W56KGY22F0050↗
Lockheed Martin Corporation received this contract from W6QK Acc-Apg, Defense Contract Management Agency: $4.11M obligated so far for support- professional: engineering/technical. Its period of performance ended 2025-12-22.
Key facts · data as of Oct 28, 2026
- Recipient
- Lockheed Martin Corporation
- Awarding agency
- Defense Contract Management Agency (Department of Defense)
- Contracting office
- W6QK Acc-Apg (W56KGY)
- Obligated to date
- $4.11M
- Potential value
- $30.34M
- Ends
- 2025-12-22
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 28, 2026.
Cite this page: SpendQuery, Award W56KGY22F0050, data as of Oct 28, 2026, https://spendquery.com/award?id=CONT_AWD_W56KGY22F0050_9700_W56KGY22D0001_9700
Lockheed Martin Corporation: all federal awards · Department of Defense: spending · W6QK Acc-Apg: what it buys
THE PURPOSE OF THIS CONTRACT W56KGY22D0001 D.O. W56KGY22F0050 IS TO PROVIDE FUNDING FOR THE EDM EFFORT OF THE AN/TPQ-53.
What it is
- Product or service
- Support- Professional: Engineering/Technical (PSC R425)
- Industry
- Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing (NAICS 334511)
- Contracting office
- W6QK Acc-Apg (W56KGY)
- Competition
- Not competed
- Pricing
- Cost plus fixed fee
- How it was bought
- Single-award IDIQ · under W56KGY22D0001
- Where the work is
- Onondaga, NY · district NY-22
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
27 subawards totaling $2.58M (62.6% of what was obligated), as Lockheed Martin Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Switching Power Inc. | $398.0K | 2 | NY | 2023-05-11 | 2023-07-26 |
| Qorvo, Inc. | $309.1K | 2 | TX | 2023-11-02 | 2024-02-01 |
| Unicircuit, Inc. | $230.3K | 1 | CO | 2023-09-18 | 2023-09-18 |
| Saginaw Products Corporation | $226.8K | 1 | MI | 2023-05-31 | 2023-05-31 |
| Johnstown Welding & Fabrication, Inc. | $214.8K | 1 | PA | 2023-10-18 | 2023-10-18 |
| Trust Automation Inc | $179.6K | 1 | CA | 2023-12-18 | 2023-12-18 |
| JQL Technologies Corp | $156.3K | 1 | IL | 2023-08-17 | 2023-08-17 |
| C Machine Co Inc | $127.5K | 1 | MN | 2023-05-31 | 2023-05-31 |
| Smiths Group PLC | $98.7K | 3 | MO | 2024-05-29 | 2024-11-27 |
| Moog Inc | $86.2K | 1 | VA | 2023-10-18 | 2023-10-18 |
| SV Microwave, Inc. | $77.1K | 2 | FL | 2023-12-07 | 2024-01-03 |
| MTK Electronics Inc | $67.1K | 1 | NY | 2023-08-01 | 2023-08-01 |
| Avnet Inc | $63.4K | 1 | AZ | 2023-10-10 | 2023-10-10 |
| Rti Remmele Engineering, Inc. | $59.4K | 1 | MN | 2023-08-28 | 2023-08-28 |
| Wenzel Associates, Inc. | $55.0K | 1 | TX | 2025-04-02 | 2025-04-02 |
| Cpi Radant Technologies Division Inc. | $52.2K | 1 | MA | 2024-01-25 | 2024-01-25 |
| Galleon Embedded Computing LLC | $49.9K | 1 | TX | 2023-09-13 | 2023-09-13 |
| Arrow Electronics, Inc. | $48.3K | 1 | NY | 2023-10-17 | 2023-10-17 |
| Kyocera Corporation | $43.4K | 2 | CA | 2023-12-22 | 2024-03-11 |
| 110 Metalworks, Inc. | $33.0K | 2 | NY | 2023-03-29 | 2023-05-11 |
The largest single subawards
| Date | To | Amount | For |
|---|---|---|---|
| 2023-05-11 | Switching Power Inc. | $377.3K | AC/DC POWER SUPPLY 48VDC ENCLOSURE 275V POWER SUPPLY ENCLOSURE 48V POWER SUPPLY POWER SUPPLY AC/DC 275VDC |
