W519TC23F0108↗

General Dynamics-Ots, Inc. received this contract from W6QK Acc-Ri, Department of the Army: $121.58M obligated so far for ammunition, over 125mm. It runs to 2027-05-31.

Key facts · data as of Oct 26, 2026

Recipient
General Dynamics-Ots, Inc.
Awarding agency
Department of the Army (Department of Defense)
Contracting office
W6QK Acc-Ri (W519TC)
Obligated to date
$121.58M
Potential value
$121.58M
Ends
2027-05-31

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 26, 2026.

Cite this page: SpendQuery, Award W519TC23F0108, data as of Oct 26, 2026, https://spendquery.com/award?id=CONT_AWD_W519TC23F0108_9700_W519TC23D0015_9700

MINIMUM GUARANTEE FOR THE CONTRACTOR TO STAND UP A 155MM PROJECTILE LOAD, ASSEMBLE, PACK PRODUCTION LINE AT THE CAMDEN, ARKANSAS FACILITY.

Delivery Order · Department of the Army · to General Dynamics-Ots, Inc. (UEI KZK8C85C1T94) · data as of 2026-10-26

Obligated to date$121.58M17 actions
Current value$121.58Mwith options exercised
Period2023-02-15 → 2027-05-31current end date
Passed on$85.90Mto 38 subcontractors

Up for re-bid: ends 2027-05-31. Recompete brief → · Grenades, M67 Hand Fragmentation & M111 Hand Offensive and M112 Practice Body ↗

What it is

Product or service
Ammunition, Over 125Mm (PSC 1320)
Industry
Ammunition (Except Small Arms) Manufacturing (NAICS 332993)
Contracting office
W6QK Acc-Ri (W519TC)
Competition
Full and open after exclusion of sources · 2 offers received
Pricing
Fixed price with economic price adjustment
How it was bought
Multiple-award IDIQ · under W519TC23D0015
Where the work is
Calhoun, AR · district AR-04

Obligations by fiscal year

FY2023$124.91M
FY2024-$3.40M
FY2026$65.0K

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

73 subawards totaling $85.90M (70.7% of what was obligated), as General Dynamics-Ots, Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.

SubcontractorAmountSubawardsWhereFirstLast
Paramount Enterprises International, Inc.$25.99M2PA2023-07-282023-10-27
Tim Jordan Co Inc$11.53M3AR2023-08-182024-12-18
Integrated Production Systems, Inc.$9.45M4TX2023-09-272024-06-20
Apex Control Systems Inc$7.51M5AR2023-04-122025-06-06
Weldon Machine Tool, Inc.$7.21M8PA2023-11-152024-12-06
Icor Construction LLC$7.13M11AR2023-03-162025-08-26
V.J. Technologies, Inc$5.58M2NY2023-04-132023-04-13
Apex Automation Inc$2.67M1IN2023-04-112023-04-11
Thaler Machine Company, LLC$2.49M1OH2023-12-112023-12-11
General Dynamics Corp$2.04M1AR2023-03-072023-03-07
Ige Performance Chemicals LLC$584.2K1NY2025-10-152025-10-15
Ellsworth Corp$516.7K2WI2024-06-252025-05-13
Willrich Precision Instrument Company, Inc$467.8K3NJ2024-03-052024-07-29
Minuteman Security Technologies, Inc.$309.2K1MA2024-08-082024-08-08
Xometry, Inc$286.5K1MD2024-02-262024-02-26
Rpi Molding, LLC$255.6K1IA2024-02-202024-02-20
Hugg and Hall Equipment Company$208.5K2AR2023-07-182023-07-18
Ecs Solutions, Inc$187.6K2IN2024-08-152024-09-09
Holt Builders Supply Inc$150.0K1AR2024-10-312024-10-31
Highland Machine Works, Inc.$149.6K3AR2024-07-092025-02-04
Climax Portable Machine Tools, Inc$144.7K1OR2024-06-132024-06-13
Peerless Industrial Equipment Corp.$114.7K1WI2023-12-182023-12-18
Capital Recovery Group Technologies, LLC$106.4K1KY2024-06-272024-06-27
Utility Tri-State, Inc.$103.0K1OK2024-07-112024-07-11
Amentum Holdings Inc.$95.6K1TN2024-12-112024-12-11

The 25 largest of 38; the rest are on USAspending.gov.

