Kiewit Infrastructure West Co. received this contract from W2SN Endist Alaska, Department of the Army: $316.63M obligated so far for construction of airport runways and taxiways. Its period of performance ended 2026-09-21.
Key facts · data as of Oct 22, 2026
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 22, 2026.
Cite this page: SpendQuery, Award W911KB22C0012, data as of Oct 22, 2026, https://spendquery.com/award?id=CONT_AWD_W911KB22C0012_9700_-NONE-_-NONE-
Kiewit Infrastructure West Co.: all federal awards · Department of Defense: spending · W2SN Endist Alaska: what it buys · The follow-on: recompete brief
JBE054 RUNWAY EXTENSION, JBER, ALASKA
Up for re-bid: ends 2026-09-21. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
263 subawards totaling $715.43M (226.0% of what was obligated), as Kiewit Infrastructure West Co. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Pruhs Construction Co., L.L.C. | $264.55M | 10 | AK | 2022-11-01 | 2022-11-01 |
| Northern Powerline Constructors, Inc. | $245.03M | 8 | AK | 2023-01-23 | 2023-01-23 |
| Bond Brothers LLC | $24.96M | 10 | AK | 2022-10-31 | 2022-10-31 |
| Ferguson Enterprises LLC | $23.13M | 8 | VA | 2023-02-27 | 2023-02-27 |
| R & M Consultants, Inc. | $21.84M | 10 | AK | 2023-03-10 | 2023-03-10 |
| Cooley Co. | $21.58M | 9 | AK | 2023-05-10 | 2023-05-10 |
| Atlas Group LLC | $18.36M | 10 | AK | 2022-11-29 | 2022-11-29 |
| Northwest Contracting, LLC | $15.34M | 10 | AK | 2023-05-08 | 2023-05-08 |
| Arctic Slope Regional Corporation | $12.49M | 1 | AK | 2023-09-29 | 2023-09-29 |
| Slana Surveys Inc | $11.66M | 9 | AK | 2023-02-10 | 2023-02-10 |
| H2 Pre-Cast, Inc | $8.38M | 10 | WA | 2023-04-14 |
128 actions since 2022-12-05. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-23 | A00081 | Change order | $10.0K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00081, CR00114-1 R00133 - PFAS CONCRETE RUBBLE |
| 2026-07-23 | A00080 | Change order | $4.9K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00080, CR00112-1, R00132 - JCP REALIGNMENT |
| 2026-07-22 | A00079 | Change order | $4.9K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00079, CR0111-1, R00131 - HANDHOLE AND GRADE RING |
| 2026-07-22 | A00078 | Change order | $1.5K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00078, CR00113-1, R00130 - BAK ANCHOR EPOXY |
| 2026-07-16 | P00049 | Supplemental agreement (work within scope) | $142.0K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00049, CR00095-2, R00128 - DESIGN CHANGE F PART 1B |
| 2026-06-12 | A00077 | Change order | $12.1K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00077, CR00109-1 R00126 - TAXIWAY N SIGNS |
| 2026-06-11 | A00076 | Change order | $30.1K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00076 CR00110-1 R00125 - GRADING CHANGES |
| 2026-06-02 | A00074 | Change order | $26.7K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00074, CR00107-1, R00123 - LIGHTING VAULT ACCESS ROAD |
| 2026-05-29 | P00047 | Change order | $3.00M | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00047, CR00084-3, CHARLIE LOOP ELEVATION PART 1C |
| 2026-05-27 | P00046 | Supplemental agreement (work within scope) | $591.5K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00046, CR00090, INCREASE CLIN 1007, 2025 |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-22). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
| 2023-04-14 |
| Summit Logistics Inc. | $6.53M | 9 | AK | 2022-10-25 | 2022-10-25 |
| Eklutna Services, LLC | $5.92M | 8 | AK | 2023-05-16 | 2023-05-16 |
| Gulf Shore Construction Services Inc. | $5.00M | 10 | LA | 2023-03-22 | 2023-03-22 |
| Shannon & Wilson Inc. | $4.08M | 10 | AK | 2022-10-22 | 2022-10-22 |
| Alaska Testlab, LLC | $3.78M | 1 | AK | 2023-02-21 | 2023-02-21 |
| Alaska Demolition LLC | $2.62M | 7 | AK | 2023-05-23 | 2023-05-23 |
| Alaska Professional Construction, Inc. | $2.43M | 12 | AK | 2022-12-10 | 2024-05-22 |
