Putting the award page together from the records…
Putting the award page together from the records…
EARLY ORDER MATERIAL IN SUPPORT OF THE FUTURE PURCHASE OF 197 AMPVS AND FACILITY CAPACITY EXPANSION EFFORTS TO INCREASE THE AMPV PRODUCTION RATE TO 197 VEHICLES PER YEAR. SUPPORTS UKRAINE EFFORTS.
Up for re-bid: ends 2028-05-31. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
1772 subawards totaling $1.24B (49.9% of what was obligated), as Bae Systems Land & Armaments L.P. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Leonardo S.P.A. | $108.60M | 13 | FL | 2024-03-19 | 2025-12-16 |
| Loc Performance Products LLC | $104.29M | 50 | MI, OH | 2023-05-04 | 2025-11-26 |
| Lanzen, Incorporated | $87.00M | 187 | MI | 2023-04-10 | 2025-12-19 |
| Amz Manufacturing Corp | $77.44M | 29 | PA | 2023-04-19 | 2025-11-26 |
| Johnstown Welding & Fabrication, Inc. | $71.35M | 62 | PA | 2023-04-20 | 2025-12-10 |
| Amz Alabama Inc | $67.83M | 13 | AL | 2025-01-25 | 2025-06-30 |
| The First Electronics Corporation | $52.46M | 12 | MA | 2023-05-25 | 2025-10-24 |
| Northrop Grumman Corporation | $45.65M | 8 | AL, VA | 2024-06-28 | 2025-12-30 |
| DRS Network & Imaging Systems LLC | $43.31M | 4 | FL | 2023-05-05 | 2023-07-12 |
| Altex Technologies Corporation | $35.05M | 6 | CA | 2023-06-01 | 2025-10-25 |
| Real-Time Laboratories, LLC | $32.35M | 5 | FL | 2023-09-26 | 2025-09-13 |
| Air Methods Corporation | $30.37M | 2 | CO | 2023-05-05 | 2024-03-20 |
| Leading Technology Composites, Inc | $29.53M | 6 | KS | 2023-10-02 | 2025-11-05 |
| American Tooling Center Inc | $27.73M | 23 | MI | 2023-04-19 | 2025-12-11 |
| I3 Assembly LLC | $25.35M | 10 | NY | 2023-05-25 | 2025-11-19 |
| General Dynamics Corp | $25.26M | 15 | AZ | 2023-07-21 | 2025-12-06 |
| Asp Amc Intermediate Holdings, Inc. | $20.83M | 3 | CO | 2024-11-18 | 2025-10-10 |
| Northrop Grumman Systems Corporation | $18.00M | 2 | AL | 2023-07-03 | 2023-10-26 |
| Peacock Industries, Inc. | $17.15M | 62 | MI | 2023-05-05 | 2025-12-02 |
| Greene Metal Products, Inc. | $16.91M | 120 | MI | 2023-04-11 | 2025-12-04 |
| International Parts Supply Corporation | $15.62M | 6 | MN | 2023-06-19 | 2025-10-10 |
| Rochester Welding Company, Inc. | $13.82M | 53 | MI | 2023-04-10 | 2025-12-05 |
| York Electro Mechanical Corp | $13.72M | 63 | PA | 2023-04-20 | 2025-12-24 |
| Crane Pumps & Systems PFT Corp | $13.59M | 5 | OH | 2023-08-17 | 2025-06-19 |
| Espey MFG and Electronics Corp | $12.95M | 7 | NY | 2023-05-30 | 2025-07-28 |
The 25 largest of 185; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2025-08-03 | DRS Network & Imaging Systems LLC | $56.58M | MATERIAL/SERVICE |
| 2023-07-12 | DRS Network & Imaging Systems LLC | $33.33M | MATERIAL |
| 2024-06-14 | DRS Network & Imaging Systems LLC | $32.67M | MATERIAL |
| 2025-10-21 | Amz Manufacturing Corp | $25.27M | MATERIAL |
| 2025-12-30 | Northrop Grumman Systems Corporation | $21.03M | MATERIAL/SERVICE |
| 2025-09-27 | The First Electronics Corporation | $20.45M | MATERIAL |
| 2023-06-13 | Amz Manufacturing Corp | $19.56M | MATERIAL |
| 2024-06-10 | Amz Manufacturing Corp | $19.18M | MATERIAL |
| 2024-10-02 | Lanzen, Incorporated | $18.28M | MATERIAL |
| 2023-06-01 | Lanzen, Incorporated | $18.22M | MATERIAL |
| 2023-07-03 | Northrop Grumman Systems Corporation | $17.35M | MATERIAL |
| 2023-06-15 | JWF Defense Systems, LLC | $16.09M | MATERIAL |
| 2024-03-20 | Air Methods, LLC | $15.75M | MATERIAL |
| 2025-06-30 | Amz Alabama Inc | $15.45M | MATERIAL |
| 2024-10-04 | JWF Defense Systems, LLC | $15.41M | MATERIAL |
| 2024-07-11 | Northrop Grumman Systems Corporation | $15.26M | MATERIAL |
