Putting the award page together from the records…
Putting the award page together from the records…
W58RGZ-16-C-0023 IS FOR THE AWARD OF ADVANCE PROCUREMENT IN THE AMOUNT OF $184,930,000.00 TO SUPPORT LOT 7 FULL RATE PRODUCTION LONG LEAD ITEMS.
Up for re-bid: ends 2027-08-31. Recompete brief → · FIRE CONTROL RADAR (FCR) ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
900 subawards totaling $349.81M (153.9% of what was obligated), as The Boeing Company reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Tata Boeing Aerospace Limited | $45.47M | 42 | 2023-02-22 | 2025-05-23 | |
| RTX Corp | $23.11M | 16 | CT, NC, NY, TX, UT, VT | 2022-11-08 | 2025-03-31 |
| L3Harris Technologies, Inc | $20.50M | 49 | FL, GA, NY, OK, UT | 2023-03-16 | 2025-03-26 |
| Science and Engineering Services, LLC | $18.51M | 4 | AL | 2023-07-19 | 2025-03-23 |
| WDC Acquisition LLC | $15.86M | 9 | IA | 2023-03-13 | 2025-05-08 |
| Sanmina-Sci Corporation | $15.43M | 11 | AL | 2023-05-11 | 2023-06-22 |
| Purolator Facet, Inc. | $15.27M | 49 | CA, FL, GB-HAM, MA, MI, PA, WA | 2023-12-21 | 2025-12-10 |
| Triumph Group, Inc. | $14.59M | 58 | CT, MI, WA | 2022-11-07 | 2025-07-07 |
| General Electric Company | $10.86M | 10 | FL, MI, OH | 2022-11-16 | 2025-02-27 |
| Parker-Hannifin Corporation | $9.99M | 63 | CA, MA, MI | 2022-11-09 | 2025-12-17 |
| Heligear Acquisition Co. | $9.78M | 14 | AZ, IL | 2022-11-18 | 2025-04-25 |
| Cablex Pty. LTD. | $6.74M | 1 | 2023-10-10 | 2023-10-10 | |
| Resideo Technologies, Inc. | $6.71M | 21 | AZ, FL, MN | 2023-06-22 | 2024-12-20 |
| Systems 3, Inc. | $6.68M | 5 | AZ | 2023-02-27 | 2024-11-15 |
| Ametek Inc | $5.97M | 6 | CA, NY | 2022-11-18 | 2024-08-19 |
| Fokker Aerostructures B.V. | $5.13M | 5 | 2023-08-08 | 2024-05-10 | |
| Honeywell International Inc | $4.77M | 26 | AZ, OH | 2022-11-02 | 2025-07-24 |
| Goodrich Lighting Systems Inc | $4.64M | 10 | AZ | 2023-10-11 | 2025-11-05 |
| Transdigm Group Incorporated | $4.25M | 19 | AZ, CA, FL | 2022-11-17 | 2025-08-12 |
| GE Aviation Systems Limited | $4.16M | 3 | MI, WA | 2023-02-14 | 2024-07-18 |
| PCX Aerosystems-Manchester, LLC | $3.91M | 16 | CT | 2023-08-01 | 2024-05-29 |
| Leonardo Spa | $3.83M | 8 | 2022-11-11 | 2023-07-14 | |
| The Triumph Group Operations, Inc | $3.70M | 7 | MI, NC | 2024-05-07 | 2025-06-20 |
| Thales Nederland B.V. | $3.61M | 5 | 2023-08-25 | 2025-03-26 | |
| Elbit Systems LTD | $3.51M | 2 | TX | 2023-08-15 | 2025-04-24 |
The 25 largest of 150; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2023-10-05 | Science and Engineering Services, LLC | $13.60M | AEROSPACE SUPPORT |
| 2023-08-28 | Tata Boeing Aerospace Limited | $13.07M | MAJOR STRUCTURES |
| 2023-07-28 | WDC Acquisition LLC | $8.71M | COMMON AEROSPACE COMMODITIES |
| 2023-06-19 | Goodrich Corporation | $7.27M | AEROSPACE SUPPORT |
| 2023-08-29 | Tata Boeing Aerospace Limited | $7.26M | MAJOR STRUCTURES |
| 2023-08-29 | Tata Boeing Aerospace Limited | $6.87M | MAJOR STRUCTURES |
| 2023-10-10 | Cablex Pty. LTD. | $6.74M | AEROSPACE SUPPORT |
| 2025-01-08 | Parker-Hannifin Corporation | $5.89M | COMMON AEROSPACE COMMODITIES |
| 2023-10-30 | Tata Boeing Aerospace Limited | $5.57M | MAJOR STRUCTURES |
| 2024-02-28 | GE Aviation Systems LLC | $4.76M | ELECTRA/HYDRA/MECHANICAL (EHM) |
| 2024-06-21 | L3 Technologies, Inc. | $4.34M | SYSTEMS |
| 2023-09-11 | Science and Engineering Services, LLC | $4.00M | REPAIR/OVERHAUL |
| 2023-02-14 | GE Aviation Systems Limited | $3.85M | SYSTEMS |
| 2023-06-14 | Goodrich Corporation | $3.73M | AEROSPACE SUPPORT |
| 2023-06-22 | Sci Technology, Inc | $3.71M | AEROSPACE SUPPORT |
| 2024-09-06 | WDC Acquisition LLC | $3.64M | COMMON AEROSPACE COMMODITIES |
| 2023-08-15 | Elbitamerica, Inc. | $3.47M | NON PRODUCTION |
| 2023-12-18 | Goodrich Lighting Systems Inc | $3.24M | ELECTRA/HYDRA/MECHANICAL (EHM) |
| 2023-06-22 | Sci Technology, Inc | $2.97M | AEROSPACE SUPPORT |
| 2024-10-08 | Honeywell International Inc. | $2.97M | SYSTEMS |
| 2024-05-14 | Triumph Actuation Systems LLC | $2.96M | MAJOR STRUCTURES |
| 2023-10-19 | Ametek Thermal Systems Inc | $2.95M | ELECTRA/HYDRA/MECHANICAL (EHM) |
| 2023-04-27 | Systems 3, Inc. | $2.88M | PURCHASED OUTSIDE PRODUCTION |
