THIS CONTRACT IS AWARDED FOR THE OWNERSHIP, OPERATION AND MAINTENANCE OF THE WATER AND WASTEWATER UTILITY SYSTEMS AT U.S. ARMY GARRISON WEST POINT, NEW YORK.
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
80 actions since 2022-11-08. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-22 | P00126 | Supplemental agreement (work within scope) | -$62.7K | MODIFICATION P00126 DECREASES THE PRICE OF CLIN 0153 TO REFLECT THE FINAL, AGREED TO FIRM-FIXED PRICE OF $472,284.00 AND DE-OBLIGATES EXCESS FUNDS FROM ACRN CB. |
| 2026-07-22 | P00125 | Funding only | $1.23M | MODIFICATION P00125 OBLIGATES FY26 USC FUNDING FOR THE PERIOD OF PERFORMANCE FROM JUNE 1, 2026 - JUNE 30, 2026. |
| 2026-07-17 | P00124 | Supplemental agreement (work within scope) | $0 | MODIFICATION P00124 REVISES CONTRACT SECTION I.7, OTHER CLAUSES AND CONTRACT TEXTS, TO INCORPORATE FAR CLAUSE 52.222-90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APRIL 2026). |
| 2026-07-01 | P00123 | Administrative change | $0 | MODIFICATION P00123 UPDATES THE WAGE DETERMINATIONS FOR CONTRACT YEAR 7. |
| 2025-12-02 | P00120 | Funding only | $4.91M | MODIFICATION P00120 OBLIGATES FUNDING FOR THE CONTRACT'S MONTHLY UTILITY SERVICES CHARGE AND AMORTIZED INITIAL SYSTEM DEFICIENCY CORRECTION PROJECT PAYMENTS. |
| 2025-11-14 | P00119 | Administrative change | $0 | MODIFICATION P00119 REVISES LANGUAGE IN CONTRACT SECTIONS G.2 AND G.3. |
| 2025-09-29 | P00118 | Supplemental agreement (work within scope) | $535.0K | THIS MODIFICATION AWARDS PROJECT WPSW-25-03, SERVICE TO DRAGON PARK . |
| 2025-09-24 | P00117 | Supplemental agreement (work within scope) | $1.17M | THIS MODIFICATION AWARDS AN EQUITABLE PRICE ADJUSTMENT FOR WATER AND SEWER LINE REROUTING AND ADDITIONAL ROCK REMOVAL FOR PROJECT WPSW-22-01. |
| 2025-09-17 | P00116 | Supplemental agreement (work within scope) | $250.8K | THIS MODIFICATION AWARDS UTILITY SERVICE RELOCATION AND CONNECTION PROJECT WPSW-25-02, WATER SERVICE TO FIRE STATION 2. |
| 2025-09-17 | P00115 | Administrative change | $137.9K | THIS MODIFICATION ENACTS THE ECONOMIC PRICE ADJUSTMENT FOR CONTRACT YEAR 6 AND OBLIGATES FUNDS FOR A RETROACTIVE PRICE ADJUSTMENT. |
| 2025-08-26 | P00114 | Terminated for convenience | -$405.4K | THIS MODIFICATION PARTIALLY TERMINATES REQUIREMENTS UNDER THE CONTRACT AND, SPECIFICALLY, REMOVES THE REQUIREMENT FOR THE CONTRACTOR TO COMPLETE CLIN 0069. THE MOD EFFECTS THE PARTIES TERMINATION SETTLEMENT AND DE-OBLIGATES EXCESS FUNDS. |
| 2025-08-20 | P00113 | Supplemental agreement (work within scope) | $1.14M | THIS MODIFICATION REVISES AND OBLIGATES ADDITIONAL FUNDING TO CLIN 0070 TO PROVIDE AN EQUITABLE ADJUSTMENT FOR THE COST TO REPLACE/REPAIR ISDC PROJECT W16. |
| 2025-08-14 | P00112 | Funding only | $2.38M | MODIFICATION P00112 OBLIGATES FUNDING FOR THE CONTRACT'S MONTHLY UTILITY SERVICES CHARGE AND AMORTIZED INITIAL SYSTEM DEFICIENCY CORRECTION PROJECT PAYMENTS. |
| 2025-08-06 | P00111 | Administrative change | $0 | THIS MODIFICATION UPDATES THE CONTRACT'S DBA AND SCA WAGE DETERMINATIONS FOR CONTRACT YEAR 6 OF 50. |
