PHASE 3 AND 4 DEVELOPMENT WITH 7 PROTOTYPE DELIVERABLES OF THE OPTIONALLY MANNED FIGHTING VEHICLE.
Up for re-bid: ends 2027-12-25. Recompete brief → · Solicitation: Parts Kit, Hydraulic Pump ( NSN: 4320-01-086-6793) ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
25 subawards totaling $280.43M (40.2% of what was obligated), as American Rheinmetall Vehicles, LLC reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| L3Harris Technologies, Inc | $79.26M | 1 | FL | 2023-07-11 | 2023-07-11 |
| Allison Transmission Holdings, Inc. | $35.27M | 1 | IN | 2023-12-21 | 2023-12-21 |
| American Rheinmetall Defense, Inc. | $32.33M | 2 | ME | 2023-10-10 | 2023-10-16 |
| Rockwell Collins Australia Pty Limited | $29.27M | 1 | AZ | 2023-11-22 | 2023-11-22 |
| Textron Inc | $27.43M | 1 | MD | 2023-06-28 | 2023-06-28 |
| General Dynamics - Ots, Inc. | $16.27M | 1 | ME | 2024-02-15 | 2024-02-15 |
| Anduril Industries Inc. | $16.00M | 1 | CA | 2023-08-31 | 2023-08-31 |
| Liebherr Machines Bulle Sa | $15.63M | 1 | 2024-02-15 | 2024-02-15 | |
| Koninklijke Ten Cate, B.V. | $5.82M | 1 | OH | 2024-11-27 | 2024-11-27 |
| Oasis Advanced Engineering, Inc. | $5.65M | 1 | MI | 2023-08-24 | 2023-08-24 |
| Soucy International Inc | $3.32M | 1 | 2024-07-25 | 2024-07-25 | |
| Everaxis USA, Inc. | $2.37M | 1 | FL | 2024-06-10 | 2024-06-10 |
| Elta Systems LTD | $1.75M | 1 | 2024-08-26 | 2024-08-26 | |
| Crane Electronics, Inc. | $1.73M | 1 | FL | 2024-07-12 | 2024-07-12 |
| Nobles Worldwide, Inc. | $1.49M | 1 | WI | 2023-11-08 | 2023-11-08 |
| Mahle Industrial Thermal Systems America LP | $1.48M | 1 | MI | 2024-04-02 | 2024-04-02 |
| Beth-El Industries LTD | $1.30M | 1 | 2024-09-26 | 2024-09-26 | |
| Donaldson Company, Inc. | $1.16M | 1 | MN | 2024-10-31 | 2024-10-31 |
| Chickasaw Nation | $895.5K | 1 | NC | 2023-06-27 | 2023-06-27 |
| Ravelin Defense, Inc. | $645.6K | 1 | AZ | 2024-05-24 | 2024-05-24 |
| Thyssenkrupp Rothe Erde USA Inc. | $563.7K | 1 | OH | 2024-02-15 | 2024-02-15 |
| Thermoanalytics, Inc. | $399.4K | 1 | MI | 2024-02-22 | 2024-02-22 |
| Great Lakes Sound & Vibration Inc | $380.3K | 1 | MI | 2024-06-18 | 2024-06-18 |
| Scioteq LLC | $40.3K | 1 | GA | 2024-07-30 | 2024-07-30 |
| Date | To | Amount | For |
|---|---|---|---|
| 2023-07-11 | L3Harris Technologies, Inc. | $79.26M | SIGHTS, DISPLAYS, COMMON COMPUTE, RADIOS |
| 2023-12-21 | Allison Transmission Inc | $35.27M | PROVIDING AN EGEN FORCE ELECTRIC HYBRID PROPULSION SYSTEM FOR INTEGRATION INTO THE XM30 VEHICLE |
| 2023-10-16 | American Rheinmetall Systems LLC | $32.21M | 360SA, WEAPON CONTROL UNIT, SIGHT SLAVE ARMAMENT, FIRE CONTROL, COAX SOFTMOUNT |
| 2023-11-22 | Raytheon Company | $29.27M | MISSILE LAUNCHER |