| 2023-11-02 | Qorvo Texas, LLC | $253.2K | MICROCIRCUIT LINEAR - AMPLIFIER DRIVER MICROCIRCUIT LINEAR-CLC MMIC DIE MICROCIRCUIT LINEAR-DIE HPA MMIC. |
| 2023-09-18 | Unicircuit, Inc. | $230.3K | CCA OCTAPACK BEAMFORMER (ELEMENTS) |
| 2023-05-31 | Saginaw Products Corporation | $226.8K | JACK ASSY FRONT MECH JACK ASSY REAR MECH SANDPAD ASSEMBLY FR STAYBRACE ASSY LONG |
| 2023-10-18 | JWF Defense Systems, LLC | $214.8K | SPES STRUCTURE TAILRACK MAIN STRUCT |
| 2023-12-18 | Trust Automation Inc | $179.6K | DRIVE SHAFT ASSEMBLY. ELEVATION CONTROLLER. LEVELING CONTROLLER MOT GEARBOX CONT ASSY |
| 2023-08-17 | JQL Technologies Corp | $156.3K | CIRCULATOR RADIO FREQUENCY-3-PORT S-BA. |
| 2023-05-31 | C Machine Co Inc | $127.5K | CHASSIS OCTAPACK |
| 2023-10-18 | Moog Inc. | $86.2K | SLIP RING |
| 2023-12-07 | SV Microwave, Inc. | $71.4K | CABLE ASSEMBLY RADIO FREQUENCY |
| 2023-08-01 | MTK Electronics Inc | $67.1K | AC INPUT POWER ASSEMBLY |
| 2023-10-10 | Avnet Inc | $63.4K | IC FPGA ULTRASCALE |
| 2023-08-28 | Rti Remmele Engineering, Inc. | $59.4K | ROW BEAM HORIZONTAL. |
| 2024-02-01 | Qorvo Texas, LLC | $55.9K | MICROCIRCUIT LINEAR - AMPLIFIER DRIVER MICROCIRCUIT LINEAR-CLC MMIC DIE |
| 2025-04-02 | Wenzel Associates, Inc. | $55.0K | NRE - DIGITAL PCB RESPIN |
| 2024-01-25 | Cpi Radant Technologies Division Inc. | $52.2K | RADOME S-BAND. |
| 2024-06-04 | Smiths Interconnect Americas, Inc. | $51.2K | FILTER BAND PASS - 8-CHANNEL. |
| 2023-09-13 | Galleon Embedded Computing LLC | $49.9K | MICROSERVER ASSEMBLY. |
| 2023-10-17 | Arrow Electronics, Inc. | $48.3K | CABLE ASSY CUSTOM HDR UCP ESCA 4L CABLE ASSY CUSTOM HDR UCP ESCA 5L |
| 2023-12-22 | Kyocera International Inc | $47.4K | SUB-ASSEMBLY HTCC T/R. |
| 2024-05-29 | Smiths Interconnect Americas, Inc. | $42.3K | M12EZX-3100/R800-SMP/S QUAL CHARGE |
| 2023-03-29 | 110 Metalworks, Inc. | $32.8K | CHASSIS OCTAPACK |
| 2023-07-26 | Switching Power Inc. | $20.8K | ENCLOSURE 275V POWER SUPPLY |
| 2024-01-03 | SV Microwave, Inc. | $5.7K | CABLE ASSEMBLY RADIO FREQUENCY |
| 2024-11-27 | Smiths Interconnect Americas, Inc. | $5.3K | M12EZX-3100/R800-SMP/S QUAL CHARGE |
Every action
21 actions since 2022-10-12. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-03-23 | A00003 | Administrative change | $0 | THIS IS IN SUPPORT OF AMERICA'S BANDWIDTH INITIATIVE TEAM ENGINEERING DEVELOPMENT MODEL FOR THE Q-53 AREA. |
| 2026-01-29 | P00018 | Supplemental agreement (work within scope) | $0 | THE SCOPE OF THIS ORDER IS FOR AMERICA'S BANDWIDTH INITIATIVE TEAM ENGINEERING DEVELOPMENT MODEL FOR THE Q-53 RADAR SYSTEM. |
| 2026-01-16 | P00017 | Supplemental agreement (work within scope) | $0 | THE SCOPE OF THIS ORDER IS FOR AMERICA'S BANDWIDTH INITIATIVE TEAM ENGINEERING DEVELOPMENT MODEL FOR THE Q-53 RADAR SYSTEM. |
| 2026-01-15 | P00016 | Administrative change | $0 | THE SCOPE OF THIS ORDER IS FOR AMERICA'S BANDWIDTH INITIATIVE TEAM ENGINEERING DEVELOPMENT MODEL FOR THE Q-53 RADAR SYSTEM. |
| 2025-12-22 | P00015 | Supplemental agreement (work within scope) | $0 | THIS IS IN SUPPORT OF AMERICA'S BANDWIDTH INITIATIVE TEAM ENGINEERING DEVELOPMENT MODEL FOR THE Q-53 AREA. |