| 2023-06-16 | Bae Systems Land & Armaments L.P. | $2.82M | INTERIORS |
| 2023-07-26 | Triumph Engine Control Systems LLC | $2.77M | ELECTRA/HYDRA/MECHANICAL (EHM) |
110 actions since 2022-10-19. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-06-04 | A00274 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO ADD TAC CODE TO SUPPORT SHIPPING OF MATERIALS. |
| 2026-06-01 | A00273 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT SHIP-TO DODAAC |
| 2026-04-30 | P00134 | Change order definitized | $7.33M | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| 2026-04-08 | A00272 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT SHIP-TO DODAAC |
| 2026-03-19 | P00132 | Supplemental agreement (work within scope) | $0 | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| 2026-03-03 | P00131 | Change order definitized | $61.30M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2026-02-12 | P00130 | Option exercised | $551.2K | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 7-11 |
| 2026-02-12 | P00130 | Option exercised | $0 | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 7-11 |
| 2026-02-03 | A00271 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT SHIP-TO DODAAC |
| 2025-11-13 | P00124 | Funding only | $7.32M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2025-10-02 | A00270 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT SHIP-TO DODAAC |
| 2025-10-02 | A00265 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION TO ADD FMS TAC CODE |
| 2025-09-23 | P00129 | Funding only | $569.0K | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 7-11 |
| 2025-09-15 | A00263 | Administrative change | $0 | DOCUMENT PROPERTY TRANSFER |
| 2025-08-25 | P00128 | Supplemental agreement (work within scope) | -$334.6K | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 7-11 |
| 2025-08-19 | A00260 | Administrative change | $0 | CORRECT ATTACHMENT 01 FROM MOD A00258. |
| 2025-08-05 | P00127 | Supplemental agreement (work within scope) | $12.46M | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 7-11 |
| 2025-08-01 | P00125 | Supplemental agreement (work within scope) | $1.76M | APACHE AH-64E FULL RATE PRODUCTION LOTS 7-11. |
| 2025-08-01 | P00125 | Supplemental agreement (work within scope) | $1.22M | APACHE AH-64E FULL RATE PRODUCTION LOTS 7-11. |
| 2025-07-28 | P00126 | Supplemental agreement (work within scope) | $0 | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 7-11 |
| 2025-07-22 | A00259 | Administrative change | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| 2025-07-02 | A00258 | Administrative change | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| 2025-06-02 | A00257 | Administrative change | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| 2025-05-30 | A00256 | Administrative change | $0 | MODIFICATION TO CHANGE INSPECTION/ACCEPTANCE ON CLIN 9105AD FROM DESTINATION TO ORIGIN |
| 2025-05-28 | A00255 | Administrative change | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| 2025-05-15 | A00251 | Administrative change | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| 2025-04-22 | A00250 | Administrative change | $0 | ADD SHIPMENT INFORMATION FOR GFP |
| 2025-04-18 | A00248 | Administrative change | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| 2025-04-18 | A00247 | Administrative change | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| 2025-04-15 | A00244 | Administrative change | $0 | CHANGE INSPECTION/ACCEPTANCE CRITERIA FOR CLINS 9104AA AND 9104AB |
| 2025-03-13 | P00123 | Administrative change | $1.35M | MOD TO ADD FUNDS TO MULTIPLE SUBCLINS IN SUPPORT OF EFFORTS FOR MY1 APACHE AH-64E FULL RATE PRODUCTION LOTS 7-11. |
| 2025-03-05 | A00242 | Administrative change | $0 | DOCUMENT GFP TRANSFER |
| 2025-02-20 | P00120 | Administrative change | -$938.7K | MOD TO EXTEND SUBCLINS POP AT NO ADDL COST, DEOB A SUBCLIN, DELETE A SUBCLIN, UPDATE REFERENCES, AND UPDATE ATTACHMENTS. EFFORT IS FOR MY1 APACHE AH-64E FULL RATE PRODUCTION LOTS 7-11. |
| 2025-02-19 | P00122 | Administrative change | $0 | TO EXTEND PERIOD OF PERFORMANCE FOR SUBCLIN 9125AA, ADD SUPPLEMENTARY ADDRESS AND TO ADD UPDATED PARTS LIST ATTACHEMENT. |