| 2023-06-28 | Textron Systems Corporation | $27.43M | TEXTRON PROVIDES AMERICAN RHEINMETALL THE HULL WELDMENT BH&T1 AND BDH&T2, HULL WELDMENT P1- P7, PROTOTYPE SYSTEMS SUPPORT PACKAGE (SSP) SUPPORT, PROTOTYPE TESTING FSR SUPPORT, XM30 INTEGRATION, ASSY, TEST, CHECKOUT… |
| 2024-02-15 | General Dynamics - Ots, Inc. | $16.27M | IRON FIST |
| 2023-08-31 | Anduril Industries, Inc. | $16.00M | COMMON TACTICAL PICTURE (CTP) |
| 2024-02-15 | Liebherr Machines Bulle Sa | $15.63M | DESIGN AND DEVELOPMENT PLUS DELIVERY OF PROTOTYPE ENGINES FOR THE POWERPACK OF XM30 |
| 2024-11-27 | Integris Composites, Inc. | $5.82M | ARMOR FOR THE XM30 PROGRAM. |
| 2023-08-24 | Oasis Advanced Engineering, Inc. | $5.65M | EMBEDDED TRAINING |
| 2024-07-25 | Soucy International Inc | $3.32M | DEVELOPMENT AND DESIGN ADAPTATION FOR A COMPOSITE RUBBER TRACK SYSTEM FOR THE XM30 ARV VEHICLE B. PRODUCTION TOOLING FOR COMPOSITE RUBBER TRACK / SPROCKET / IDLER WHEEL C. 1 VS CRT SYSTEM FOR ATR (DEVELOPMENT ASSET)… |
| 2024-06-10 | Everaxis USA, Inc. | $2.37M | SLIP RING |
| 2024-08-26 | Elta Systems LTD | $1.75M | STORMGUARD AND OTHELLO RADAR |
| 2024-07-12 | Crane Electronics, Inc. | $1.73M | POWER CONVERTER. |
| 2023-11-08 | Nobles Worldwide, Inc. | $1.49M | AMMUNITION HANDLING SYSTEM |
| 2024-04-02 | Mahle Industrial Thermal Systems America LP | $1.48M | ENGINE COOLING PACKAGE/SYSTEM FOR THE XM30, NON-RECURRING ENGINEERING, AND NON-RECURRING PROTOTYPE TOOLING |
| 2024-09-26 | Beth-El Industries LTD | $1.30M | DELIVERY OF QUANTITY 11 EPCS 200 VM 11 COMBINED CBRN/HVAC SYSTEMS |
| 2024-10-31 | Donaldson Company, Inc. | $1.16M | FILTRATION SOLUTIONS FOR GROUND VEHICLES & EQUIPMENT |
| 2023-06-27 | Corvid Technologies, LLC | $895.5K | ENGINEERING SERVICES FOR THE MODELING AND SIMULATION OF XM30 SURVIVABILITY, INCLUDING UNDERBODY BLAST (UBB) AND ACTIVE PROTECTION SYSTEMS (APS). THE SUBCONTRACTED WORK WILL ALLOW FOR THE CHARACTERIZATION AND… |
| 2024-05-24 | Ravelin Defense, Inc. | $645.6K | CREW AND DISMOUNT SEATS |
| 2024-02-15 | Thyssenkrupp Rothe Erde USA Inc. | $563.7K | ITEMS UNDER SUBCONTRACT INCLUDE WIRE RACE SLEWING BEARINGS AND MACHINED RING FORGING. THESE ITEMS ARE INTEGRATED TO THE VEHICLE€„¢S MAIN WEAPON STATION. |
| 2024-02-22 | Thermoanalytics, Inc. | $399.4K | THERMAL ANALYSIS |
| 2024-06-18 | Great Lakes Sound & Vibration Inc | $380.3K | EXHAUST SYSTEM |
| 2023-10-10 | Rheinmetall Canada Inc | $120.0K | SOFTWARE AND SYSTEMS ENGINEERING STAFFING |
| 2024-07-30 | Scioteq LLC | $40.3K | DISPLAY SYSTEMS |
39 actions since 2023-06-26. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-05-26 | P00036 | Supplemental agreement (work within scope) | $0 | XM30 PHASE 3/4 EFFORT |
