Putting the award page together from the records…
Putting the award page together from the records…
120MM, ADVANCED MULTI-PURPOSE (AMP) M1147 HIGH EXPLOSIVE MULTI-PURPOSE WITH TRACER (HEMP-T) CARTRIDGE
Up for re-bid: ends 2028-05-31. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
30 subawards totaling $39.35M (24.7% of what was obligated), as Northrop Grumman Systems Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Compagnie De Developpement De L'Eau S.A. | $11.62M | 1 | VA | 2026-08-25 | 2026-08-25 |
| Lakes Area Manufacturing Co | $8.21M | 2 | MN | 2026-07-30 | 2026-08-07 |
| Transdigm Group Incorporated | $4.41M | 1 | CA | 2026-08-27 | 2026-08-27 |
| Quality Machining Inc | $3.47M | 2 | WI | 2026-06-23 | 2026-06-30 |
| Wisconsin Plastics Inc | $3.30M | 2 | WI | 2026-05-20 | 2026-07-22 |
| National Presto Industries, Inc. | $1.11M | 1 | WI | 2026-07-09 | 2026-07-09 |
| Dedicated Logistics Warehousing, LLC | $1.08M | 1 | MN | 2026-06-29 | 2026-06-29 |
| Microcast Technologies Corp | $768.5K | 1 | NJ | 2026-08-04 | 2026-08-04 |
| Modern Manufacturing & Engineering, Inc | $683.8K | 1 | MN | 2026-06-29 | 2026-06-29 |
| Teamvantage Molding, LLC | $599.7K | 1 | MN | 2026-06-22 | 2026-06-22 |
| Heartland Equity Partners LLC | $545.1K | 1 | MN | 2026-07-16 | 2026-07-16 |
| Powell Electronics, Inc. | $536.7K | 2 | NJ | 2026-06-11 | 2026-07-23 |
| Protofab Engineering Inc. | $519.6K | 1 | MN | 2026-06-30 | 2026-06-30 |
| Technical Metal Specialties Inc | $479.5K | 1 | WI | 2026-06-30 | 2026-06-30 |
| Foam Design Inc | $361.8K | 1 | KY | 2026-06-30 | 2026-06-30 |
| Coilcraft Inc | $317.4K | 1 | IL | 2026-06-30 | 2026-06-30 |
| Yoland Corp | $299.8K | 1 | NJ | 2026-06-30 | 2026-06-30 |
| Alliance Machine Inc | $225.5K | 1 | MN | 2026-06-30 | 2026-06-30 |
| Berkshire Hathaway Inc. | $223.5K | 1 | TX | 2026-06-01 | 2026-06-01 |
| Omnetics Connector Corporation | $148.2K | 1 | MN | 2026-07-07 | 2026-07-07 |
| Arc Deland LLC | $146.1K | 1 | FL | 2026-07-07 | 2026-07-07 |
| Circuit Check, Inc. | $97.6K | 1 | MN | 2026-08-19 | 2026-08-19 |
| Atlantis Industries Corp | $61.9K | 1 | DE | 2026-08-19 | 2026-08-19 |
| A.K. Stamping Co., Inc. | $55.0K | 1 | NJ | 2026-06-11 | 2026-06-11 |
| Tsi Plastics, Inc. | $51.1K | 1 | MN | 2026-05-14 | 2026-05-14 |
The 25 largest of 26; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2026-08-25 | Bae Systems Ordnance Systems Inc | $11.62M | EXPLOSIVES MANUFACTURING |
| 2026-08-07 | Lakes Area Manufacturing Co | $6.71M | MACHINE SHOPS |
| 2026-08-27 | Armtec Defense Products Co. | $4.41M | SMALL ARMS, ORDNANCE, AND ORDNANCE ACCESSORIES MANUFACTURING |
| 2026-06-23 | Quality Machining Inc | $2.99M | MACHINE SHOPS |
| 2026-05-20 | Wisconsin Plastics Inc | $2.48M | ALL OTHER PLASTICS PRODUCT MANUFACTURING |
| 2026-07-30 | Lakes Area Manufacturing Co | $1.50M | MACHINE SHOPS |
| 2026-07-09 | Amtec Corporation | $1.11M | EXPLOSIVES MANUFACTURING |
| 2026-06-29 | Dedicated Logistics Warehousing, LLC | $1.08M | GENERAL WAREHOUSING AND STORAGE |
| 2026-07-22 | Wisconsin Plastics Inc | $817.9K | PLASTICS MATERIAL AND RESIN MANUFACTURING |
| 2026-08-04 | Microcast Technologies Corp | $768.5K | MACHINE SHOPS |
| 2026-06-29 | Modern Manufacturing & Engineering, Inc | $683.8K | MACHINE SHOPS |
| 2026-06-22 | Teamvantage Molding, LLC | $599.7K | ALL OTHER PLASTICS PRODUCT MANUFACTURING |
| 2026-07-16 | Cass Screw Machine Products LLC | $545.1K | PRECISION TURNED PRODUCT MANUFACTURING |
| 2026-06-30 | Protofab Engineering Inc. | $519.6K | MACHINE SHOPS |
| 2026-07-23 | Powell Electronics, Inc. | $487.9K | OTHER ELECTRONIC COMPONENT MANUFACTURING |
| 2026-06-30 | Quality Machining Inc | $486.9K | MACHINE SHOPS |
| 2026-06-30 | Technical Metal Specialties Inc | $479.5K | MOTOR VEHICLE SEATING AND INTERIOR TRIM MANUFACTURING |
| 2026-06-30 | Foam Design Inc | $361.8K | URETHANE AND OTHER FOAM PRODUCT (EXCEPT POLYSTYRENE) MANUFACTURING |
| 2026-06-30 | Coilcraft Inc | $317.4K | CAPACITOR, RESISTOR, COIL, TRANSFORMER, AND OTHER INDUCTOR MANUFACTURING |
| 2026-06-30 | Yoland Corp | $299.8K | ALL OTHER MISCELLANEOUS TEXTILE PRODUCT MILLS |
| 2026-06-30 | Alliance Machine Inc | $225.5K | MACHINE SHOPS |
| 2026-06-01 | Tti Inc. | $223.5K | ELECTRONIC CONNECTOR MANUFACTURING |
| 2026-07-07 | Omnetics Connector Corporation | $148.2K | ELECTRONIC CONNECTOR MANUFACTURING |
| 2026-07-07 | Arc Deland LLC | $146.1K | OTHER ELECTRONIC COMPONENT MANUFACTURING |
| 2026-08-19 | Circuit Check, Inc. | $97.6K | INSTRUMENT MANUFACTURING FOR MEASURING AND TESTING ELECTRICITY AND ELECTRICAL SIGNALS |
2 actions since 2026-03-27. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-03-27 | 0 | $7.49M | 120MM, ADVANCED MULTI-PURPOSE (AMP) M1147 HIGH EXPLOSIVE MULTI-PURPOSE WITH TRACER (HEMP-T) CARTRIDGE | |
| 2026-03-27 | 0 | $151.67M | 120MM, ADVANCED MULTI-PURPOSE (AMP) M1147 HIGH EXPLOSIVE MULTI-PURPOSE WITH TRACER (HEMP-T) CARTRIDGE |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