Fitt Scientific, LLC received this contract from W6QK Acc-Ri, Department of the Army: $70.58M obligated so far for maint/repair/rebuild of equipment- vehicular equipment components. It runs to 2027-01-17.
Key facts · data as of Oct 23, 2026
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 23, 2026.
Cite this page: SpendQuery, Award W52P1J22F0014, data as of Oct 23, 2026, https://spendquery.com/award?id=CONT_AWD_W52P1J22F0014_9700_W52P1J18G0041_9700
Fitt Scientific, LLC: all federal awards · Department of Defense: spending · W6QK Acc-Ri: what it buys · The follow-on: recompete brief
EAGLE CONTRACT - FORT RILEY, KS WHICH CONSISTS OF MAINTENANCE, SUPPLY, AND TRANSPORTATION.
Up for re-bid: ends 2027-01-17. Recompete brief → · EAGLE Fort Riley KS W519TC-26-R-A054 ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
139 actions since 2022-10-20. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-23 | P00162 | Funding only | $189.9K | THE PURPOSE OF THIS MOD IS TO INCREMENTALLY FUND OY4 CLINS. |
| 2026-06-08 | P00161 | Funding only | $23.1K | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE PWS AND ADD ANNEXES. |
| 2026-04-14 | P00160 | Funding only | $47.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO OY2 CLINS. |
| 2026-04-09 | P00159 | Change order | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE OPTION YEAR 2-OPTION YEAR 4 PROPOSAL. |
| 2026-03-24 | P00158 | Funding only | $30.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO OY4 CLINS. |
| 2026-03-19 | P00157 | Funding only | $3.41M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO OY4 CLINS. |
| 2026-03-11 | P00156 | Funding only | $1.14M | INCREMENTALLY FUND OY4. |
| 2026-03-05 | P00155 | Funding only | $1.10M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO OY4 CLINS. |
| 2026-01-28 | P00154 | Funding only | $151.2K | ESTABLISH AND INCREMENTALLY FUND 1ID CLINS |
| 2026-01-22 | P00153 | Funding only | $40.0K | INCREMENTALLY FUND OY4 1ID |
| 2026-01-14 | P00152 | Funding only | $25.8K | OY3 INCREMENTAL FUNDING |
| 2026-01-13 | P00151 | Funding only | -$25.8K | DESCOPE CLIN 3012FA |
| 2026-01-13 | P00150 | Funding only | $326.3K | REALIGN OY3 FUNDS |
| 2026-01-11 | P00149 | Funding only | $0 | REALIGN OY3 FUNDS |
| 2026-01-09 | P00148 | Funding only | $0 | THE PURPOSE OF MODIFICATION P00148 IS TO REDUCE AN OY4 CLIN. |
| 2026-01-05 | P00147 | Supplemental agreement (work within scope) | $459.8K | FUNDING INCREASE AND UPDATED WAGE RATES. |
| 2025-12-29 | P00146 | Funding only | $303.9K | CORRECT SECTION A NARRATIVE OF P00145. ADD INCREMENTALLY FUNDING. |
| 2025-12-20 | P00145 | Funding only | $2.18M | THE PURPOSE OF MODIFICATION P00145 IS TO ADD INCREMENTAL FUNDING TO OY4 CLINS. |
| 2025-12-18 | P00144 | Funding only | $1.83M | THE PURPOSE OF MODIFICATION P00144 IS TO ADD INCREMENTAL FUNDING TO OY4 CLINS. |
| 2025-12-02 | P00143 | Funding only | $1.09M | THE PURPOSE OF MODIFICATION P00143 IS TO ADD INCREMENTAL FUNDING TO OY4 CLINS. |
| 2025-11-25 | P00142 | Funding only | $1.31M | THE PURPOSE OF MODIFICATION P00142 IS TO ADD INCREMENTAL FUNDING TO OY3 CLINS. |
| 2025-11-12 | P00141 | Option exercised | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD FOUR FOR FT. RILEY. |