| 2025-07-30 | P00110 | Change order | $0 | UPDATES SECTION I, CONTRACT CLAUSES, IAW EXECUTIVE ORDERS 14173, ENDING ILLEGAL DISCRIMINATION AND RESTORING MERIT-BASED OPPORTUNITY, AND 14168, DEFENDING WOMEN FROM GENDER IDEOLOGY EXTREMISM AND RESTORING BIOLOGICAL TRUTH TO THE FEDERAL GOVERNMENT. |
| 2025-07-09 | P00109 | Administrative change | $0 | MODIFICATION P00109 ADDRESSES AN APPROPRIATION DATA ERROR THAT WAS CONTAINED IN P00108. |
| 2025-06-27 | P00108 | Funding only | $2.38M | MODIFICATION P00108 OBLIGATES FUNDING FOR THE CONTRACT'S MONTHLY UTILITY SERVICES CHARGE AND AMORTIZED INITIAL SYSTEM DEFICIENCY CORRECTION PROJECT PAYMENTS. |
| 2025-06-23 | P00107 | Supplemental agreement (work within scope) | $25.3K | MODIFICATION P00107 EFFECTS A SUPPLEMENTAL AGREEMENT CHANGING THE SCOPE OF WORK AND FINAL PRICE FOR CLIN 0106, SERVICE TO LINCOLN HALL (WPSW-23-12). |
| 2025-06-18 | P00106 | Supplemental agreement (work within scope) | -$11.7K | MODIFICATION P00106 EFFECTS A SUPPLEMENTAL AGREEMENT ING THE SCOPE OF WORK AND FINAL PRICE FOR CLIN 0113, LEAD SERVICE REPLACEMENT (WPSW-24-05). |
| 2025-05-28 | P00105 | Administrative change | $0 | MODIFICATION P00105 REVISES CLIN 0052 ALLOWING THE CONTRACTOR TO INVOICE TO RECEIVE THE GOVERNMENT'S CONTRIBUTION PURSUANT TO 10 USC 2688(H). |
| 2025-05-05 | P00104 | Funding only | $2.38M | MODIFICATION P00104 OBLIGATES FUNDING TO PAY FOR THE MONTHLY UTILITY SERVICES CHARGE FROM APRIL TO MAY 2025, AND TO PAY FOR SEVERAL AMORTIZED INITIAL SYSTEM DEFICIENCY CORRECTION PROJECTS. |
| 2025-03-06 | P00122 | Change order | -$67.6K | MODIFICATION P00122 AUTHORIZES THE SYSTEM OWNER TO COMPLETE THE GOVERNMENT'S CHANGED REQUIREMENT FOR UTILITY SERVICE CONNECTION PROJECT WPSW-24-05, LEAD SERVICE REPLACEMENT. |
| 2025-03-06 | P00121 | Funding only | $4.91M | MODIFICATION P00121 OBLIGATES FUNDING FOR THE CONTRACT'S MONTHLY UTILITY SERVICES CHARGE AND AMORTIZED INITIAL SYSTEM DEFICIENCY CORRECTION PROJECT PAYMENTS. |
| 2025-01-31 | P00103 | Administrative change | $0 | MODIFICATION P00103 ADDRESSES AND CORRECTS ERRORS THAT WERE CONTAINED IN MODIFICATION P00095. |
| 2025-01-31 | P00102 | Funding only | $3.58M | MODIFICATION P00102 OBLIGATES THREE MONTHS OF FY25 FUNDING FOR THE UTILITY SERVICES CHARGE AND AMORTIZED ISDC PROJECTS. |
| 2024-11-01 | P00101 | Funding only | $3.58M | MODIFICATION P00101 OBLIGATES THREE MONTHS OF FY25 FUNDING FOR THE UTILITY SERVICES CHARGE AND AMORTIZED ISDC PROJECTS. |
| 2024-10-11 | P00100 | Administrative change | $0 | MODIFICATION P00100 INCORPORATES UPDATES TO DFARS CLAUSES 252.204-7012 AND 252.204-7020. |
| 2024-09-30 | P00099 | Supplemental agreement (work within scope) | $340.9K | MODIFICATION P00099 AWARDS CLIN 0114 FOR WPSW-24-06, LUSK 20-INCH RAW WATER LINE METERING STATION |
| 2024-09-19 | P00098 | Supplemental agreement (work within scope) | $1.45M | THIS MODIFICATION AWARDS CLIN 0113, WPSW-24-05, LEAD SERVICE REPLACEMENT. |
| 2024-09-16 | P00097 | Change order | -$1.5K | THIS MODIFICATION REDUCES THE PRICE OF CLIN 0106, WPSW-23-12 SERVICE TO LINCOLN HALL, RESULTING FROM A CHANGE IN THE SCOPE OF WORK REQUIREMENTS. |
