SPRBL123F0004↗
Raytheon Company received this contract from Dla Land at Aberdeen, Defense Logistics Agency: $621.16M obligated so far for maint/repair/rebuild of equipment- guided missiles. It runs to 2026-12-31.
Key facts · data as of Nov 10, 2026
- Recipient
- Raytheon Company
- Awarding agency
- Defense Logistics Agency (Department of Defense)
- Contracting office
- Dla Land at Aberdeen (SPRBL1)
- Obligated to date
- $621.16M
- Potential value
- $331.69M
- Ends
- 2026-12-31
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 10, 2026.
Cite this page: SpendQuery, Award SPRBL123F0004, data as of Nov 10, 2026, https://spendquery.com/award?id=CONT_AWD_SPRBL123F0004_9700_SPRBL115D0017_9700
Raytheon Company: all federal awards · Department of Defense: spending · Dla Land at Aberdeen: what it buys · The follow-on: recompete brief
TASK ORDER FOR ENGINEERING SERVICES IN SUPPORT OF THE PATRIOT WEAPON SYSTEM.
Up for re-bid: ends 2026-12-31. Recompete brief →
What it is
- Product or service
- Maint/Repair/Rebuild of Equipment- Guided Missiles (PSC J014)
- Industry
- Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing (NAICS 334511)
- Contracting office
- Dla Land at Aberdeen (SPRBL1)
- Competition
- Not competed
- Pricing
- Fixed price level of effort
- How it was bought
- Single-award IDIQ · under SPRBL115D0017
- Where the work is
- Essex, MA · district MA-06
- Funding law
- Other emergency or disaster supplementals
- Topics
- patriot
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
83 subawards totaling $13.47M (2.2% of what was obligated), as Raytheon Company reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Carahsoft Technology Corp | $2.64M | 2 | VA | 2024-10-28 | 2025-01-20 |
| Curtiss-Wright DS, Inc. | $1.12M | 3 | VA | 2024-09-06 | 2025-02-10 |
| Drytech Inc | $846.8K | 1 | NJ | 2025-02-20 | 2025-02-20 |
| Cave Systems, Inc | $663.7K | 1 | VA | 2024-07-03 | 2024-07-03 |
| Bei Precision Systems & Space Company, Inc | $550.9K | 2 | AR | 2024-07-17 | 2025-01-28 |
| Anaren, Inc. | $478.1K | 1 | NY | 2024-08-12 | 2024-08-12 |
| Magnus-Hitech Industries, Inc | $419.9K | 1 | FL | 2024-10-18 | 2024-10-18 |
| Memkor Inc | $416.6K | 2 | AZ | 2024-11-14 | 2025-01-29 |
| Heartwood Studios Inc | $350.0K | 1 | CA | 2023-06-14 | 2023-06-14 |
| Temasek Holdings (Private) Limited | $349.3K | 3 | AL | 2024-07-11 | 2025-01-29 |
| L3Harris Technologies, Inc | $321.0K | 2 | UT | 2024-06-10 | 2024-12-19 |
| Tevet, LLC | $319.8K | 3 | TN | 2024-09-30 | 2025-02-20 |
| Quasonix, Inc. | $280.1K | 1 | OH | 2025-03-06 | 2025-03-06 |
| Mercury Systems Inc | $253.0K | 1 | MA | 2024-07-24 | 2024-07-24 |
| C.P.I. International, Inc. | $242.1K | 1 | CA | 2023-09-25 | 2023-09-25 |
| Elscott Manufacturing LLC | $214.8K | 1 | ME | 2024-10-16 | 2024-10-16 |
| Microsemi Corp. - RF Signal Processing | $202.3K | 1 | CT | 2024-12-03 | 2024-12-03 |
| Acumentrics Rups, LLC | $198.8K | 3 | MA | 2023-10-18 | 2024-11-15 |
| Scioteq LLC | $184.4K | 2 | GA | 2024-06-19 | 2024-07-09 |
| Milpower Source, Inc. | $163.1K | 1 | NH | 2024-07-24 | 2024-07-24 |
| Berkshire Hathaway Inc. | $161.6K | 3 | TX | 2024-08-19 | 2025-01-29 |
| Ulyssix Technologies, Inc. | $150.7K | 1 | VA | 2025-04-07 | 2025-04-07 |
| Netapp, Inc. | $144.9K | 3 | VA | 2024-10-15 | 2025-01-29 |
| Digi-Key Corp | $141.3K | 2 | MN | 2025-01-30 | 2026-01-20 |
| Acopian Technical Company | $133.3K | 1 | PA | 2025-03-05 | 2025-03-05 |
The 25 largest of 60; the rest are on USAspending.gov.