| 2025-11-04 | P00140 | Funding only | $169.2K | INCREMENTAL FUNDING OY3 CLINS FOR FY26. |
| 2025-09-30 | P00139 | Option exercised | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE GFP, UPDATE WAWF CLAUSE, AND ADDRESS P00138 UNILATERAL MODIFICATION CORRECTION. |
| 2025-09-27 | P00138 | Funding only | $1.74M | THE PURPOSE OF MODIFICATION P00138 IS TO ADD INCREMENTAL FUNDING TO OY3 CLINS. |
| 2025-09-25 | P00137 | Funding only | $5.7K | THE PURPOSE OF MODIFICATION P00137 IS TO ADD INCREMENTAL FUNDING TO BASE YEAR CLIN 0004FB TO COVER FINAL INVOICES |
| 2025-09-24 | P00136 | Funding only | $166.8K | INCREMENTALLY FUND BY AND OY1 CLINS. |
| 2025-09-23 | P00135 | Funding only | $0 | REALIGNMENT OF FUNDS MODIFICATION. |
| 2025-09-23 | P00134 | Funding only | $234.2K | INCREMENTAL FUNDING MOD OF ALREADY ESTABLISHED CLINS. |
| 2025-09-15 | P00133 | Funding only | $3.0K | EAGLE FRKS: INCREMENTALLY FUND ALREADY ESTABLISHED CLINS. |
| 2025-09-11 | P00132 | Funding only | $67.1K | FRKS: INCREMENTAL FUNDING MOD OF ALREADY ESTABLISHED CLINS |
| 2025-09-08 | P00131 | Funding only | $435.8K | INCREMENTALLY FUND ALREADY ESTABLISHED CLINS FOR OY3. |
| 2025-08-27 | P00130 | Funding only | $20.0K | EAGLE: INCREMENTALLY FUND ALREADY ESTABLISHED CONTRACT LINE ITEM NUMBERS. |
| 2025-08-21 | P00129 | Funding only | $699.0K | EAGLE: FRKS INCREMENTALLY FUND ALREADY ESTABLISHED CONTRACT LINE ITEM NUMBERS |
| 2025-08-14 | P00128 | Funding only | $707.1K | INCREMENTALLY FUND ALREADY ESTABLISHED CLINS. |
| 2025-08-04 | P00127 | Funding only | $81.5K | INCREMENTALLY FUND ALREADY ESTABLISHED CLINS. |
| 2025-07-23 | P00126 | Funding only | $1.02M | THE PURPOSE OF MODIFICATION P00126 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY3 CLINS, UPDATED PSC FROM R706 TO J025, AND UPDATE CLIN QUANTITIES TO BE IN COMPLIANCE WITH DFARS PGI 204.7103(D)(II). |
| 2025-05-27 | P00125 | Funding only | $2.06M | THE PURPOSE OF MODIFICATION P00125 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY3 CLINS. |
| 2025-05-08 | P00124 | Funding only | $722.7K | THE PURPOSE OF MODIFICATION P00124 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY3 CLINS FOR CONTINUED PERFORMANCE. |
| 2025-04-22 | P00123 | Funding only | $655.2K | THE PURPOSE OF MODIFICATION P00123 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY3 CLINS FOR CONTINUED PERFORMANCE AND CORRECT OY3 CLIN QUANTITIES. |
| 2025-04-16 | P00122 | Funding only | $85.3K | THE PURPOSE OF MODIFICATION P00122 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY3 CLINS FOR CONTINUED PERFORMANCE AND CORRECT CLIN QUANTITIES. |
| 2025-04-07 | P00121 | Funding only | -$538.2K | THE PURPOSE OF MODIFICATION P00121 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY3 CLINS FOR CONTINUED PERFORMANCE AND DEOBLIGATE OY2 CLIN FUNDS FOR REUTILIZATION. |
| 2025-03-20 | P00120 | Funding only | $152.4K | THE PURPOSE OF MODIFICATION P00120 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY3 CLINS FOR CONTINUED PERFORMANCE. |
| 2025-03-13 | P00119 | Funding only | $193.2K | THE PURPOSE OF MODIFICATION P00119 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY3 CLINS FOR CONTINUED PERFORMANCE. |