| 2026-05-01 | P00035 | Supplemental agreement (work within scope) | $0 | XM30 PHASE 3/4 EFFORT |
| 2026-03-26 | P00034 | Supplemental agreement (work within scope) | $537.5K | XM30 PHASE 3/4 EFFORT |
| 2026-03-03 | P00033 | Supplemental agreement (work within scope) | $0 | ADMINISTRATIVE CHANGES TO THE PHASE 3 AND 4 DEVELOPMENT OF THE OPTIONALLY MANNED FIGHTING VEHICLE. |
| 2026-02-09 | P00032 | Supplemental agreement (work within scope) | $755.1K | CREW TRAINER SIMULATOR BEING ADDED TO THE PHASE 3 AND 4 DEVELOPMENT OF THE OPTIONALLY MANNED FIGHTING VEHICLE. |
| 2026-01-15 | P00031 | Supplemental agreement (work within scope) | $0 | XM30 PHASE 3/4 EFFORT |
| 2025-12-18 | P00029 | Administrative change | $111.78M | ADD FUNDS IN ACCORDANCE WITH THE CONTRACTS INCREMENTAL FUNDING SCHEDULE IN SECTION B. |
| 2025-12-17 | P00030 | Supplemental agreement (work within scope) | $0 | XM30 PHASE 3/4 EFFORT |
| 2025-11-14 | P00028 | Supplemental agreement (work within scope) | $0 | ADMINISTRATIVE CHANGES TO SECTIONS A, C, H AND J |
| 2025-10-23 | ARZ997 | Vendor address changed | $0 | PHASE 3 AND 4 DEVELOPMENT WITH 7 PROTOTYPE DELIVERABLES OF THE OPTIONALLY MANNED FIGHTING VEHICLE. |
| 2025-09-19 | P00027 | Supplemental agreement (work within scope) | $3.39M | THE PURPOSE OF THIS ACTION IS TO REQUIRE THE CONTRACTOR TO PROCURE/DELIVER APS COUNTERMEASURES FOR USG PPT TESTING. |
| 2025-09-18 | P00025 | Supplemental agreement (work within scope) | $2.04M | INCORPORATE REVISION 003 TO ATTACHMENT 0069 AND ADD COST FOR AN ADDITIONAL 151 ARMOR COUPONS. |
| 2025-09-10 | P00026 | Supplemental agreement (work within scope) | $0 | INCORPORATE REVISION 06 TO ATTACHMENT 0008, REVISION 18 TO ATTACHMENT 0044, AND ADD PLYMOUTH LOCATION TO PARAGRAPH D.4. |
| 2025-08-07 | P00024 | Supplemental agreement (work within scope) | $0 | XM30 PHASE 3/4 EFFORT |
| 2025-07-01 | P00023 | Supplemental agreement (work within scope) | $0 | XM30 PHASE 3/4 EFFORT |
| 2025-06-09 | P00021 | Supplemental agreement (work within scope) | $0 | CHANGE THE PAYMENT METHOD ON THE CONTACT FROM PERFORMANCE BASED PAYMENTS TO PROGRESS PAYMENTS. |
| 2025-06-02 | P00022 | Supplemental agreement (work within scope) | $54.7K | MODIFY THE SCOPE OF WORK TO REQUIRE THE CONTRACTOR PROCURE/DELIVERY ROSY GRENADES FOR GOVERNMENT PRE-PRODUCTION PROVE-OUT TESTING (PPT). |
| 2025-05-27 | P00020 | Supplemental agreement (work within scope) | $0 | XM30 PHASE 3&4 EFFORT |
| 2025-04-23 | P00019 | Funding only | $161.91M | XM30 PHASE 3 & 4 EFFORT |
| 2025-04-14 | P00018 | Funding only | $0 | MODIFICATION TO REVERT CONTRACT BACK TO PROGRESS-BASED PAYMENTS FROM PERFORMANCE-BASED PAYMENTS. |
| 2025-02-27 | P00017 | Supplemental agreement (work within scope) | $0 | ADMINISTRATIVE MODIFICATION TO REVISE ATTACHMENTS AND ENCOMPASSING SCOPE OF WORK. |