The largest single subawards
| Date | To | Amount | For |
|---|---|---|---|
| 2024-10-28 | Carahsoft Technology Corp | $2.50M | MICROPROCESSORS. |
| 2024-09-30 | Curtiss-Wright DS, Inc. | $975.0K | COMPUTER HARDWARE. |
| 2025-02-20 | Drytech Inc | $846.8K | NRE - ALL. |
| 2024-07-03 | Cave Systems, Inc | $663.7K | METAL SHP'G CONTAINR. |
| 2024-08-12 | Anaren, Inc. | $478.1K | TECH/ENG SERVICES. |
| 2025-01-28 | Bei Precision Systems & Space Company, Inc | $472.0K | ENCODERS. |
| 2024-10-18 | Magnus-Hitech Industries, Inc | $419.9K | NON-COMPLEX SHTMETAL. |
| 2023-06-14 | Heartwood Studios Inc | $350.0K | SERVICES: NONPRODUCT PERFORM WORK PER SOW / FY23 EENA |
| 2025-03-06 | Quasonix, Inc. | $280.1K | RECEIVERS. |
| 2025-01-29 | Memkor Inc | $279.3K | COMPUTER HARDWARE. |
| 2024-07-24 | Mercury Systems Inc | $253.0K | COTS & MOD STD CCAS. |
| 2023-09-25 | Microwave Power Products, Inc. | $242.1K | POWERTUBES(TWTS,ETC) TRAVELLING WAVETUBE,LOWPOWER |
| 2024-10-16 | Elscott Manufacturing LLC | $214.8K | TRANSFORMER&REACTOR,INDUCTORS,NRE - ALL. |
| 2024-12-03 | Microsemi Corp. - RF Signal Processing | $202.3K | NON-RF/MW FILTERS. |
| 2024-07-24 | Milpower Source, Inc. | $163.1K | AC-DC POWER SUPPLIES,NRE - ALL. |
| 2024-12-19 | L3 Technologies, Inc. | $163.1K | SERVER PERIPHERAL. |
| 2024-06-10 | L3 Technologies, Inc. | $157.9K | SERVER PERIPHERAL. |
| 2025-04-07 | Ulyssix Technologies, Inc. | $150.7K | ELECTRONIC TEST SYS,CUSTOM CCA'S,NRE - ALL. |
| 2024-10-17 | Miltope Corporation | $146.8K | LAPTOP. |
| 2025-02-20 | Tevet LLC | $142.2K | TEST EQUIPMENT,SERVICES: NONPRODUCT. |
| 2025-01-20 | Carahsoft Technology Corp | $140.5K | ELECTRIC/ONLINE SUBS. |
| 2024-11-14 | Memkor Inc | $137.3K | COMPUTER HARDWARE. |
| 2024-07-11 | Miltope Corporation | $134.5K | LAPTOP. |
| 2025-03-05 | Acopian Technical Company | $133.3K | AC-DC POWER SUPPLIES. |
| 2025-03-18 | Mu-Del Electronics LLC | $130.3K | ANTENNAS & PEDESTALS,NRE - ALL. |
Every action
72 actions since 2023-02-21. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-03-06 | P00041 | Supplemental agreement (work within scope) | -$1.72M | DEOBLIGATE FUNDS AND EXTEND POP |
| 2026-03-06 | P00041 | Supplemental agreement (work within scope) | $0 | DE-OBLIGATE FUNDS AND EXTEND POP |
| 2025-11-10 | P00040 | Supplemental agreement (work within scope) | -$61.3K | DEOB FUNDING AND UPDATE ESM SHEETS |
| 2025-10-29 | P00040 | Supplemental agreement (work within scope) | $0 | UPDATE FUNDING, UPDATE ESM SHEETS |
| 2025-09-16 | P00039 | Supplemental agreement (work within scope) | -$3.25M | UPDATE ESM SHEETS, DEOB FUNDING |
| 2025-08-07 | P00038 | Supplemental agreement (work within scope) | $0 | EXTEND CLIN POP AND UPDATE SEC J |
| 2025-07-01 | P00037 | Supplemental agreement (work within scope) | $0 | ESM CY23-24 POP EXTENSIONS |
| 2025-04-28 | P00036 | Supplemental agreement (work within scope) | $0 | PHASED ARRAY TRACKING RADAR TO INTERCEPT ON TARGET (PATRIOT) WEAPON SYSTEM: ENGINEERING SERVICES, TESTING, PROGRAM MANAGEMENT, PRODUCT ASSURANCE, AND LOGISTICS |
| 2025-03-31 | P00035 | Supplemental agreement (work within scope) | $0 | PATRIOT WEAPON SYSTEM - ENGINEERING SERVICES MEMORANDUM CY23-24. SCOPE: PROGRAM MANAGEMENT, CONFIGURATION MANAGEMENT, PRODUCT ASSURANCE, LOGISTICS, SYSTEMS ENGINEERING, MAINTENANCE ENGINEERING. |
| 2025-03-31 | P00035 | Supplemental agreement (work within scope) | $0 | PHASED ARRAY TRACKING RADAR TO INTERCEPT ON TARGET (PATRIOT) WEAPON SYSTEM: ENGINEERING SERVICES, TESTING, PROGRAM MANAGEMENT, PRODUCT ASSURANCE, AND LOGISTICS |
| 2025-03-05 | P00034 | Funding only | $630.0K | PATRIOT WEAPON SYSTEM - ENGINEERING SERVICES MEMORANDUM CY23-24. SCOPE: PROGRAM MANAGEMENT, CONFIGURATION MANAGEMENT, PRODUCT ASSURANCE, LOGISTICS, SYSTEM ENGINEERING, MAINTENANCE ENGINEERING. |
| 2025-02-25 | P00033 | Funding only | -$3.36M | ENGINEERING SERVICES MEMORANDUM FY23 & FY24 DE-OBLIGATION |
| 2025-02-25 | P00033 | Funding only | -$5.19M | ENGINEERING SERVICES MEMORANDUM FY23 & FY24 DE-OBLIGATION |
| 2025-01-30 | P00032 | Supplemental agreement (work within scope) | $0 | ESM MOD 32 |