| Ancor Inc. | $2.39M | 10 | AK | 2023-02-02 | 2023-02-02 |
| Eklutna Construction & Maintenance, LLC | $2.21M | 1 | AK | 2023-02-14 | 2023-02-14 |
| Prism Design & Construction, LLC | $2.08M | 10 | AK | 2023-04-10 | 2023-04-10 |
| Forgen LLC | $1.73M | 10 | CA | 2023-03-03 | 2023-03-03 |
| Colaska, Inc. | $1.61M | 1 | AK | 2023-05-23 | 2023-05-23 |
| Cijo Enterprises LLC | $985.6K | 9 | FL | 2023-02-28 | 2023-02-28 |
| The Superior Group, Inc. | $735.0K | 10 | AK | 2023-01-23 | 2023-01-23 |
The 25 largest of 42; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2023-01-23 | Northern Powerline Constructors, Inc. | $30.99M | RUNWAY LIGHTING |
| 2023-01-23 | Northern Powerline Constructors, Inc. | $30.99M | RUNWAY LIGHTING |
| 2023-01-23 | Northern Powerline Constructors, Inc. | $30.51M | RUNWAY LIGHTING |
| 2023-01-23 | Northern Powerline Constructors, Inc. | $30.51M | RUNWAY LIGHTING |
| 2023-01-23 | Northern Powerline Constructors, Inc. | $30.51M | RUNWAY LIGHTING |
| 2023-01-23 | Northern Powerline Constructors, Inc. | $30.51M | RUNWAY LIGHTING |
| 2023-01-23 | Northern Powerline Constructors, Inc. | $30.51M | RUNWAY LIGHTING |
| 2023-01-23 | Northern Powerline Constructors, Inc. | $30.51M | RUNWAY LIGHTING |
| 2022-11-01 | Pruhs Construction Co., L.L.C. | $26.46M | PAVING |
| 2022-11-01 | Pruhs Construction Co., L.L.C. | $26.46M | PAVING |
| 2022-11-01 | Pruhs Construction Co., L.L.C. | $26.46M | PAVING |
| 2022-11-01 | Pruhs Construction Co., L.L.C. | $26.46M | PAVING |
| 2022-11-01 | Pruhs Construction Co., L.L.C. | $26.46M | PAVING |
| 2022-11-01 | Pruhs Construction Co., L.L.C. | $26.46M | PAVING |
| 2022-11-01 | Pruhs Construction Co., L.L.C. | $26.46M | PAVING |
| 2022-11-01 | Pruhs Construction Co., L.L.C. | $26.46M | PAVING |
| 2022-11-01 | Pruhs Construction Co., L.L.C. | $26.46M | PAVING |
| 2022-11-01 | Pruhs Construction Co., L.L.C. | $26.46M | PAVING |
| 2023-09-29 | Asrc Earthworks, LLC | $12.49M | ASPHALT PATCHING AND PAVING |
| 2023-02-21 | Alaska Testlab, LLC | $3.78M | QUALITY ASSURANCE |
| 2023-02-27 | Ferguson Enterprises LLC | $2.89M | CULVERT PIPE SUPPLY |
| 2023-02-27 | Ferguson Enterprises LLC | $2.89M | CULVERT PIPE SUPPLY |
| 2023-02-27 | Ferguson Enterprises LLC | $2.89M | CULVERT PIPE SUPPLY |
| 2023-02-27 | Ferguson Enterprises LLC | $2.89M | CULVERT PIPE SUPPLY |
| 2023-02-27 | Ferguson Enterprises LLC | $2.89M | CULVERT PIPE SUPPLY |
| 2026-05-18 |
| A00073 |
| Change order |
| $24.7K |
| JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00073, CR00106-1, R00121 - DESIGN CHANGE TXY M |
| 2026-05-04 | A00072 | Supplemental agreement (work within scope) | $206.6K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00072 CR00099-2 R00119 - LIGHTING ON TAXIWAY M |
| 2026-04-30 | A00071 | Change order | $25.1K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00071, CR00105-1, R00118 - DIFFERING SITE CONDITION J |
| 2026-04-28 | A00070 | Supplemental agreement (work within scope) | $0 | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00070, CR00101, 2026 INTERSECTION CLOSURE |
| 2026-04-21 | A00069 | Change order | $32.0K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00045, CR00059 - DU11 REMOVAL |
| 2026-04-20 | P00045 | Supplemental agreement (work within scope) | $3.93M | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00045, CR00059 - DU11 REMOVAL |
| 2026-04-07 | P00044 | Supplemental agreement (work within scope) | $255.5K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00044, CR00091-2 - HOLD LINE OFFSET PART 1B |
| 2026-03-24 | A00068 | Supplemental agreement (work within scope) | $34.1K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00068, CR00087, R00113 - DIFFERING SITE CONDITIONS, I |
| 2026-03-20 | A00067 | Supplemental agreement (work within scope) | $21.6K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00067, CR00094-2, R00112 - ASPHALT RELEASE AGENT |