| 2025-03-12 | P00118 | Funding only | $27.2K | THE PURPOSE OF MODIFICATION P00118 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY2 CLINS FOR CONTINUED PERFORMANCE. |
| 2025-03-10 | P00117 | Funding only | $15.0K | THE PURPOSE OF MODIFICATION P00117 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY3 CLIN 3007FA FOR CONTINUED PERFORMANCE. |
| 2025-02-28 | P00116 | Change order | $137.5K | THE PURPOSE OF MODIFICATION P00116 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO DEFINITIZE THE UCO FOR 1ID DS-PMCS, CORRECT CLERICAL ERRORS IN SECTION A NARRATIVE, AND TO INCREMENTALLY FUND OY2 & OY3 CLINS FOR CONTINUED PERFORMANCE. |
| 2025-02-12 | P00115 | Funding only | $9.9K | THE PURPOSE OF MODIFICATION P00115 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO CORRECT THE SECTION A NARRATIVE IN MODIFICATION P00113 AND TO DEOBLIGATE & INCREMENTALLY FUND OY2 CLINS FOR CONTINUED PERFORMANCE. |
| 2025-01-23 | P00114 | Funding only | $592.8K | THE PURPOSE OF MODIFICATION P00114 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO ESTABLISH & INCREMENTALLY FUND OY3 CLINS FOR CONTINUED PERFORMANCE AND TO CORRECT THE NARRATIVE IN MODIFICATION P00113. |
| 2025-01-17 | P00113 | Change order | $6.63M | THE PURPOSE OF MODIFICATION P00113 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY3 CLINS FOR CONTINUED PERFORMANCE, DESCOPE CLIN 2007BA, DESCOPE CLIN 2011AA, AND REALIGN 3 FTES FROM CLIN 2011AA TO CLIN 3004LA. |
| 2025-01-16 | P00112 | Funding only | -$11.0K | THE PURPOSE OF MODIFICATION P00112 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO DEOBLIGATE OY3 CLIN 3002CA. |
| 2025-01-15 | P00111 | Option exercised | $3.38M | THE PURPOSE OF MODIFICATION P00111 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO EXERCISE OPTION PERIOD 3 AND INCORPORATE AN UPDATED WAGE DETERMINATION. |
| 2025-01-02 | P00110 | Funding only | $134.7K | EAGLE FRKS OY2 INCREMENTAL FUNDING |
| 2024-12-10 | P00109 | Funding only | $97.0K | THE PURPOSE OF MODIFICATION P00109 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY2 CLIN 2012EB FOR CONTINUED PERFORMANCE AND UPDATE THE GFP ATTACHMENT. |
| 2024-11-25 | P00108 | Funding only | $299.1K | THE PURPOSE OF MODIFICATION P00108 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND VARIOUS OY2 CLINS FOR CONTINUED PERFORMANCE. |
| 2024-11-22 | P00107 | Funding only | -$36.0K | THE PURPOSE OF MODIFICATION P00107 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO DEOBLIGATE FUNDING FOR AN OY2 CLIN. |
| 2024-11-20 | P00106 | Funding only | $354.3K | THE PURPOSE OF MODIFICATION P00106 ON CONTRACT W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO INCREMENTALLY FUND OY2 CLINS FOR CONTINUED SERVICES. |
| 2024-11-06 | P00105 | Funding only | $82.4K | THE PURPOSE OF MODIFICATION P00105 IS TO INCREMENTALLY FUND VARIOUS OY2 CLINS IN THE AMOUNT OF 82,388.95. |
| 2024-10-28 | P00104 | Funding only | $92.6K | THE PURPOSE OF MODIFICATION P00104 IS TO INCORPORATE A BILATERAL MODIFICATION TO ESTABLISH AND INCREMENTALLY FUND VARIOUS OY2 CLINS IN THE AMOUNT OF 92,642.68. |
| 2024-10-22 | P00103 | Funding only | $460.6K | THE PURPOSE OF MODIFICATION P00103 IS TO INCORPORATE A BILATERAL MODIFICATION FOR ADMINISTRATIVE CHANGES AND INCREMENTAL FUNDING IN THE AMOUNT OF 460,618.19. THE PERIOD OF PERFORMANCE FOR THIS REQUIREMENT IS 28 JANUARY 2024 TO 27 JANUARY 2025. |
