-09-16 | Mississippi Lime Company | $50.0K | QUICK LIME PURCHASE |
| 2024-01-16 | Cat Cans Portable Services of Manhattan, LLC | $45.0K | PURCHASE OWS-CAT CANS 2024 |
| 2025-01-06 | Fit Excavating Inc | $42.3K | REPLACE AND REPAIR SERVICE LINES |
| 2024-02-14 | Olgoonik Enterprises, LLC | $38.5K | PARTS FOR UV SYSTEM AT WASTEWATER TREATMENT PLANT |
| 2025-03-31 | Onterris Treatment Technologies, Inc. | $33.8K | PERFORM ONSITE JAR TESTING TO EVALUATE THE EFFICACY OF CHEMICAL TREATMENT TO REDUCE PHOSPHOROUS IN WW BELOW PERMIT LIMITS. |
| 2022-11-08 | Kaw Valley Engineering Inc | $30.8K | SURVEY WATER LINE ALIGNMENT AND TESTING SERVICES FOR CHTA PHASE 5 |
| 2023-10-02 | Lee Byong S | $30.0K | WTP AND WWTP, WATER DISTRIBUTION AND WASTE WATER COLLECTION SITE MAINTENANCE. |
| 2023-01-17 | Sak Construction LLC | -$25.2K | CHANGE ORDER TO DE-OBLIGATE UNUSED QUANTITIES FOR A NET SUBCONTRACT DECREASE. |
| 2022-12-27 | Sak Construction LLC | -$385.3K | CHANGE ORDER TO TRUE UP QUANTITIES INSTALLED TO REFLECT ACTUAL UTILIZED AND DE-OBLIGATION OF UNUSED PORTION. |
54 actions since 2022-10-14. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-09 | P00118 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE APPLICABLE WAGE DETERMINATIONS UNDER THE DAVIS BACON ACT (DBA) AND SERVICE CONTRACT ACT FOR CONTRACT YEAR 9. |
| 2026-05-28 | P00117 | Funding only | $1.59M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FY2026. |
| 2026-04-30 | P00116 | Funding only | $3.18M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FY2026. |
| 2026-03-12 | P00115 | Funding only | $1.59M | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FY2026. |
| 2026-03-10 | P00114 | Supplemental agreement (work within scope) | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A CHANGE ORDER TO EXTEND THE COMPLETION DATES FOR PROJECTS FRKS-SW-24-001, FRKS-SW-25-002, AND FRKS-SW-25-003. |
| 2026-01-27 | P00113 | Funding only | $1.59M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2026. |
| 2025-12-16 | P00112 | Funding only | $1.59M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2026. |
| 2025-12-11 | P00111 | Supplemental agreement (work within scope) | $0 | THE PURPOSE OF THIS MODIFICATION FOR A CHANGE IN WORK ORDER FOR CLIN 106 |
| 2025-11-21 | P00110 | Funding only | $4.94M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2026. |
| 2025-11-19 | P00109 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE LANGUAGE IN THE CONTRACT SURROUNDING WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS. |
| 2025-09-30 | P00108 | Supplemental agreement (work within scope) | $571.9K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR CAPITAL IMPROVEMENTS OF THE WATER AND WASTEWATER SYSTEMS. |
| 2025-09-22 | P00107 | Funding only | $3.29M | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR AUGUST AND SEPTEMBER OF 2025. |
| 2025-08-11 | P00106 | Supplemental agreement (work within scope) | $1.65M | THE PURPOSE OF THIS MODIFICATION IS TO ADJUST THE MONTHLY UTILITY SERVICE CHARGE (MUSC) DUE TO INVENTORY CHANGES AND TO APPLY AN ECONOMIC PRICE ADJUSTMENT TO THE CURRENT MUSC AND THE THIRD PARTY CONSTRUCTION HOURLY INSPECTION CHARGE RATE. |
| 2025-07-30 | P00105 | Change order | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION I, CONTRACT CLAUSES, IN ACCORDANCE WITH EXECUTIVE ORDERS 14173 AND 14168. |
| 2025-07-07 | P00104 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE APPLICABLE WAGE DETERMINATIONS UNDER THE DAVIS-BACON ACT (DBA) AND SERVICE CONTRACT ACT FOR CONTRACT YEAR 8. |
| 2025-06-27 | P00103 | Funding only | $1.66M | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR JUNE OF 2025. |
| 2025-05-08 | P00102 | Funding only | $1.66M | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR MAY OF 2025. |
| 2025-04-08 | P00101 | Administrative change | $1.66M | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR APRIL OF 2025 AND UPDATES ATTACHMENT JE6. |
| 2025-03-13 | P00100 | Funding only | $1.66M | THIS MODIFICATION FUNDS THE USC AND ISDC FOR FY25. |
| 2024-11-19 | P00098 | Funding only | $3.43M | THIS MODIFICATION FUNDS THE USC AND ISDC FOR FY25. |
| 2024-10-28 | P00097 | Funding only | $1.71M | THIS MODIFICATION FUNDS THE USC AND ISDC FOR FY25. |
| 2024-10-11 | P00096 | Administrative change | $0 | THIS MODIFICATION UPDATES THE CONTRACT WITH CLAUSES DFARS 252.204-7012 AND DFARS 252.204-7020. |
| 2024-09-25 | P00095 | Supplemental agreement (work within scope) | $225.3K | P00095 AUTHORIZES PROJECT FRKS-SW-24-002 . |
| 2024-08-30 | P00094 | Supplemental agreement (work within scope) | $7.40M | P00094 AUTHORIZES PROJECT FRKS-SW-24-001 AND FUNDS THE USC AND ISDC CLINS. |