| 2024-09-10 | P00096 | Funding only | $71.3K | THIS MODIFICATION OBLIGATES THREE MONTHS OF FUNDING FOR CLIN 0060, ISDC W-6, FILTER BACKWASH PUMPS, THE FLOCCULATION MIXER AND ISOLATION VALVES AT LUSK WTP. |
| 2024-09-10 | P00095 | Supplemental agreement (work within scope) | $79.3K | THIS MODIFICATION CLIN 0112 TO PROVIDE AN EQUITABLE PRICE ADJUSTMENT FOR TEMPORARY OPERATIONS CENTER YEAR 3. |
| 2024-09-10 | P00094 | Change order | -$7.7K | THIS MODIFICATION REVISES CLIN 0082 TO REDUCE THE PRICE FOR PROJECT WPSW-21-05, LEE BARRACKS UPGRADE AND REHABILITATION, AS A RESULT OF A CHANGE TO THE SCOPE OF WORK REQUIREMENTS. |
| 2024-08-30 | P00093 | Supplemental agreement (work within scope) | $47.2K | THIS MODIFICATION AWARDS AN EQUITABLE PRICE ADJUSTMENT FOR TEMPORARY HEATING REQUIREMENTS AT LUSK WATER TREATMENT PLANT. |
| 2024-08-23 | P00092 | Change order | -$12.3K | THIS MODIFICATION EFFECTS A CHANGE ORDER FOR CLIN 0075, ISDC WW-4 WASTEWATER SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEM. |
| 2024-08-09 | P00091 | Supplemental agreement (work within scope) | $4.67M | THIS MODIFICATION ENACTS THE ECONOMIC PRICE ADJUSTMENT FOR CONTRACT YEAR 5. |
| 2024-06-07 | P00090 | Administrative change | $0 | THIS MODIFICATION UPDATES THE WAGE DETERMINATIONS FOR CONTRACT YEAR 5. |
| 2024-06-07 | P00089 | Funding only | $1.14M | THIS MODIFICATION OBLIGATES FUNDING FOR THE MAY UTILITY SERVICE CHARGE AND AMORTIZED PAYMENTS. |
| 2024-06-04 | P00088 | Supplemental agreement (work within scope) | $845.6K | THIS MODIFICATION AWARDS PROJECT WPSW-24-03, CAMP BUCKNER PHASE 3. |
| 2024-05-09 | P00087 | Supplemental agreement (work within scope) | $901.7K | THIS MODIFICATION AWARDS PROJECT WPSW-23-09, LUSK WATER TREATMENT PLANT HEATING. |
| 2024-04-18 | P00086 | Funding only | $1.11M | THIS MODIFICATION FUNDS ONE MONTH OF THE UTILITY SERVICE CHARGE AND AMORTIZED PAYMENTS. |
| 2024-03-18 | P00085 | Supplemental agreement (work within scope) | $67.8K | THIS MODIFICATION AWARDS CLIN 0108 FOR PROJECT WPSW-24-01, BUILDING 352 SANITARY LINE RELOCATION. |
| 2024-03-12 | P00084 | Supplemental agreement (work within scope) | $121.0K | THIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0107 TO FUND SERVICE CONNECTION PROJECT WASTEWATER SERVICE TO TROPHY POINT BAND SHELL (WPSW-24-02). |
| 2024-02-23 | P00083 | Funding only | $1.11M | THIS MODIFICATION OBLIGATES FUNDING FOR THE MARCH UTILITY SERVICE CHARGE AND AMORTIZED INITIAL SYSTEM DEFICIENCY CORRECTION PROJECT PAYMENTS. |
| 2024-01-31 | P00082 | Funding only | $1.11M | THIS MODIFICATION OBLIGATES FUNDING FOR THE FEBRUARY UTILITY SERVICE CHARGE AND AMORTIZED PROJECT PAYMENTS. |
| 2024-01-25 | P00081 | Supplemental agreement (work within scope) | $135.5K | THIS MODIFICATION REVISES AND FUNDS CLIN 0095 FOR AN EQUITABLE PRICE ADJUSTMENT DUE TO ADDITIONAL ROCK REMOVAL REQUIREMENTS AT THE GENERAL INSTRUCTION BUILDING. |
| 2024-01-08 | P00080 | Funding only | $1.04M | THIS MODIFICATION OBLIGATES FUNDING FOR THE JANUARY UTILITY SERVICES CHARGES. |