| 2025-02-19 | P00122 | Administrative change | $0 | TO EXTEND PERIOD OF PERFORMANCE FOR SUBCLIN 9125AA, ADD SUPPLEMENTARY ADDRESS AND TO ADD UPDATED PARTS LIST ATTACHMENT. |
| 2025-02-12 | A00241 | Administrative change | $0 | ADD SHIPPING INSTRUCTIONS FOR GFP |
| 2025-02-04 | A00240 | Administrative change | $0 | ADD SHIPPING INSTRUCTIONS FOR GFP |
| 2025-02-04 | A00239 | Administrative change | $0 | ADD SHIP-TO INFORMATION TO CLIN 9125AA |
| 2025-01-29 | P00121 | Change order definitized | $122.3K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2024-12-12 | P00118 | Change order definitized | $2.17M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2024-11-14 | P00119 | Administrative change | $600.0K | ADMIN MOD TO INCREASE FUNDING FOR SLIN 9109AA UAE O AND A. EFFORT IS FOR FMS THE UNIQUE MODS TO THE UAE DELTA 10 NEW BUILD AND 26 REMAN APACHE AH 64E, 2 REMAN LCTS, AND PGSE TO SUPPORT FIELDING AND TRAINING SCHEDULES. |
| 2024-10-18 | P00115 | Change order definitized | $63.09M | DEFINITIZE THE CHANGE ORDER FOR THE UNIQUE PORTION OF THE AH-64E AIRCRAFT FOR THE UNITED ARAB EMIRATES (UAE) FMS CUSTOMER |
| 2024-09-25 | A00237 | Administrative change | $0 | DOCUMENT TRANSFER OF PROPERTY |
| 2024-09-10 | P00116 | Change order | $150.0K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES (FMS). |
| 2024-08-29 | P00117 | Administrative change | -$1.79M | APACHE ATTACK HELICOPTER (AH64E) FULL RATE PRODUCTION (LOTS 7-11) USG AND FOREIGN MILITARY SALES. |
| 2024-08-02 | A00235 | Administrative change | $0 | DOCUMENT TRANSFER OF PROPERTY |
| 2024-07-16 | A00233 | Administrative change | $0 | DOCUMENT TRANSFER OF PROPERTY |
| 2024-07-15 | A00232 | Administrative change | $0 | DOCUMENT MODIFIED MESSAGE - PROPERTY PROVIDED |
| 2024-07-10 | A00234 | Administrative change | $0 | DOCUMENT RFAMS, PROPERTY BORROW/PAYBACK |
| 2024-06-24 | A00231 | Administrative change | $0 | DOCUMENT THE TRANSFER OF GFP |
| 2024-06-18 | A00230 | Administrative change | $0 | DOCUMENT THE TRANSFER OF GFP |
| 2024-05-31 | P00114 | Supplemental agreement (work within scope) | $0 | EXTEND THE PERIOD OF PERFORMANCE FROM 29 FEB 2024 TO 31 OCT 2024 FOR SUBCLIN 9033AA, UK, DIGITAL DETECTOR HEAD (DDH). |
| 2024-05-31 | P00113 | Administrative change | $0 | THIS MODIFICATION IS FOR EXTENDING THE PERIOD OF PERFORMANCE FROM 31 MAY 2024 TO 31 DECEMBER 2025. |
| 2024-05-29 | A00228 | Administrative change | $0 | DOCUMENT THE TRANSFER OF GFP |
| 2024-05-28 | A00226 | Administrative change | $0 | DOCUMENT THE DOWNWARD EQUITABLE ADJUSTMENT FOR MODIFIED MESSAGE CFM TO GFM |
| 2024-05-16 | A00225 | Administrative change | $0 | DOCUMENT THE TRANSFER OF GFP |
| 2024-05-07 | P00112 | Supplemental agreement (work within scope) | -$2.08M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2024-05-07 | P00112 | Supplemental agreement (work within scope) | $598.5K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2024-05-02 | A00224 | Administrative change | $0 | DOCUMENT THE TRANSFER OF GFP |
| 2024-04-25 | A00223 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2024-04-05 | P00111 | Change order definitized | $11.48M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2024-02-20 | A00215 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE DOWNWARD EQUITABLE ADJUSTMENT OF MY7096 & MY7097. |
| 2024-02-12 | A00212 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2024-02-07 | P00109 | Supplemental agreement (work within scope) | $500.0K | APACHE ATTACK HELICOPTER (AH -64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES. |
| 2024-01-30 | A00210 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2024-01-22 | A00213 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2024-01-22 | A00211 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2024-01-22 | A00209 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2024-01-19 | A00208 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2024-01-12 | P00110 | Funding only | $13.04M | APACHE ATTACK HELICOPTER (AH64E) FULL RATE PRODUCTION (LOTS 7-11) FOR USG AND FOREIGN MILITARY SALES. THIS MOD P00110 IS TO INCREASE OBLIGATED FUNDS FOR THE ASSOCIATED UAE UNIQUES EFFORTS. |
| 2024-01-12 | A00207 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP. |
| 2024-01-12 | A00204 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF PROPERTY TO THIS CONTRACT. |