| 2024-08-07 | P00093 | Supplemental agreement (work within scope) | $39.3K | THE PURPOSE OF THIS MODIFICATION IS TO ADJUST MONTHLY UTILITY SERVICE CHARGE (MUSC) DUE TO INVENTORY CHANGES AND TO APPLY AN ECONOMIC PRICE ADJUSTMENT TO THE CURRENT MUSC AND THE THIRD PARTY CONSTRUCTION HOURLY INSPECTION CHARGE RATE. |
| 2024-07-10 | P00092 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE APPLICABLE WAGE DETERMINATIONS UNDER THE DAVIS-BACON ACT (DBA) AND SERVICE CONTRACT ACT FOR CONTRACT YEAR 7. |
| 2024-06-28 | P00091 | Funding only | $3.35M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024. |
| 2024-05-29 | P00090 | Funding only | $1.67M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024. |
| 2024-04-15 | P00089 | Funding only | $1.67M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024. |
| 2024-03-24 | P00088 | Funding only | $1.90M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024. |
| 2024-02-21 | P00087 | Funding only | $1.63M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024. |
| 2024-01-08 | P00099 | Funding only | $3.32M | THIS MODIFICATION FUNDS THE USC AND ISDC FOR FY25. |
| 2023-12-22 | P00086 | Administrative change | $3.26M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024. |
| 2023-11-29 | P00085 | Funding only | $1.63M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024. |
| 2023-10-18 | P00084 | Funding only | $1.63M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024. |
| 2023-09-20 | P00083 | Supplemental agreement (work within scope) | $1.20M | THE PURPOSE OF THIS MODIFICATION IS TO AWARD AND FUND CAPITAL IMPROVEMENT PROJECTS. |
| 2023-07-26 | P00082 | Supplemental agreement (work within scope) | $257.5K | THIS MODIFICATION APPLIES AN ECONOMIC PRICE ADJUSTMENT TO THE MONTHLY UTILITY SERVICES CHARGE AND THE THIRD PARTY CONSTRUCTION HOURLY INSPECTION CHARGE RATE AND PROVIDES FUNDING TO COVER THREE MONTHS OF THE USC AT THE ADJUSTED RATE FOR FISCAL YEAR 2023. |
| 2023-07-10 | P00081 | Administrative change | $0 | THIS MODIFICATION INCORPORATES THE UPDATED REGISTER OF WAGE DETERMINATION UNDER THE SERVICE CONTRACT ACT WAGE DETERMINATION AND THE GENERAL DECISION FOR CONSTRUCTION WAGE RATES UNDER THE DAVIS-BACON ACT FOR CONTRACT YEAR 6 OF 50. |
| 2023-07-03 | P00080 | Administrative change | $4.63M | THIS MODIFICATION INCORPORATES FAR CLAUSE 52.204-27 AND FUNDS THE UTILITY SERVICE CHARGE FOR W/WW AND ISDCWW 5. |
| 2023-06-08 | P00079 | Change order | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE REQUIREMENT FOR THE SYSTEM OWNER TO SUBMIT AN ANNUAL UTILITY SYSTEM CONDITION ASSESSMENT AND ACCOMPANYING SELF-ATTESTATION. |
| 2023-05-18 | P00078 | Funding only | $3.09M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023. |
| 2023-03-21 | P00077 | Supplemental agreement (work within scope) | $2.8K | THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE FRUS TO PERFORM PFOS AND PFOA SAMPLING/TESTING AT SEVERAL LOCATIONS AT FORT RILEY, KS. |
| 2023-03-20 | P00076 | Supplemental agreement (work within scope) | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE ARMY MONTHLY SYSTEM PERFORMANCE REPORT (MSPR) REQUIREMENT. |
| 2023-02-23 | P00075 | Funding only | $3.09M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023. |
| 2023-02-14 | P00074 | Funding only | $1.54M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023. |
| 2023-02-01 | P00073 | Funding only | $1.54M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023. |
| 2023-01-31 | P00072 | Supplemental agreement (work within scope) | $40.5K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR A SERVICE CONNECTION USING FY21 FUNDS. |
| 2023-01-31 | P00071 | Administrative change | $0 | THE MODIFICATION UPDATES THE REGISTER OF WAGE DETERMINATION UNDER THE SERVICE CONTRACT ACT AND THE GENERAL DECISIONS FOR CONSTRUCTION WAGE RATES UNDER THE DAVIS-BACON ACT. |
| 2022-12-13 | P00070 | Funding only | $1.54M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023. |
| 2022-11-18 | P00069 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT A TYPOGRAPHICAL ERROR IN P00068. |
| 2022-11-11 | P00068 | Funding only | $1.54M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023. |
| 2022-11-09 | P00067 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE AND REPLACE EXHIBIT JE6, SUBCONTRACTING PLAN, TO INCORPORATE THE APPROVED 2023 COMMERCIAL SMALL BUSINESS SUBCONTRACTING PLAN OF AMERICAN STATES UTILITY SERVICES, INC. |
| 2022-10-25 | P00066 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT A TYPOGRAPHICAL ERROR IN P00065. |
| 2022-10-14 | P00065 | Funding only | $1.54M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-20). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