| 2026-03-18 | A00066 | Supplemental agreement (work within scope) | $14.9K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00066, CR00096-2 R00111 - LIGHTING VAULT CULVERT |
| 2026-03-16 | A00065 | Supplemental agreement (work within scope) | -$271.7K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00065 CR00085-2 R00110 - DESCOPE NAV AID FOOTINGS PART 2 |
| 2026-03-09 | P00043 | Supplemental agreement (work within scope) | $30.4K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00064 CR00086-2 R00108 - WATERLINE REALIGNMENT - PART 2 |
| 2026-02-02 | A00064 | Supplemental agreement (work within scope) | $183.4K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00064 CR00086-2 R00108 - WATERLINE REALIGNMENT - PART 2 |
| 2026-01-28 | A00063 | Supplemental agreement (work within scope) | $2.1K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00063, CR00103-1 R00107 - ABOVE GROUND BAK ROOF DIMENSIONS |
| 2026-01-26 | A00062 | Supplemental agreement (work within scope) | $17.3K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00062, CR00098-2, R00106 - ASBESTOS PIPE AT TXY M |
| 2026-01-13 | A00061 | Supplemental agreement (work within scope) | $68.4K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00061 R00105 - ABOVE GROUND BAK ADJUSTMENT |
| 2025-12-17 | P00042 | Supplemental agreement (work within scope) | $242.2K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00042 ADMINISTRATIVE CORRECTION TO PAYMENT TERM DAYS FROM 30 TO 14 DAYS. |
| 2025-12-15 | P00041 | Administrative change | $0 | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00042 ADMINISTRATIVE CORRECTION TO PAYMENT TERM DAYS FROM 30 TO 14 DAYS. |
| 2025-12-04 | A00060 | Change order | $29.7K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00060, CR00095-1, R00103, DESIGN CHANGE F |
| 2025-11-12 | P00040 | Supplemental agreement (work within scope) | -$232.1K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00040, CR00082-2 R0010 PCC TO HMA PART 2 |
| 2025-10-22 | A00059 | Change order | $0 | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00059, CR00099-1, R00100 - LIGHTING ON TAXIWAY M |
| 2025-10-15 | A00058 | Change order | $19.0K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00058 CR00098-1, R00099 - ASBESTOS PIPE AT TXY M |
| 2025-10-08 | P00039 | Change order | $195.9K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00038 CR#44-2 - CHANGE ASPHALT BINDER, PART 2 |
| 2025-09-29 | A00057 | Change order | $5.4K | BE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00057 CR00096-1 R00098 LIGHTING VAULT CULVERT |
| 2025-09-19 | A00056 | Change order | $17.6K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00056. CR00089-1, R00097 - DESIGN CHANGE, E |
| 2025-09-11 | A00055 | Change order | $8.2K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00055 CR00092-1 R00096 - ABOVE GROUND BAK ADJUSTMENT |
| 2025-09-10 | A00054 | Change order | $7.8K | RUNWAY 16/34 MODIFICATION NO. A00054 R00095 CR00091-1 - HOLD LINE OFFSET |
| 2025-09-09 | P00038 | Change order | $0 | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00038 R00093 - CESSATION OF WORK DUE TO BASE SECURITY |
| 2025-08-25 | A00053 | Change order | $2.5K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00053 R00094 - ASPHALT RELEASE AGENT |
| 2025-08-13 | A00052 | Change order | $21.6K | BE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00052 CR00086-1, R00091 - WATERLINE REALIGNMENT |
| 2025-08-05 | A00051 | Change order | $3.5K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00051 R00090 CR00088-1 RAISE EXISTING CATCH BASIN |
| 2025-08-05 | A00050 | Change order | $0 | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00050 R00089 CR#85-1 - DESCOPE NAV AID |
| 2025-07-24 | A00049 | Change order | $127.2K | JBE054 CI#84-1 A00049 |
| 2025-07-24 | A00048 | Change order | $70.0K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00048 CR00036 R00087 INCREASE CLIN 1005 POL STOCKPILE QTY |