| 2024-12-05 | Loc Performance Products LLC | $14.73M | MATERIAL |
| 2023-05-05 | Air Methods, LLC | $14.62M | MATERIAL/SERVICE |
| 2025-04-22 | Air Methods, LLC | $14.54M | MATERIAL/SERVICE |
| 2023-05-25 | The First Electronics Corporation | $13.94M | MATERIAL |
| 2024-04-11 | The First Electronics Corporation | $13.40M | MATERIAL |
| 2025-02-21 | Amz Alabama Inc | $12.23M | MATERIAL |
| 2025-09-13 | Real-Time Laboratories, LLC | $12.17M | MATERIAL/SERVICE |
| 2025-05-05 | Altex Technologies Corporation | $12.00M | MATERIAL/SERVICE |
| 2025-11-05 | Leading Technology Composites, Inc | $11.38M | MATERIAL |
48 actions since 2023-03-03. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-07 | P00049 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2026-07-01 | P00048 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2026-05-28 | P00047 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2026-03-25 | P00046 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2026-02-06 | P00044 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-12-17 | P00043 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-12-05 | P00041 | Supplemental agreement (work within scope) | $198.42M | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT) |
| 2025-11-24 | P00042 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-10-30 | P00040 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-10-30 | P00038 | Change order | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT) |
| 2025-09-30 | P00039 | Change order | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-09-25 | P00037 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-09-17 | P00036 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT) |
| 2025-09-05 | P00035 | Supplemental agreement (work within scope) | -$4.95M | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-08-22 | P00034 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT) |
| 2025-08-05 | P00032 | Supplemental agreement (work within scope) | -$358.0K | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-08-01 | P00033 | Supplemental agreement (work within scope) | $139.60M | UKRAINE - THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT) |
| 2025-06-27 | P00031 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT) |
| 2025-06-11 | P00030 | Change order | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT) |
| 2025-06-10 | P00029 | Supplemental agreement (work within scope) | $0 | PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-06-04 | P00028 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-05-20 | P00027 | Administrative change | $0 | THIS PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-04-30 | P00025 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIDGE COMBAT TEAM (ABCT). |
| 2025-04-08 | P00026 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-03-13 | P00024 | Supplemental agreement (work within scope) | $356.67M | UKRAINE-UNDEFINITIZED CONTRACT ACTION FOR THE PROCUREMENT OF 240 ARMORED MULTI-PURPOSE VEHICLES FOR OPTION YEAR 3. 189 OF THE 240 VEHICLES ARE BEING PROCURED TO REPLENISH GOVERNMENT AMPV STOCK FOR VEHICLES PREVIOUSLY PROCURED IN SUPPORT OF UKRAINE. |
| 2025-03-11 | P00023 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2025-02-12 | P00022 | Option exercised | $4.76M | ARMORED MULTI-PURPOSE VEHICLE (AMPV) FOLLOW-ON PRODUCTION TEST SUPPORT. ADDITIONALLY, UKRAINE: REACTIVE ARMOR KITS (LOW BACK) FOR AMPV VEHICLES |
| 2025-01-29 | P00021 | Option exercised | $19.35M | UKRAINE: PROCUREMENT OF KITS FOR ARMORED MULTI-PURPOSE VEHICLE: THIS CONTRACT MODIFICATION EXERCISES OPTION YEAR 2 ORDER FOR 197 EACH OF OY2 REACTIVE ARMOR KIT (HIGH BACK) AND OY2 COLD START KIT. |