The largest single subawards
DateToAmountFor
2023-10-27Paramount Enterprises International, Inc.$18.30MTNT/LOGISTICS
2023-09-27Integrated Production Systems, Inc.$9.01MAUTOMATION KETTLE SYSTEM L1
2023-07-28Paramount Enterprises International, Inc.$7.68MTNT/LOGISTICS
2023-08-18Tim Jordan Co Inc$6.35MBUILDING 46 M795 TEMPERATURE CONDITIONING AND TESTING
2024-01-19Tim Jordan Co Inc$5.13MM795 BUILDING 46B
2024-01-17Weldon Machine Tool, Inc.$4.21MROBOTIC DRILL
2024-02-26Apex Control Systems Inc$3.76M155MM PROJECTILE AIR COOLING TUNNEL #4
2023-04-25Icor Construction LLC$3.51MBLDG 45 155MM MELT POUR PROJECT
2023-04-13V.J. Technologies, Inc$2.84M3 MEV SYSTEM FOR 155 MM ROUND L1
2023-04-13V.J. Technologies, Inc$2.74MPROVIDE THE X-RAY EQUIPMENT AND ALL PROCESS TOOLING AND SOFTWARE TO X-RAY POST-LAP CASES IN ACCORDANCE WITH ALL INSPECTION REQUIREMENTS.
2023-04-11Apex Automation Inc$2.67MPROVIDE AND INSTALL THE COOLING TUNNEL AND CONVEYOR IN BLDG 45.
2023-04-12Apex Control Systems Inc$2.67M155MM PROJECTILE CONTROLLED AIR COOLING LINE
2023-12-11Thaler Machine Company, LLC$2.49MLINER, SUPPLEMENTARY CHARGE, THREADED
2023-03-07General Dynamics-Ots, Inc.$2.04MOVERSEE THE M795 18-MONTH FACILITIZATION EFFORT TO ENSURE CAMDEN IS READY TO LAP M795S CASES BY AUGUST 2024. INTERFACE DIRECTLY WITH CONTRACTORS AND EXECUTE THE CONSTRUCTION SCHEDULE. RECEIVE EQUIPMENT AND TOOLING, AND…
2023-11-15Weldon Machine Tool, Inc.$1.80MROBOTIC DRILL - DOWN PAYMENT
2024-11-18Icor Construction LLC$1.25MLINE SET UP MODIFICATION ALONG WITH B45 PARTIALS CHILLERS, ELECTRICAL, DUCT WORK ETC
2024-05-29Apex Control Systems Inc$935.4KADDER MOD TO INCLUDE CARTS NOT PALLETS, WASHDOWN CARTS, STAINLESS TUNNEL AND REMOVABLE PANELS, WASHDOWN CART CONVEYOR, AND ADDITIONAL WATER CONDITIONING ZONES
2023-03-16Icor Construction LLC$733.4KRENOVATE BUILDING 15-AT-1A FOR THE BED DOWN OF HYDRA OPERATIONS. MOVE THE CURRENT HYDRA EQUIPMENT TO FROM BLDG 41 TO BLDG 15-AT-1A AND SET UP.
2023-03-16Icor Construction LLC$733.4KBLDG 15AT1A HYDRA FAST PACK FACILITY
2024-02-26Weldon Machine Tool, Inc.$634.3KBLDG 45: STAMPING UPGRADE
2025-10-15Ige Performance Chemicals LLC$584.2KNITROTOLUENE 60, IMX ADDITIVE IMPROVING CAST QUALITY
2024-06-25Ellsworth Corp$486.5K3145 ADHESIVE SLNT GRAY, MIL-A-46146, GRP II & III TYPE 1 AND 3145 ADHESIVE GRAY 305 ML
2024-03-05Willrich Precision Instrument Company, Inc$336.4KELECTRONIC AUTO GAGING CONTROLS
2024-08-08Minuteman Security Technologies, Inc.$309.2KCENTRAL NVR SYSTEM INCLUDING CAMERAS AND INSTALL
2024-02-26Xometry, Inc$286.5K1401-344 FUNNEL FOR 155MM TNT LOADING