| 2025-01-15 | P00031 | Supplemental agreement (work within scope) | $512.6K | ESM INCREMENTAL FUNDING |
| 2025-01-15 | P00031 | Supplemental agreement (work within scope) | $1.41M | ESM MOD 31 |
| 2024-10-25 | P00030 | Supplemental agreement (work within scope) | $6.41M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FINDING FOR THE ENGINEERING SERVICES EFFORT |
| 2024-09-24 | P00029 | Supplemental agreement (work within scope) | $2.33M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES EFFORT. |
| 2024-09-24 | P00029 | Supplemental agreement (work within scope) | $5.62M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES EFFORT. |
| 2024-08-22 | P00028 | Supplemental agreement (work within scope) | $3.64M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES EFFORT. |
| 2024-08-22 | P00028 | Supplemental agreement (work within scope) | $948.5K | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES EFFORT. |
| 2024-07-31 | P00027 | Supplemental agreement (work within scope) | $935.9K | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES EFFORT. |
| 2024-07-31 | P00027 | Supplemental agreement (work within scope) | $2.47M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES EFFORT. |
| 2024-07-10 | P00026 | Supplemental agreement (work within scope) | $4.2K | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING TO CORRECT AN ADMIN ERROR IN MOD 25 |
| 2024-06-27 | P00025 | Supplemental agreement (work within scope) | $7.72M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES EFFORT. |
| 2024-06-27 | P00025 | Supplemental agreement (work within scope) | $4.12M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES EFFORT. |
| 2024-05-15 | P00024 | Supplemental agreement (work within scope) | $4.54M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES EFFORT. |
| 2024-05-15 | P00024 | Supplemental agreement (work within scope) | $14.69M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES EFFORT. |
| 2024-04-24 | P00023 | Supplemental agreement (work within scope) | $1.65M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES. |
| 2024-04-24 | P00023 | Supplemental agreement (work within scope) | $20.00M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES EFFORT. |
| 2024-04-11 | P00022 | Supplemental agreement (work within scope) | $19.97M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES. |
| 2024-04-11 | P00022 | Supplemental agreement (work within scope) | $32.45M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES. |
| 2024-03-20 | P00021 | Supplemental agreement (work within scope) | $4.49M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR ENGINEERING SERVICES. |
| 2024-03-20 | P00021 | Supplemental agreement (work within scope) | $7.10M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES. |
| 2024-02-29 | P00020 | Supplemental agreement (work within scope) | $19.87M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR ENGINEERING SERVICES. |
| 2024-02-29 | P00020 | Supplemental agreement (work within scope) | $17.91M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ENGINEERING SERVICES. |
| 2024-02-01 | P00019 | Supplemental agreement (work within scope) | $80.49M | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING FOR ENGINEERING SERVICES AND ADJUST THE PERIOD OF PERFORMANCE FOR VARIOUS TASKS. |
| 2024-02-01 | P00019 | Supplemental agreement (work within scope) | $32.66M | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING FOR ENGINEERING SERVICES AND ADJUST THE PERIOD OF PERFORMANCE FOR VARIOUS TASKS. |
| 2024-01-29 | P00018 | Supplemental agreement (work within scope) | $1.52M | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING FOR ENGINEERING SERVICES AND ADJUST THE PERIOD OF PERFORMANCE FOR VARIOUS TASKS. |
| 2024-01-29 | P00018 | Supplemental agreement (work within scope) | $3.35M | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING FOR ENGINEERING SERVICES AND ADJUST THE PERIOD OF PERFORMANCE FOR VARIOUS TASKS. |
| 2023-12-26 | P00017 | Supplemental agreement (work within scope) | $5.54M | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING FOR ENGINEERING SERVICES AND ADJUST THE PERIOD OF PERFORMANCE FOR VARIOUS TASKS. |