| 2024-10-18 | P00102 | Funding only | $920.5K | MODIFICATION P00102 WILL INCREMENTALLY FUND OY CLINS FOR CONTINUED MISSION ESSENTIAL SERVICES FOR EAGLE FRKS. |
| 2024-10-18 | P00101 | Funding only | $25.0K | THE PURPOSE OF W52P1J18G0041 W52P1J22F0014 P00101 IS TO UPDATE THE PWS. |
| 2024-09-04 | P00100 | Funding only | $75.5K | THE PURPOSE OF W52P1J18G0041 W52P1J22F0014 P00100 IS TO INCREMENTALLY FUND OY2 CLINS. |
| 2024-09-03 | P00099 | Administrative change | $0 | THE PURPOSE OF W52P1J18G0041 W52P1J22F0014 P00099 IS TO CORRECT THE "ADMINISTERED BY" OFFICE CODE AND NAME IN MODIFICATIONS P00094, P00095, P00096, P00097, AND P00098 FROM S1002A TO W519TC. |
| 2024-08-23 | P00098 | Funding only | $114.0K | MODIFICATION P00098 W52P1J18G0041 W52P1J22F0014 WILL INCREMENTALLY FUND OY2 CLINS FOR CONTINUED SERVICES. |
| 2024-08-22 | P00097 | Funding only | -$34.9K | MODIFICATION P00097 W52P1J18G0041 W52P1J22F0014 WILL DE-OBLIGATE FUNDS FOR OY2 CLIN FOR CONTINUED SERVICES, CORRECT MISTAKES FROM SECTION A NARRATIVE IN P00096, AND UPDATE PROVISIONAL BILLING RATES FOR FY24. |
| 2024-08-14 | P00096 | Funding only | $440.0K | MODIFICATION P00096 EAGLE W52P1J-18-G-0041 / W52P1J-22-F-0014 WILL INCREMENTALLY FUND CLINS FOR OY2 CLIN FOR CONTINUED SERVICES AND ALSO CORRECT A MISTAKE FROM PREVIOUS MODIFICATIONS TO THE PAY OFFICE DODACC. |
| 2024-08-01 | P00095 | Funding only | $1.26M | MODIFICATION P00095 EAGLE W52P1J-18-G-0041 / W52P1J-22-F-0014 WILL INCREMENTALLY FUND OY2 CLIN FOR CONTINUED SERVICES. |
| 2024-07-31 | P00094 | Funding only | -$1.55M | MODIFICATION P00094 EAGLE W52P1J-18-G-0041 / W52P1J-22-F-0014 WILL DE-OBLIGATE CLINS FOR OY1 AND UPDATE THE GFP ATTACHMENT. |
| 2024-07-11 | P00093 | Funding only | $1.95M | MODIFICATION P00093 EAGLE W52P1J-18-G-0041 / W52P1J-22-F-0014 WILL INCREMENTALLY FUND OY2 CLIN FOR CONTINUED SERVICES. |
| 2024-07-09 | P00092 | Supplemental agreement (work within scope) | $492.1K | MODIFICATION P00092 EAGLE W52P1J-18-G-0041 / W52P1J22F0014 TO INCORPORATE UCO FOR NEW OY2 CLIN FOR CONTINUED SERVICES. |
| 2024-07-08 | P00091 | Administrative change | $0 | THE PURPOSE OF P00091 TO W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO PROVIDE CORRECTIVE LANGUAGE TO P00088 SECTION A NARRATIVE, P00089 SECTION A NARRATIVE, AND P00090 SECTION A NARRATIVE. |
| 2024-07-02 | P00090 | Funding only | $20.0K | MODIFICATION P00090 EAGLE W52P1J-18-G-0041 / W52P1J-22-F-0014 WILL INCREMENTALLY FUND OY2 CLIN FOR CONTINUED SERVICES. |
| 2024-06-27 | P00089 | Funding only | $150.0K | MODIFICATION P00089 TO EAGLE W52P1J-18-G-0041 / W52P1J22F0014 WILL INCREMENTALLY FUND OY2 CLINS FOR CONTINUED SERVICES. |
| 2024-06-21 | P00088 | Funding only | $5.8K | MODIFICATION P00088 EAGLE W52P1J-18-G-0041 / W52P1J-22-F-0014 WILL INCREMENTALLY FUND OY2 CLIN FOR CONTINUED SERVICES. |
| 2024-06-18 | P00087 | Funding only | $1.00M | MODIFICATION P00087 EAGLE W52P1J-18-G-0041 / W52P1J22F0014 WILL INCREMENTALLY FUND OY2 CLIN FOR CONTINUED SERVICES. |
