W56HZV22F0035↗
General Dynamics Land Systems Inc. received this contract from W6QK Acc- Dta, Department of the Army: -$8.37M obligated so far for combat, assault, and tactical vehicles, wheeled. Its period of performance ended 2024-08-31.
Key facts · data as of Oct 28, 2026
- Recipient
- General Dynamics Land Systems Inc.
- Awarding agency
- Department of the Army (Department of Defense)
- Contracting office
- W6QK Acc- Dta (W912CH)
- Obligated to date
- -$8.37M
- Potential value
- $526.78M
- Ends
- 2024-08-31
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 28, 2026.
Cite this page: SpendQuery, Award W56HZV22F0035, data as of Oct 28, 2026, https://spendquery.com/award?id=CONT_AWD_W56HZV22F0035_9700_W56HZV20D0005_9700
General Dynamics Land Systems Inc.: all federal awards · Department of Defense: spending · W6QK Acc- Dta: what it buys
MODIFCATION TO AWARD 178 MAINTENANCE AND TRAINING SQUAD LEADER DISPLAY VERSION 3 UNITS IN SUPPORT OF STRYKER PRODUCTION.
What it is
- Product or service
- Combat, Assault, and Tactical Vehicles, Wheeled (PSC 2355)
- Industry
- Military Armored Vehicle, Tank, and Tank Component Manufacturing (NAICS 336992)
- Contracting office
- W6QK Acc- Dta (W912CH)
- Competition
- Not competed
- Pricing
- Fixed price incentive
- How it was bought
- Single-award IDIQ · under W56HZV20D0005
- Solicitation
- W56HZV18R0175
- Where the work is
- Macomb, MI · district MI-10
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
17 subawards totaling $2.67M (267401469.0% of what was obligated), as General Dynamics Land Systems Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Intercomp USA Inc | $813.0K | 1 | FL | 2023-07-12 | 2023-07-12 |
| Charles E. Gillman Company | $423.5K | 1 | AZ | 2022-11-29 | 2022-11-29 |
| M&E Global, LLC | $416.8K | 1 | IN | 2024-04-18 | 2024-04-18 |
| Arrow Electronics, Inc. | $215.1K | 1 | NY | 2023-11-09 | 2023-11-09 |
| Airmar Technology Corp. | $168.8K | 2 | MI | 2023-11-10 | 2023-12-08 |
| BTC Electronic Components, LLC | $126.3K | 1 | NC | 2023-11-21 | 2023-11-21 |
| Digital Systems Engineering Inc | $109.1K | 1 | AZ | 2023-03-02 | 2023-03-02 |
| Sabre-Tec Inc | $74.3K | 1 | MI | 2023-11-07 | 2023-11-07 |
| Bay Shore Steel Works LLC | $61.4K | 1 | MI | 2023-09-01 | 2023-09-01 |
| QT Group Oyj | $46.5K | 1 | CA | 2023-11-06 | 2023-11-06 |
| Noel-Smyser Engineering Corporation | $44.0K | 1 | IN | 2023-03-18 | 2023-03-18 |
| Yarde Metals, Inc. | $41.3K | 1 | CT | 2022-12-01 | 2022-12-01 |
| The American Tank & Fabricating Company | $36.9K | 1 | OH | 2023-07-12 | 2023-07-12 |
| Clifton Steel Co | $33.1K | 1 | OH | 2023-07-25 | 2023-07-25 |
| Dontech Inc | $33.0K | 1 | PA | 2024-08-21 | 2024-08-21 |
| Safran Electrical Components Canada Inc | $31.0K | 1 | 2024-04-26 | 2024-04-26 |
The largest single subawards
| Date | To | Amount | For |
|---|---|---|---|
| 2023-07-12 | Intercomp USA Inc | $813.0K | OTHER ELECTRONIC PARTS AND EQUIPMENT MERCHANT WHOLESALERS |
| 2022-11-29 | Charles E. Gillman Company | $423.5K | CURRENT-CARRYING WIRING DEVICE MANUFACTURING |
| 2024-04-18 | M&E Global, LLC | $416.8K | GOODS AND/OR SERVICES |
| 2023-11-09 | Arrow Electronics, Inc. | $215.1K | OTHER ELECTRONIC PARTS AND EQUIPMENT MERCHANT WHOLESALERS |
| 2023-11-21 | BTC Electronic Components, LLC | $126.3K | ELECTRONIC CONNECTOR MANUFACTURING |