| 2023-11-29 | P00016 | Supplemental agreement (work within scope) | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING FOR ENGINEERING SERVICES AND ADJUST THE PERIOD OF PERFORMANCE FOR VARIOUS TASKS. |
| 2023-10-31 | P00015 | Supplemental agreement (work within scope) | $981.1K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES |
| 2023-10-31 | P00014 | Supplemental agreement (work within scope) | $987.7K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES |
| 2023-10-06 | P00013 | Supplemental agreement (work within scope) | $410.8K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES |
| 2023-10-06 | P00013 | Supplemental agreement (work within scope) | $12.70M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES. |
| 2023-09-13 | P00012 | Supplemental agreement (work within scope) | $1.41M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES |
| 2023-09-13 | P00012 | Supplemental agreement (work within scope) | $931.7K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES. |
| 2023-08-17 | P00011 | Supplemental agreement (work within scope) | $2.13M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES. |
| 2023-08-17 | P00011 | Supplemental agreement (work within scope) | $7.62M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES. |
| 2023-07-31 | P00010 | Supplemental agreement (work within scope) | $576.7K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES. |
| 2023-07-31 | P00010 | Supplemental agreement (work within scope) | $19.1K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES. |
| 2023-07-19 | P00009 | Supplemental agreement (work within scope) | $98.3K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES. |
| 2023-07-19 | P00009 | Supplemental agreement (work within scope) | $2.26M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES. |
| 2023-05-26 | P00008 | Supplemental agreement (work within scope) | $4.95M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING |
| 2023-05-26 | P00008 | Supplemental agreement (work within scope) | $12.61M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR ENGINEERING SERVICES. |
| 2023-04-27 | P00007 | Supplemental agreement (work within scope) | $6.64M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| 2023-04-27 | P00007 | Supplemental agreement (work within scope) | $2.35M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| 2023-04-24 | P00006 | Funding only | $490.4K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| 2023-04-24 | P00006 | Funding only | $16.42M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| 2023-04-19 | P00005 | Supplemental agreement (work within scope) | $5.49M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| 2023-04-19 | P00005 | Supplemental agreement (work within scope) | $21.55M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| 2023-03-31 | P00004 | Funding only | $20.60M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| 2023-03-31 | P00004 | Funding only | $32.73M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| 2023-03-28 | P00003 | Funding only | $2.02M | MODIFICATION TO ADD INCREMENTAL FUNDING |
| 2023-03-28 | P00003 | Funding only | $27.20M | MODIFICATION TO ADD INCREMENTAL FUNDING |
| 2023-03-14 | P00002 | Administrative change | $2.12M | MODIFICATION TO INCREMENTALLY FUND TASK ORDER FOR ENGINEERING SERVICES TO SUPPORT PATRIOT WEAPON SYSTEM. |
| 2023-03-14 | P00002 | Administrative change | $13.60M | MODIFICATION TO INCREMENTALLY FUND TASK ORDER FOR ENGINEERING SERVICES IN SUPPORT OF PATRIOT WEAPON SYSTEM |
| 2023-03-14 | P00001 | Supplemental agreement (work within scope) | $15.7K | MODIFICATION TO FUND THE TO AND TO UPDATE THE DD 254. |
| 2023-03-14 | P00001 | Supplemental agreement (work within scope) | $400.0K | MODIFICATION TO FUND THE TO AND TO UPDATE THE DD 254. |
| 2023-02-21 | 0 | $97.41M | TASK ORDER FOR ENGINEERING SERVICES IN SUPPORT OF THE PATRIOT WEAPON SYSTEM. | |
| 2023-02-21 | 0 | $35.06M | TASK ORDER FOR ENGINEERING SERVICES TO SUPPORT THE PATRIOT WEAPON SYSTEM. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-10). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