| 2024-05-31 | P00086 | Funding only | $300.0K | MODIFICATION P00086 EAGLE W52P1J-18-G-0041 / W52P1J22F0014 WILL INCREMENTALLY FUND OY2 CLIN FOR CONTINUED SERVICES. |
| 2024-05-14 | P00085 | Funding only | $1.06M | MODIFICATION P00085 EAGLE W52P1J-18-G-0041 / W52P1J-22-F-0014 WILL INCREMENTALLY FUND OY2 CLIN FOR CONTINUED SERVICES. |
| 2024-04-19 | P00084 | Funding only | $77.8K | MODIFICATION P00084 EAGLE W52P1J-18-G-0041 / W52P1J22F0014 WILL INCREMENTALLY FUN OY2 CLIN FOR CONTINUED SERVICES. |
| 2024-04-18 | P00083 | Funding only | $1.03M | MODIFICATION P00083 EAGLE W52P1J18G0041 / W52P1J22F0014 WILL INCREMENTALLY FUND OY2 CLINS FOR CONTINUED SERVICES. |
| 2024-04-17 | P00082 | Funding only | $30.0K | EAGLE FT. RILEY BILATERAL MODIFICATION P00082 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO INCREMENTALLY FUND OY2 CLINS. |
| 2024-04-10 | P00081 | Funding only | $752.1K | EAGLE FT. RILEY BILATERAL MODIFICATION P00081 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO INCREMENTALLY FUN OY2 CLINS. |
| 2024-04-04 | P00080 | Funding only | $656.9K | EAGLE FT. RILEY BILATERAL MODIFICATION P00080 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO INCREMENTALLY FUND OY2 CLINS AND UPDATE SECTION C NCR/CAR LANGUAGE. |
| 2024-03-22 | P00079 | Funding only | $48.7K | EAGLE FT. RILEY BILATERAL MODIFICATION P00079 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO INCREMENTALLY FUND OY2 CLIN AND UPDATE SECTION C NCR/CAR LANGUAGE. |
| 2024-03-15 | P00078 | Funding only | $79.0K | EAGLE FT. RILEY BILATERAL MODIFICATION P00078 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO INCREMENTALLY FUND OY2 CLIN AND UPDATE SECTION C NCR/CAR LANGUAGE. |
| 2024-02-22 | P00077 | Funding only | $3.1K | EAGLE FT. RILEY BILATERAL MODIFICATION P00077 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO INCREMENTALLY FUND OPTION PERIOD 2 CLIN. |
| 2024-02-12 | P00076 | Funding only | $47.6K | EAGLE FT. RILEY BILATERAL MODIFICATION P00076 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO INCREMENTALLY FUND OPTION PERIOD 2 CLINS. |
| 2024-02-08 | P00075 | Funding only | $808.0K | EAGLE FT. RILEY BILATERAL MODIFICATION P00075 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO ESTABLISH AND INCREMENTALLY FUND OPTION PERIOD 2 CLINS. |
| 2024-02-07 | P00074 | Funding only | $954.3K | EAGLE FT. RILEY BILATERAL MODIFICATION P00074 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO INCREMENTALLY FUND OPTION PERIOD 2 CLINS. |
| 2024-02-05 | P00073 | Funding only | -$798.0K | EAGLE FT. RILEY BILATERAL MODIFICATION P00073 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO DE-OBLIGATE OPTION PERIOD 2 CLINS 2012AA & 2012CA. |
| 2024-02-01 | P00072 | Funding only | $7.8K | EAGLE FT. RILEY BILATERAL MODIFICATION P00072 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO INCREMENTALLY FUND OPTION PERIOD 1 CLIN. |
| 2024-01-30 | P00071 | Funding only | $42.2K | EAGLE FT. RILEY BILATERAL MODIFICATION P00071 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO ESTABLISH AND INCREMENTALLY FUND OPTION PERIOD 2 CLINS AND DE-OBLIGATE OY1 CLIN. |
| 2024-01-26 | P00070 | Funding only | $8.6K | EAGLE FT. RILEY BILATERAL MODIFICATION P00070 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO ESTABLISH AND INCREMENTALLY FUND OPTION PERIOD 2 CLIN. |