| 2023-03-02 | Digital Systems Engineering Inc | $109.1K | COMPUTER TERMINAL AND OTHER COMPUTER PERIPHERAL EQUIPMENT MANUFACTURING |
| 2023-11-10 | Amphenol Borisch Technologies, Inc | $90.4K | PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING |
| 2023-12-08 | Amphenol Borisch Technologies, Inc | $78.4K | GOODS AND/OR SERVICES |
| 2023-11-07 | Sabre-Tec Inc | $74.3K | MILITARY ARMORED VEHICLE, TANK, AND TANK COMPONENT MANUFACTURING |
| 2023-09-01 | Bay Shore Steel Works LLC | $61.4K | MILITARY ARMORED VEHICLE, TANK, AND TANK COMPONENT MANUFACTURING |
| 2023-11-06 | The QT Company | $46.5K | COMPUTER AND COMPUTER PERIPHERAL EQUIPMENT AND SOFTWARE MERCHANT WHOLESALERS |
| 2023-03-18 | Noel-Smyser Engineering Corporation | $44.0K | INSTRUMENTS AND RELATED PRODUCTS MANUFACTURING FOR MEASURING, DISPLAYING, AND CONTROLLING INDUSTRIAL PROCESS VARIABLES |
| 2022-12-01 | Yarde Metals, Inc. | $41.3K | METAL SERVICE CENTERS AND OTHER METAL MERCHANT WHOLESALERS |
| 2023-07-12 | The American Tank & Fabricating Company | $36.9K | PLATE WORK MANUFACTURING |
| 2023-07-25 | Clifton Steel Co | $33.1K | PLATE WORK MANUFACTURING |
| 2024-08-21 | Dontech Inc | $33.0K | GOODS AND/OR SERVICES |
| 2024-04-26 | Safran Electrical Components Canada Inc | $31.0K | GOODS AND/OR SERVICES |
Every action
14 actions since 2023-06-07. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-23 | P00015 | Funding only | $2.51M | INCENTIVE SETTLEMENT FOR ECP1 DVH PRODUCTION |
| 2026-01-08 | P00014 | Supplemental agreement (work within scope) | -$5.7K | PROCUREMENT OF STRYKER VEHICLES IN THE DVH A1 ECP CONFIGURATION. |
| 2025-02-25 | P00013 | Funding only | -$1.8K | PROCUREMENT OF STRYKER VEHICLES IN THE DVH A1 ECP CONFIGURATION. |
| 2024-10-29 | P00012 | Supplemental agreement (work within scope) | $44.2K | PROCUREMENT OF STRYKER VEHICLES IN THE DOUBLE V HULL A1 ENGINEERING CHANGE PROPOSAL CONFIGURATION. |
| 2024-08-29 | P00010 | Supplemental agreement (work within scope) | $0 | 5TH BRIGADE PRODUCTION OF STRYKER DVHA1 VEHICLES. |
| 2024-07-02 | P00011 | Supplemental agreement (work within scope) | -$24.0K | 5TH BRIGADE PRODUCTION OF STRYKER DVHA1 VEHICLES |
| 2024-02-16 | P00009 | Supplemental agreement (work within scope) | $0 | NO COST ADMIN MOD TO CHANGE SHIP TO LOCATION FOR 1 OF THE 4 CVVS THAT ARE SCHEDULED TO DD250/SHIP ON 29 FEB 2024 FROM APG TO STERLING HEIGHT FACILITY. |
| 2024-02-05 | P00008 | Supplemental agreement (work within scope) | $0 | MODIFICATION TO REVISE DELIVERY SCHEDULE FOR LONG LEAD ITEMS. |
| 2024-01-16 | P00007 | Supplemental agreement (work within scope) | $0 | STRYKER 5BDE PRODUCTION CONTRACT |
| 2023-12-13 | P00006 | Supplemental agreement (work within scope) | $0 | STRYKER 5BDE PRODUCTION CONTRACT |
| 2023-10-31 | P00005 | Supplemental agreement (work within scope) | $0 | STRYKER 5BDE PRODUCTION CONTRACT |
| 2023-09-18 | P00004 | Supplemental agreement (work within scope) | $0 | MODIFICATION TO REVISE THE DELIVERY SCHEDULE ON CLIN 0012AA |
| 2023-07-19 | P00003 | Supplemental agreement (work within scope) | $0 | MODIFICATION TO REVISE LANGUAGE IN SECTION G. |
| 2023-06-07 | P00002 | Supplemental agreement (work within scope) | -$10.90M | MODIFICATION TO APPLY CREDIT IAW PENSION REOPENER SETTLEMENT AND ADD LANGUAGE TO SECTION G. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-28). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