| 2024-12-20 | P00019 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2024-12-17 | P00020 | Supplemental agreement (work within scope) | $0 | THIS PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2024-11-18 | P00017 | Administrative change | $0 | THE PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2024-09-24 | P00016 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF 442 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2024-09-20 | P00015 | Supplemental agreement (work within scope) | $184.35M | UKRAINE: THE PROCUREMENT OF A TOTAL QUANTITY OF UP TO 48 AMPVS, WHICH WILL BE ADDED ON TO THE CURRENT QUANTITY OF 197 VEHICLES FOR OPTION YEAR 2, REFERRED TO AS A TOP OFF PROVISION, UNDER THE AMPV FRP CONTRACT, W56HZV-23-C-0024. |
| 2024-09-12 | P00013 | Supplemental agreement (work within scope) | $5.79M | FULL RATE PRODUCTION ARMORED MULTI-PURPOSE VEHICLES (AMPVS) REPLACING THE AGING FLEET OF M113 VEHICLES. THIS ACTION ADDS CAPABILITIES DUE TO DESIGN UPDATES/OBSOLESCENCE ISSUES. UKRAINE |
| 2024-08-22 | P00014 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF 394 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2024-07-01 | P00011 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF 394 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2024-06-10 | P00012 | Administrative change | $0 | THE PROCUREMENT OF 394 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2024-05-01 | P00010 | Administrative change | $0 | THE PROCUREMENT OF 394 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2024-04-02 | P00009 | Supplemental agreement (work within scope) | $0 | THE PROCUREMENT OF 394 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). |
| 2024-03-13 | P00008 | Option exercised | $754.34M | UKRAINE: ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE M113 FLEET. EXERCISE OF OY2 VEHICLES TOTALING 197 AMPVS BROKEN OUT TO THE FOLLOWING VARIANTS: GENERAL PURPOSE, MEDICAL EVACUATION, MORTAR CARRIER, MISSION COMMAND, AND MEDICAL TREATMENT. |
| 2024-02-15 | P00005 | Supplemental agreement (work within scope) | $0 | ARMORED MULTI-PURPOSE VEHICLES (AMPVS) TO REPLACE THE AGING M113 FLEET OF VEHICLES. |
| 2024-02-07 | P00007 | Option exercised | $4.21M | ARMORED MULTI-PURPOSE VEHICLES (AMPV) TO REPLACE THE AGING M113 FLEET OF VEHICLES. THIS MODIFICATION EXERCISES OPTION YEAR 1 ORDER FOR 1 LO OF FIRST ARTICLE TESTS ON SELECT COMPONENTS. |
| 2024-01-31 | P00006 | Option exercised | $19.50M | UKRAINE: ARMORED MULTIPURPOSE VEHICLES (AMPVS) TO REPLACE THE AGING M113 FLEET OF VEHICLES. THIS MODIFICATION INCLUDES PROCUREMENT OF KITS FOR INSTALL ON AMPVS PRIOR TO FIELDING. |
| 2023-09-21 | P00004 | Administrative change | $0 | FULL RATE PRODUCTION OF ARMORED MULTI-PURPOSE VEHICLES (AMPVS) REPLACING THE AGING FLEET OF M113 VEHICLES. UKRAINE |
| 2023-08-31 | PZ0001 | Letter contract definitized | $432.59M | FULL RATE PRODUCTION ARMORED MULTI-PURPOSE VEHICLES (AMPVS) REPLACING THE AGING FLEET OF M113 VEHICLES. UKRAINE |
| 2023-08-03 | P00003 | Supplemental agreement (work within scope) | $119.67M | EARLY ORDER MATERIAL (EOM) IN SUPPORT OF FUTURE 197 ARMORED MULTI-PURPOSE VEHICLES (AMPVS). UKRAINE |
| 2023-06-30 | P00002 | Supplemental agreement (work within scope) | $0 | EARLY ORDER MATERIAL IN SUPPORT OF FUTURE PURCHASE OF 197 AMPVS. SUPPORTS UKRAINE EFFORTS. |
| 2023-03-03 | 0 | $245.65M | EARLY ORDER MATERIAL IN SUPPORT OF THE FUTURE PURCHASE OF 197 AMPVS AND FACILITY CAPACITY EXPANSION EFFORTS TO INCREASE THE AMPV PRODUCTION RATE TO 197 VEHICLES PER YEAR. SUPPORTS UKRAINE EFFORTS. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