| 2024-01-19 | P00069 | Funding only | $1.42M | EAGLE FT. RILEY BILATERAL MODIFICATION P00069 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO INCREMENTALLY FUND CLINS FOR OPTION PERIOD 2. |
| 2024-01-17 | P00068 | Option exercised | $6.04M | EAGLE FT. RILEY BILATERAL MODIFICATION P00068 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO EXERCISE OPTION PERIOD 2. |
| 2023-12-19 | P00067 | Funding only | $5.9K | EAGLE FT. RILEY UNILATERAL MODIFICATION P00067 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO INCREMENTALLY FUND CLIN 1005DB FOR OPTION YEAR 1. |
| 2023-12-14 | P00066 | Supplemental agreement (work within scope) | $24.6K | EAGEL FT. RILEY BILATERAL MODIFICATION P00066 TO W52P1J-18-G-0041 TASK ORDER W52P1J22F0014 IS TO ESTABLISH AND FUND CLINS 1007 EB AND 1007FB 1ID FOR OPTION YEAR 1. |
| 2023-12-08 | P00065 | Change order definitized | $31.8K | THIS IS A BILATERAL CHANGE ORDER UNDER THE AUTHORITY FAR 52.243-2 ALT I CHANGES-COST REIMBURSE TO DEFINITIZE UCA UNDER PRIOR MODIFICATION P00043 & INCREMENTALLY FUND OPTION YEAR 1 CLINS FOR CONTINUED SERVICES. |
| 2023-11-22 | P00064 | Funding only | $10.0K | EAGLE FORT RILEY BILATERAL MODIFICATION P00064 TO W52P1J-18-G-0041 TASK ORDER W52P1J-22-F-0014 IS TO ESTABLISH AND FUND CLIN 1007DB 1ID FOR OPTION YEAR 1. |
| 2023-11-17 | P00063 | Funding only | $311.1K | MODIFICATION P0005 INCREMENTALLY FUNDS CLIN FOR OPTION YEAR 1 FOR FT. RILEY. |
| 2023-11-07 | P00062 | Funding only | $799.1K | ADD INCREMENTAL FUNDING WITHIN SCOPE AND ESTABLISH NEW CLINS FOR OPTION YEAR 1. |
| 2023-10-23 | P00061 | Supplemental agreement (work within scope) | $52.3K | ADDING INCREMENTAL FUNDING WITHIN SCOPE. |
| 2023-10-17 | P00060 | Supplemental agreement (work within scope) | $7.7K | ADD INCREMENTAL FUNDING AND ADD NEW GFP ATTACHMENT. |
| 2023-09-28 | P00059 | Supplemental agreement (work within scope) | $1.48M | ADDING INCREMENTAL FUNDING WITHIN SCOPE. |
| 2023-09-25 | P00058 | Supplemental agreement (work within scope) | $627.0K | ADDING INCREMENTAL FUNDING AND UPDATED GFP ATTACHMENT WITHIN SCOPE. |
| 2023-09-12 | P00057 | Supplemental agreement (work within scope) | $28.9K | ADDING INCREMENTAL FUNDING WITHIN SCOPE. |
| 2023-09-11 | P00056 | Supplemental agreement (work within scope) | $329.7K | NEW REQUIREMENT WITHIN SCOPE. |
| 2023-09-07 | P00055 | Supplemental agreement (work within scope) | $2 | RE-OBLIGATE FUNDING TO CLIN 0014AA DUE TO GFEBS ERROR. |
| 2023-08-28 | P00053 | Supplemental agreement (work within scope) | $48.0K | ADDING NEW 1ID NTV-CAT REQUIREMENT WITHIN SCOPE |
| 2023-08-24 | P00054 | Supplemental agreement (work within scope) | $307.8K | ADDING INCREMENTAL FUNDING WITHIN SCOPE. |
| 2023-08-21 | P00052 | Supplemental agreement (work within scope) | -$3.88M | DE-OBLIGATE EXCESS BY FUNDS, AND DEFINITIZE RFP 1, BY & OY1 REBASELINE PROPOSALS. |
| 2023-08-08 | P00051 | Supplemental agreement (work within scope) | $341.0K | ADDING INCREMENTAL FUNDING WITHIN SCOPE. |
| 2023-08-07 | P00050 | Supplemental agreement (work within scope) | $18.0K | ADDING INCREMENTAL FUNDING WITHIN SCOPE. |
| 2023-07-24 | P00049 | Supplemental agreement (work within scope) | $1.57M | TO ADD INCREMENTAL FUNDING AND UPDATED GFP ATTACHMENT. |