| 2025-07-11 | A00047 | Change order | $17.8K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00047 CR00062, R00086 - BAK STRUCTURE ADJUSTMENT |
| 2025-07-10 | P00037 | Supplemental agreement (work within scope) | $3.17M | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00037, CR#42 R00084 - EXCESS PEAT NORTH OF AIRLIFTER |
| 2025-06-27 | A00046 | Change order | $102.5K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00046 R00085, CR00074 - DIFFERING SITE CONDITIONS, H |
| 2025-06-25 | A00045 | Change order | $71.9K | JBE054 EXTEND RUNWAY 16/34 A00045 R00083-CR#69, DIFFERING SITE CONDITION, G |
| 2025-06-18 | P00036 | Change order | $484.3K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00036 R00082, CI#70-2 ARMOUR NORTH DITCH, PART 2 |
| 2025-06-13 | A00044 | Supplemental agreement (work within scope) | $0 | BE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00044 R00081 CI#83 WEATHER TIME EXTENSION AUG 24 - APR 25 |
| 2025-06-11 | A00043 | Change order | $42.8K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00043 CI#72-2 R00080 AIRLIFTER RD DITCH 109+25 - 113+80 PART2 |
| 2025-06-09 | P00035 | Change order | $3.36M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY TAXIWAY D - LANDFILL LF06 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA REFERENCE NO. R00074 |
| 2025-05-21 | A00042 | Change order | $56 | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00042 R00079 - NAV AID CHANGES PART 1 |
| 2025-05-16 | P00034 | Change order | $0 | CONSTRUCT RUNWAY EXTENSION / TAXIWAY CONTRACT JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00034 R00077 - PCC TO HMA PART 1 |
| 2025-05-16 | A00041 | Change order | $150.5K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00041 R00078 - CI#79-1 LIGHTING VAULT AND BAK STRUCTURE CHANGES |
| 2025-05-12 | P00033 | Change order | $1.24M | DESIGN CHANGE D, CI#76 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA |
| 2025-05-09 | P00032 | Change order | $573.9K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00033 R00075 - DESIGN CHANGES, C |
| 2025-04-30 | A00040 | Change order | -$34.0K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY TAXIWAY N CHANGES CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA REFERENCE NO. R00073 |
| 2025-04-18 | P00031 | Change order | $450.0K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY JBE054 MOD P00031 CI#78-1 INCREASE CLIN 1006 RCRA STOCKPILE PART 1 |
| 2025-04-17 | P00030 | Supplemental agreement (work within scope) | $3.39M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY, P00030, CI#67-3 |
| 2025-04-03 | P00029 | Administrative change | $0 | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - IMPLEMENT EXECUTIVE ORDER 14173 |
| 2025-02-25 | A00039 | Supplemental agreement (work within scope) | $11.2K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - JBE054 A00038 BAK, HEAT TRACE, RMA LOT SIZE CI73 |
| 2025-02-21 | P00028 | Change order | $1.10M | JBE054 P00028 CI#67-2 |
| 2025-01-13 | A00038 | Supplemental agreement (work within scope) | $11.5K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - PART 2 FOR 00055-2 MANHOLE DEMO AND COMM DUCT REROUTE JBE054 CHANGE |
| 2024-12-06 | A00037 | Supplemental agreement (work within scope) | $70.2K | W911KBC0012 JBE054 EXTEND RUNWAY 16/34, MODIFICATION NO. A00037 CR00063-2 REMOVAL OF LIGHTING DUCT BANK, PART 2 |
| 2024-11-21 | P00027 | Supplemental agreement (work within scope) | -$3.00M | MILL AND OVERLAY INTERSECTION CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00047 00053 MILL AND OVERLAY INTERSECTION |
| 2024-11-01 | A00036 | Supplemental agreement (work within scope) | $394.2K | EXECUTED MODIFICATION FOR CONTRACT W911KB22C0012, JBE054 EXTEND RUNWAY, 16/34, JBER, ALASKA, MODIFICATION NO. A00036, CR00052-2 INSTALL CULVERT AND RAISE AIRLIFTER, PART 2 |