| 2024-01-12 | A00203 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| 2023-12-15 | P00108 | Supplemental agreement (work within scope) | $598.0K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2023-12-15 | P00108 | Supplemental agreement (work within scope) | $0 | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2023-11-09 | A00202 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2023-11-09 | A00201 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2023-10-25 | A00197 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| 2023-09-29 | P00107 | Supplemental agreement (work within scope) | $2.56M | CONTRACT IS FOR APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FMS CUSTOMERS. THIS MOD IMPACTS UNITED KINGDOM (UK) AND UNITED ARAB EMIRATES (UAE) |
| 2023-09-25 | A00198 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE AUTHORIZATION FOR BORROW/PAYBACK OF GFP VIA RFAM. |
| 2023-09-22 | A00199 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2023-09-06 | A00194 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFP TO BE USED FOR THE PERFORMANCE OF THIS CONTRACT. |
| 2023-08-21 | P00106 | Change order definitized | $4.88M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES. DEFINITIZATION OF GENERATOR FEEDER FAULT AND FLIGHT MANAGEMENT COMPUTER EFFORTS, FUNDING FOR OVER AND ABOVE FOR LONGBOW CREW TRAINERS, INCORPORATION OF… |
| 2023-08-21 | P00106 | Change order definitized | $940.0K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES. DEFINITIZATION OF GENERATOR FEEDER FAULT AND FLIGHT MANAGEMENT COMPUTER EFFORTS, FUNDING FOR OVER AND ABOVE FOR LONGBOW CREW TRAINERS, INCORPORATION OF… |
| 2023-08-11 | P00105 | Administrative change | $2.35M | TO UPDATE THE SHIP IN PLACE DODAACS. |
| 2023-07-24 | A00190 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| 2023-07-14 | A00192 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2023-07-12 | A00191 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2023-07-12 | A00189 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2023-07-12 | A00180 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2023-05-17 | P00104 | Change order | $300.0K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2023-05-17 | P00104 | Change order | -$2.98M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2023-05-02 | P00102 | Supplemental agreement (work within scope) | $27.87M | UAE 9102AB 18 REMAN & 9111AD 1 NEW BUILD & UK 9004AB POP EXT TO 31SEP2023 & UPDATE SOW, CDRL, ADD CSDR |
| 2023-04-07 | A00188 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2023-03-17 | A00186 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2023-03-17 | A00183 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP. |
| 2023-03-17 | A00182 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP. |
| 2023-03-15 | P00103 | Administrative change | $0 | W58RGZ-16-C-0023 FULL RATE PRODUCTION OF APACHE ATTACK HELICOPTER LOTS 7-11 MULTI-YEAR CONTRACT |
| 2023-03-01 | P00101 | Change order | $4.21M | APACHE ATTACK HELICOPTER (AH-64E) OVER & ABOVE FUNDING AND LOADOUT DIRECTED CHANGE |
| 2023-02-02 | P00100 | Supplemental agreement (work within scope) | $6.09M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2023-01-24 | A00181 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2023-01-12 | A00179 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| 2023-01-12 | A00178 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP FROM THIS CONTRACT. |
| 2023-01-12 | A00177 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| 2023-01-12 | A00176 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP FROM THIS CONTRACT TO ANOTHER CONTRACT. |
| 2023-01-12 | A00175 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2022-12-22 | P00099 | Supplemental agreement (work within scope) | $0 | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| 2022-11-12 | P00098 | Administrative change | $0 | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILIARY SALES |
| 2022-10-25 | A00173 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| 2022-10-19 | A00170 | Administrative change | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-20). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