| 2023-12-11 | P00079 | Supplemental agreement (work within scope) | -$32.2K | THIS MODIFICATION REVISES CLIN 0104 FOR A CHANGE IN SCOPE OF PROJECT WPSW-23-04. |
| 2023-12-04 | P00078 | Funding only | $1.04M | THIS MODIFICATION OBLIGATES FUNDING FOR THE DECEMBER UTILITY SERVICE CHARGE. |
| 2023-11-17 | P00077 | Funding only | $1.04M | THIS MODIFICATION OBLIGATES FUNDING FOR THE NOVEMBER UTILITY SERVICE CHARGE. |
| 2023-11-01 | P00076 | Funding only | $1.04M | THIS MODIFICATION OBLIGATES FUNDING FOR THE OCTOBER UTILITY SERVICE CHARGE. |
| 2023-09-29 | P00075 | Supplemental agreement (work within scope) | $198.4K | THIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0106 TO FUND SERVICE CONNECTION PROJECT SERVICE TO LINCOLN HALL (WPSW-23-12). |
| 2023-09-28 | P00074 | Supplemental agreement (work within scope) | $82.3K | THIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0105 TO FUND SERVICE CONNECTION PROJECT GOLF COURSE IRRIGATION VAULT (WPSW-23-10). |
| 2023-09-28 | P00073 | Supplemental agreement (work within scope) | $205.9K | THIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0104 TO FUND SERVICE CONNECTION PROJECT LEE RD. AUTO FLUSHER (WPSW-23-04). |
| 2023-09-25 | P00072 | Supplemental agreement (work within scope) | $228.1K | THIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0103 TO FUND SERVICE CONNECTION PROJECT BUILDING 845 SANITARY LINE (WPSW-23-11). |
| 2023-09-21 | P00071 | Supplemental agreement (work within scope) | $30.1K | THIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0102 TO FUND CAPITAL UPGRADE PROJECT WATER SERVICE TO QUARTERS 88 (WPSW-23-13). |
| 2023-09-21 | P00070 | Change order | $51.3K | THIS MODIFICATION REVISES AND FUNDS CLIN 0092 TO GRANT AN EQUITABLE ADJUSTMENT DUE TO DIFFERING SITE CONDITIONS. |
| 2023-09-19 | P00069 | Supplemental agreement (work within scope) | $316.6K | THIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0101 FOR PROJECT WPSW-23-05, AUTOMATIC SHUTDOWN AT LUSK AND STONY WATER TREATMENT PLANTS. |
| 2023-09-15 | P00068 | Supplemental agreement (work within scope) | $35.4K | THIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0100 FOR PROJECT WPSW-23-03, BUILDING 1699 WELL. |
| 2023-09-15 | P00067 | Supplemental agreement (work within scope) | $102.2K | THIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0099 TO PROVIDE AN EQUITABLE ADJUSTMENT FOR THE ABATEMENT OF ASBESTOS CONTAINING MATERIALS AT THE LUSK WATER TREATMENT PLANT (CLIN 0059). |
| 2023-08-17 | P00066 | Funding only | $3.12M | THIS MODIFICATION OBLIGATES FUNDING FOR THE JULY, AUGUST, AND SEPTEMBER UTILITY SERVICE CHARGE. |
| 2023-08-11 | P00065 | Change order | $0 | THIS MODIFICATION MODIFIES THE SCOPE OF WORK FOR ISDC W-10 AND PROJECT WPSW-22-05. |
| 2023-08-11 | P00064 | Change order | $0 | THIS MODIFICATION EXTENDS THE PERIODS OF PERFORMANCE FOR CLINS 0062, 0080, 0088, 0089, 0090, 0091, 0095, AND 0097. |
| 2023-07-31 | P00063 | Funding only | $1.04M | THIS MODIFICATION OBLIGATES FUNDING FOR THE JUNE UTILITY SERVICES CHARGE AND ISDC AMORTIZED PAYMENTS. |
