Arctic Peak LLC received this contract from W6QK Acc-Apg Dir, Department of the Army: $511.6K obligated so far for construction of miscellaneous buildings. It runs to 2027-04-16.

Key facts · data as of Oct 26, 2026

Recipient
Arctic Peak LLC
Awarding agency
Department of the Army (Department of Defense)
Contracting office
W6QK Acc-Apg Dir (W56ZTN)
Obligated to date
$511.6K
Potential value
$797.6K
Ends
2027-04-16

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 26, 2026.

Cite this page: SpendQuery, Award W56ZTN26FA038, data as of Oct 26, 2026, https://spendquery.com/award?id=CONT_AWD_W56ZTN26FA038_9700_W56ZTN25D0002_9700

THIS IS A DESIGN-BUILD PROJECT. DESIGN AND INSTALL NEW WATER METERS AT THE LOCATIONS OUTLINED BELOW. IN THE EVENT THAT A METER IS PRESENT AT A LOCATION REPLACE IT WITH THE NEW WATER METER.

Delivery Order · Department of the Army · to Arctic Peak LLC (UEI PMWJHM3WMZK3) · data as of 2026-10-26

Obligated to date$511.6K1 action
Current value$511.6Kwith options exercised
Potential value$797.6Kif every option is used
Period2026-04-01 → 2027-04-16current end date

Up for re-bid: ends 2027-04-16. Recompete brief → · The Post-wide Construction Multiple Award Task Contract (MATOC) ↗

What it is

Product or service
Construction of Miscellaneous Buildings (PSC Y1JZ)
Industry
Commercial and Institutional Building Construction (NAICS 236220)
Contracting office
W6QK Acc-Apg Dir (W56ZTN)
Competition
Not available for competition
Pricing
Firm fixed price
How it was bought
Single-award IDIQ · under W56ZTN25D0002
Where the work is
Harford, MD · district MD-01

Obligations by fiscal year

FY2026$511.6K

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-03-31. Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2026-03-310$511.6KTHIS IS A DESIGN-BUILD PROJECT. DESIGN AND INSTALL NEW WATER METERS AT THE LOCATIONS OUTLINED BELOW. IN THE EVENT THAT A METER IS PRESENT AT A LOCATION REPLACE IT WITH THE NEW WATER METER.