Every action

17 actions since 2023-02-15. Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2026-05-13P00016Funding only$65.0KORDER W519TC23F0108 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK 171,843 UNITS OF 155MM PROJECTILES.
2026-02-25P00015Change order$0ORDER W519TC23F0108 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK 171,843 UNITS OF 155MM PROJECTILES.
2024-06-26P00014Funding only$0ORDER W519TC23F0108 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK 171,843 UNITS OF 155MM PROJECTILES.
2024-05-29P00013Supplemental agreement (work within scope)-$3.40MORDER W519TC23F0108 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK 171,843 UNITS OF 155MM M795 PROJECTILES.
2024-05-07P00012Administrative change$0ORDER W519TC23F0108 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK 171,843 UNITS OF 155MM PROJECTILES.
2024-02-16P00011Supplemental agreement (work within scope)$0ORDER W519TC23F0108 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK 171,843 UNITS OF 155MM PROJECTILES.
2024-02-07P00010Supplemental agreement (work within scope)$0ORDER W519TC23F0108 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK 171,843 UNITS OF 155MM PROJECTILE.
2023-12-11P00009Supplemental agreement (work within scope)$0ORDER W519TC23F0108 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK 171,843 UNITS OF 155MM PROJECTILES.
2023-11-20P00008Supplemental agreement (work within scope)$0UKRAINE. ORDER W519TC23F0108 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK 155MM PROJECTILES.
2023-09-28P00007Supplemental agreement (work within scope)$77.86MUKRAINE. ORDER W519TC23F0108 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK 171,843 UNITS OF 155MM PROJECTILES.
2023-08-23P00006Supplemental agreement (work within scope)$0ORDER W529TC23F0108 IS FOR THE CONTRACTOR TO STAND UP A 155MM PROJECTILE LOAD, ASSEMBLE, PACK LINE AT ITS CAMDEN, ARKANSAS FACILITY.
2023-08-10P00005Supplemental agreement (work within scope)$0ORDER W519TC23F0108 IS FOR THE CONTRACTOR TO STAND UP A 155MM PROJECTILE LOAD, ASSEMBLE, PACK LINE AT ITS CAMDEN ARKANSAS FACILITY. MODIFICATION P00005 CHANGES THE ADMIN BY FROM 1002A TO W519TC.
2023-06-29P00004Supplemental agreement (work within scope)$27.05MORDER W519TC23F0108 IS FOR THE CONTRACTOR TO STAND UP A 155MM PROJECTILE LOAD, ASSEMBLE, PACK LINE AT ITS CAMDEN, ARKANSAS FACILITY. MODIFICATION P00004 INCREASES THE NOT TO EXCEED CEILING AND PROVIDES ADDITIONAL FUNDING.
2023-06-15P00003Supplemental agreement (work within scope)$0ORDER W519TC23F0108 IS THE MINIMUM GUARANTEE FOR THE CONTRACTOR TO STAND UP A 155MM PROJECTILE LOAD, ASSEMBLE, PACK PRODUCTION LINE AT IT'S CAMDEN, ARKANSAS FACILITY. MODIFICATION P00003 INCORPORATES PERFORMANCE-BASED PAYMENT SCHEDULE AND CLAUSES.
2023-05-09P00002Administrative change$0ORDER W519TC23F0108 IS THE MINIMUM GUARANTEE FOR THE CONTRACTOR TO STAND UP A 155MM PROJECTILE LOAD, ASSEMBLE, PACK PRODUCTION LINE AT IT'S CAMDEN, ARKANSAS FACILITY.
2023-04-27P00001Funding only$10.00MORDER W519TC23F0108 IS THE MINIMUM GUARANTEE FOR THE CONTRACTOR TO STAND UP A 155MM PROJECTILE LOAD, ASSEMBLE, PACK PRODUCTION LINE AT THE CAMDEN, ARKANSAS FACILITY. MOD P00001 PROVIDES INCREMENTAL FUNDING FOR THE UCA FROM 50% TO 100%.
2023-02-150$10.00MMINIMUM GUARANTEE FOR THE CONTRACTOR TO STAND UP A 155MM PROJECTILE LOAD, ASSEMBLE, PACK PRODUCTION LINE AT THE CAMDEN, ARKANSAS FACILITY.

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-26). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