| 2023-07-06 | P00062 | Administrative change | $0 | THIS MODIFICATION INCORPORATES FAR CLAUSE 52.204-27, PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023), INTO THE CONTRACT. |
| 2023-07-06 | P00061 | Administrative change | $0 | THIS MODIFICATION ESTABLISHES THE ECONOMIC PRICE ADJUSTMENT AND WAGE DETERMINATIONS FOR CONTRACT YEAR 4. IT ALSO ADJUSTS THE MONTHLY UTILITY SERVICES CHARGE FOR ADDITIONAL UTILITY SERVICE INFRASTRUCTURE PLACED INTO SERVICE. |
| 2023-06-29 | P00060 | Supplemental agreement (work within scope) | $67.7K | THIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0098 TO PROVIDE AN EQUITABLE ADJUSTMENT FOR THE ABATEMENT OF ASBESTOS CONTAINING MATERIALS AND LEAD PAINT AT THE FENTON PLACE BOOSTER PUMP STATION (CLIN 0063). |
| 2023-05-16 | P00059 | Change order | $0 | THIS MODIFICATION INCORPORATES THE REQUIREMENT FOR THE SYSTEM OWNER TO SUBMIT AN ANNUAL UTILITY SYSTEM CONDITION ASSESSMENT AND ACCOMPANYING SELF-ATTESTATION. |
| 2023-05-15 | P00058 | Change order | $0 | THIS MODIFICATION EXTENDS THE PERIODS OF PERFORMANCE FOR CLINS 0052AA, 0052AB, 0063, 0069, 0070, 0075, AND 0082. |
| 2023-05-01 | P00057 | Funding only | $1.93M | THIS MODIFICATION OBLIGATES TWO MONTHS OF FUNDING FOR THE UTILITY SERVICES CHARGE. |
| 2023-03-20 | P00056 | Supplemental agreement (work within scope) | $14.7K | THIS MODIFICATION AUTHORIZES AND FUNDS SERVICE FOR PROJECT WPSW-23-01 UNDER CLIN 0097. |
| 2023-03-20 | P00055 | Supplemental agreement (work within scope) | $1.2K | THIS MODIFICATION PROVIDES A PRICE ADJUSTMENT TO THE MONTHLY UTILITY SERVICES CHARGE FOR ADDITIONAL UTILITY SERVICE INFRASTRUCTURE PLACED INTO SERVICE. |
| 2023-02-28 | P00054 | Supplemental agreement (work within scope) | $2.66M | THIS MODIFICATION AUTHORIZES AND FUNDS SERVICE FOR PROJECT WPSW-22-01 UNDER CLIN 0096. |
| 2023-02-23 | P00053 | Supplemental agreement (work within scope) | $300.0K | THIS MODIFICATION AUTHORIZES AND FUNDS THE WATER UTILITY SERVICE PORTION OF PROJECT WPSW-22-04. |
| 2023-02-15 | P00052 | Funding only | $1.92M | THIS MODIFICATION FUNDS THE UTILITY SERVICES CHARGE FOR FEBRUARY AND MARCH AND TWO MONTHS FOR ISDCS W-4 AND W-12. |
| 2023-02-06 | P00051 | Funding only | $960.7K | THIS MODIFICATION FUNDS THE UTILITY SERVICES CHARGE FOR JANUARY AND ONE MONTH FOR ISDCS W-4 AND W-12. |
| 2023-01-27 | P00050 | Supplemental agreement (work within scope) | $0 | THIS MODIFICATION INCORPORATES THE REQUIREMENT FOR THE CONTRACTOR TO SUBMIT A MONTHLY SYSTEM PERFORMANCE REPORT (MSPR). |
| 2023-01-24 | P00049 | Funding only | $960.7K | THIS MODIFICATION OBLIGATES ONE MONTH FUNDING FOR THE UTILITY SERVICES CHARGE AND ONE MONTH OF AMORTIZED PAYMENT FOR ISDC W-4 AND ISDC W-12. |
| 2022-11-15 | P00048 | Funding only | $1.83M | THIS MODIFICATION OBLIGATES TWO MONTHS FUNDING FOR THE UTILITY SERVICES CHARGE AND TWO MONTHS OF AMORTIZED PAYMENTS FOR ISDC W-12. |
| 2022-11-08 | P00047 | Change order | -$15.9K | THIS MODIFICATION REVISES CLIN 0080 TO DECREASE THE PROJECT PRICE DUE TO A REDUCTION IN THE SCOPE OF WORK REQUIREMENTS. IT ALSO EXTENDS THE PERIOD OF PERFORMANCE. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