| 2025-12-10 | A00002 | Administrative change | $0 | THIS IS IN SUPPORT OF AMERICA'S BANDWIDTH INITIATIVE TEAM ENGINEERING DEVELOPMENT MODEL FOR THE Q-53 AREA. |
| 2025-08-06 | A00001 | Administrative change | $0 | THIS IS IN SUPPORT OF AMERICA'S BANDWIDTH INITIATIVE TEAM ENGINEERING DEVELOPMENT MODEL FOR THE Q-53 AREA. |
| 2025-07-21 | P00014 | Administrative change | $0 | THIS IS IN SUPPORT OF AMERICA'S BANDWIDTH INITIATIVE TEAM ENGINEERING DEVELOPMENT MODEL FOR THE Q-53 AREA. |
| 2025-07-03 | P00013 | Administrative change | $0 | THIS IS IN SUPPORT OF AMERICA'S BANDWIDTH INITIATIVE TEAM ENGINEERING DEVELOPMENT MODEL FOR THE Q-53 AREA. |
| 2025-06-30 | P00012 | Supplemental agreement (work within scope) | $0 | THIS ORDER IS IN SUPPORT OF THE AMERICAS MID-BAND INITIATIVE TEAM ENGINEERING DEVELOPMENT MODEL FOR THE Q-53 RADAR SYSTEM |
| 2025-03-25 | P00011 | Administrative change | $0 | THE PRODUCT MANAGER MULTI-MISSION SURVEILLANCE SYSTEMS REQUIRES THE DISTRIBUTED DIGITAL RECEIVER EXCITER ENGINEERING DEVELOPMENT MODEL SOLUTION. THE CONTRACTOR SHALL PROCURE AND BUILD TO LINE REPLACEABLE UNIT LEVEL ASSEMBLIES. |
| 2025-03-06 | P00010 | Administrative change | $0 | THE CONTRACTOR SHALL PROCURE AND BUILD TO LINE REPLACEABLE UNIT (LRU)-LEVEL ASSEMBLIES THAT MAKE UP RETROFIT OF ONE ENHANCED TPQ-36 (EQ-36) NON-RECURRING ENGINEER TARGET ACQUISITION SUBSYSTEM COMPLETE MODIFICATION KIT WITH LRU SPARES FOR THE VARIANT. |
| 2025-02-13 | P00009 | Administrative change | $0 | THE PRODUCT MANAGER MULTI-MISSION SURVEILLANCE SYSTEMS REQUIRES ONE DISTRIBUTED DIGITAL RECEIVER EXCITER ENGINEERING DEVELOPMENT MODELS. THE PRODUCT MANAGER REQUIRES ONE DISTRIBUTED DIGITAL RECEIVER EXCITER ENGINEERING DEVELOPMENT MODELS. |
| 2025-01-23 | P00008 | Supplemental agreement (work within scope) | $0 | THE CONTRACTOR SHALL RETROFIT OF ONE ENHANCED TPQ-36 NON-RECURRING ENGINEER TARGET ACQUISITION SUBSYSTEM TO THE UPDATED VARIANT CONFIGURATION. |
| 2024-12-19 | P00007 | Supplemental agreement (work within scope) | $0 | THE CONTRACTOR SHALL RETROFIT OF ONE ENHANCED TPQ-36 NON-RECURRING ENGINEER TARGET ACQUISITION SUBSYSTEM TO THE UPDATED VARIANT CONFIGURATION. |
| 2024-11-25 | P00006 | Supplemental agreement (work within scope) | $0 | THE PRODUCT MANAGER REQUIRES ONE DISTRIBUTED DIGITAL RECEIVER EXCITER ENGINEERING DEVELOPMENT MODELS. THE CONTRACTOR SHALL RETROFIT OF ONE ENHANCED TPQ-36 NON-RECURRING ENGINEER TARGET ACQUISITION SUBSYSTEM TO THE DDREX VARIANT CONFIGURATION. |
| 2023-12-06 | P00005 | Supplemental agreement (work within scope) | $0 | THIS MODIFICATION UPDATES THE PWS TO REVISION 3.1. |
| 2023-08-02 | P00004 | Supplemental agreement (work within scope) | $314.2K | THE PURPOSE OF THIS MODIFICATION P00004 IS TO PROVIDE ADDITIONAL FUNDING AND ESTABLISH SLIN 000104. |
| 2023-04-05 | P00003 | Change order | $0 | MODIFICATION TO ADD AN H NARRATIVE AS WELL AS ATTACH AN UPDATED PWS AND CDRLS DOCUMENT. |
| 2023-01-26 | P00002 | Funding only | $3.80M | ADD INCREMENTAL FUNDING |
| 2022-10-12 | P00001 | Administrative change | $0 | MODIFICATION TO FIX A TYPO ON FEE OF CLIN 0001. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-28). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