| 2023-06-29 | P00048 | Supplemental agreement (work within scope) | $474.1K | ADD INCREMENTAL FUNDING,ADDING FAR CLAUSE 52.245-2, CHANGING CONTRACTOR OFFICE ADDRESS. |
| 2023-06-09 | P00047 | Supplemental agreement (work within scope) | $626.8K | ADDING INCREMENTAL FUNDING. |
| 2023-06-09 | P00046 | Supplemental agreement (work within scope) | $102.2K | ADD INCREMENTAL FUNDING. |
| 2023-05-10 | P00045 | Supplemental agreement (work within scope) | $292.8K | ADD INCREMENTAL FUNDING. |
| 2023-05-04 | P00044 | Supplemental agreement (work within scope) | $457.0K | ADDING INCREMENTAL FUNDING. |
| 2023-04-27 | P00043 | Supplemental agreement (work within scope) | $879.0K | MODIFICATION TO ADD INCREMENTAL FUNDING AND UCO FOR 1ID 1ABCT SBE-MT. |
| 2023-04-06 | P00042 | Supplemental agreement (work within scope) | -$103.4K | DE-OBLIGATE FUNDING FROM CLIN 1005EA. |
| 2023-04-03 | P00041 | Supplemental agreement (work within scope) | $516.8K | ADDING INCREMENTAL FUNDING WITHIN SCOPE. |
| 2023-03-21 | P00040 | Supplemental agreement (work within scope) | $854.5K | ADD INCREMENTAL FUNDS. |
| 2023-03-07 | P00039 | Supplemental agreement (work within scope) | $66.9K | DE-OBLIGATE EXCESS FUNDS FROM FY22. |
| 2023-02-22 | P00038 | Supplemental agreement (work within scope) | $2.34M | ADDING INCREMENTAL FUNDING. |
| 2023-02-08 | P00037 | Supplemental agreement (work within scope) | $329.4K | RE-OBLIGATE FUNDS AND ADD INCREMENTAL FUNDS. |
| 2023-02-03 | P00036 | Supplemental agreement (work within scope) | $1.31M | ADDING INCREMENTAL FUNDING WITHIN SCOPE. |
| 2023-02-02 | P00035 | Supplemental agreement (work within scope) | -$293.4K | DE-OBLIGATE EXCESS FUNDS AND FIX CONTRACT TYPE FOR CLINS. |
| 2023-02-01 | P00034 | Supplemental agreement (work within scope) | -$971.4K | INCREMENTAL FUNDING MOD. |
| 2023-01-25 | P00033 | Supplemental agreement (work within scope) | $1.83M | INCREMENTAL FUNDING MOD WITHIN SCOPE. |
| 2023-01-23 | P00032 | Supplemental agreement (work within scope) | $686.6K | ADDING INCREMENTAL FUNDING. |
| 2023-01-17 | P00031 | Supplemental agreement (work within scope) | $4.63M | INCREMENTAL FUNDING FOR OY1. |
| 2022-12-22 | P00030 | Supplemental agreement (work within scope) | $100.0K | ADDING INCREMENTAL FUNDING. |
| 2022-12-19 | P00029 | Supplemental agreement (work within scope) | -$100.0K | DE-OBLIGATING FUNDS FROM CLIN 0003AB. |
| 2022-11-18 | P00028 | Administrative change | $0 | RENAME CLIN 0005DB. |
| 2022-11-08 | P00027 | Funding only | $225.4K | ADDING INCREMENTAL FUNDING AND UPDATING PERIOD OF PERFORMANCE FOR CLIN 0007BA AND 0007CA. |
| 2022-10-27 | P00026 | Funding only | $1.32M | ADDING INCREMENTAL FUNDING. |
| 2022-10-25 | P00024 | Funding only | $10.0K | INCREMENTAL FUNDING MOD AND UPDATING ATTACHMENT. |
| 2022-10-20 | P00023 | Supplemental agreement (work within scope) | $866.1K | FORT RILEY EAGLE TASK ORDER MOD P00023 ADDED INCREMENTAL FUNDING, UPDATED PWS, UPDATED CDRL, UPDATED GFP, UPDATED THE POP ON CERTAIN CLINS, CHANGED THE DODAAC, AND UPDATED THE WAWF CLAUSE. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-23). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