| 2025-01-29 | P00016 | Supplemental agreement (work within scope) | $0 | MODIFICATION TO CHANGE DELIVERABLE SPECIFICATION. |
| 2025-01-08 | P00014 | Supplemental agreement (work within scope) | $0 | MODIFICATION TO UPDATE SECTIONS C, D, H, AND J. |
| 2024-12-18 | P00015 | Funding only | $36.03M | MODIFICATION TO ADD FUNDING TO CLIN 0001, INCREMENTAL FUNDING SCHEDULE 3. |
| 2024-09-25 | P00013 | Option exercised | $16.70M | MODIFICATION TO REVISED PPT SCHEDULE AND EXERCISE 8TH PROTOTYPE OPTION. |
| 2024-09-20 | P00012 | Supplemental agreement (work within scope) | $0 | ADMINISTRATIVE MODIFICATION TO REVISE PBP PLAN, ADD A CONTRACTOR GFP DELIVERY SITE, AND REVISE THE GFP ATTACHMENT. |
| 2024-09-06 | P00011 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO REVISE CDRL DELIVERY CHANGES, UPDATE ATTACHMENTS. |
| 2024-07-01 | P00010 | Option exercised | $0 | CONTRACT MODIFICATION REVISES CDRLS, ADD ONE ADDITIONAL USG SUBCONTRACTOR, AND OTHER ADMINISTRATIVE CHANGES. |
| 2024-05-13 | P00009 | Supplemental agreement (work within scope) | $184.90M | FUNDING ACTION AND ATTACHMENT UPDATES. |
| 2024-04-10 | P00008 | Supplemental agreement (work within scope) | $0 | AMIONISTRATIVE MODIFCATION TO CHANGE CONTRACT FUDNING TYPE FORM PERFOMANCE BASED PAYMENTS TO PROGRESS BASED PAYMENTS. |
| 2024-03-21 | P00007 | Supplemental agreement (work within scope) | $0 | ADMINISTRATIVE MODIFICATION TO REVISE ATTACHMENT 0044, 0071, AND H.16.1. |
| 2024-02-27 | P00006 | Supplemental agreement (work within scope) | $0 | ADMINISTRATIVE MODIFICATION TO UPDATE ATTACHMENT 0044, 0071 AND REVISE SEC H.16.1 AND H.18. |
| 2024-01-29 | P00005 | Supplemental agreement (work within scope) | $0 | ADMINISTRATIVE MODIFICATION TO ADD/UPDATE ATTACHMENTS AND REVISE CORRECT TYPOGRAPHICAL ERRORS WITHIN THE SCOPE OF WORK. |
| 2023-11-28 | P00004 | Supplemental agreement (work within scope) | $0 | ADMINISTRATIVE MODIFICATION TO UPDATE ATTACHMENT 1 AND 71, UPDATE TO DODAAC DATES, AND REVISE TO C.9.5.5 |
| 2023-09-20 | P00003 | Funding only | $71.70M | XM30 PHASE 3-4 FUNDING ACTION. |
| 2023-09-19 | P00002 | Supplemental agreement (work within scope) | $0 | MODIFICATION TO MAKE ADMINISTRATIVE CHANGES. |
| 2023-08-14 | P00001 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO REFLECT A PROGRAM NAME CHANGE IN THE CONTRACT AND IN ALL ATTACHMENTS. |
| 2023-07-21 | A00001 | Administrative change | $0 | PHASE 3 AND 4 DEVELOPMENT WITH 7 PROTOTYPE DELIVERABLES OF THE OPTIONALLY MANNED FIGHTING VEHICLE. |
| 2023-06-26 | 0 | $107.91M | PHASE 3 AND 4 DEVELOPMENT WITH 7 PROTOTYPE DELIVERABLES OF THE OPTIONALLY MANNED FIGHTING VEHICLE. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