| 2024-10-24 | P00026 | Change order | $2.20M | NORTHEAST DRAINAGE, PART 1 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00063 00067-1 NORTHEAST DRAINAGE, PART 1 |
| 2024-10-09 | A00035 | Supplemental agreement (work within scope) | $167.6K | REROUTE GAS LINE, PART 2 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00060 00058-2 REROUTE GAS LINE, PART 2 |
| 2024-10-04 | A00034 | Change order | $15.0K | AIRLIFTER RD DITCH 109+25 - 113+80 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00062 00072-1 AIRLIFTER RD DITCH 109+25 - 113+80 |
| 2024-09-30 | P00025 | Supplemental agreement (work within scope) | $33.90M | SOUTH RUNWAY CORRECTION, PART 2 - FINAL CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00061 00018-3 SOUTH RUNWAY CORRECTION, PART 2 FINAL |
| 2024-09-05 | P00024 | Change order | $335.0K | ARMOUR NORTH DITCH, PART 1 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00059 00070-1 ARMOUR NORTH DITCH, PART 1 |
| 2024-08-28 | A00033 | Supplemental agreement (work within scope) | $0 | WEATHER TIME EXTENSION JAN 24 - JUL 24 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00058 00068 WEATHER TIME EXTENSION JAN 24 - JUL 24 |
| 2024-08-28 | A00032 | Supplemental agreement (work within scope) | $9.1K | 24 STRAND TO THE SOUTH, PART 2 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00057 00061-2 24 STRAND TO THE SOUTH, PART 2 |
| 2024-08-26 | A00031 | Supplemental agreement (work within scope) | $619 | SPLICE EQUIPMENT FOR 18220, PART 2 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00056 00066-2 SPLICE EQUIPMENT FOR 18220, PART 2 |
| 2024-08-26 | A00030 | Change order | $0 | TAXIWAY N CHANGES CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00055 00065-1 TAXIWAY N CHANGES |
| 2024-08-23 | A00029 | Supplemental agreement (work within scope) | $1.9K | INCREASE MULCH APPLICATION RATE, PART 2 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00054 00064-2 INCREASE MULCH APPLICATION RATE, PART 2 |
| 2024-08-21 | A00028 | Supplemental agreement (work within scope) | $99.8K | EXTEND COMM CABLE TO MH506, PART 2 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00053 00060-2 EXTEND COMM CABLE TO MH506, PART 2 FINAL |
| 2024-08-16 | P00023 | Supplemental agreement (work within scope) | -$179.9K | TOPSOIL CHANGE, NORTH FILL CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. |
| 2024-07-15 | A00027 | Change order | -$1.2K | A00027 CR00051 CHANGE TAXIWAY N5 TO A USED TAXIWAY CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. |
| 2024-07-12 | A00026 | Change order | $5.0K | SPLICE EQUIPMENT FOR 18220, PART 1, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00050, 00066-1 SPLICE EQUIPMENT FOR 18220, PART 1 |
| 2024-07-11 | P00022 | Supplemental agreement (work within scope) | $589.4K | CONSTRUCT AIRCRAFT ARRESTING SYSTEMS, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00049, 00011 CONSTRUCT AIRCRAFT ARRESTING SYSTEMS |
| 2024-06-25 | P00021 | Change order | -$100.0K | MILL AND OVERLAY INTERSECTION, PART 1A, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00047, CR00053-1 MILL AND OVERLAY INTERSECTION, PART 1A |
| 2024-06-21 | A00025 | Change order | $90.0K | INSTALL CULVERT AND RAISE AIRLIFTER, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00048, 00052-1 INSTALL CULVERT AND RAISE AIRLIFTER |
| 2024-06-05 | A00024 | Change order | $10.0K | REMOVAL OF LIGHTING DUCT BANK, PART 1, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00046, 00063-1 REMOVAL OF LIGHTING DUCT BANK, PART 1 |
| 2024-06-04 | A00023 | Change order | $12.0K | 24 STRAND TO THE SOUTH, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00045 00061-1 24 STRAND TO THE SOUTH, PART 1 |
| 2024-05-23 | A00022 | Change order | $50.0K | INCREASE MULCH APPLICATION RATE, PART 1, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00044, 00064-1 INCREASE MULCH APPLICATION RATE, PART 1 |
| 2024-05-22 | A00021 | Supplemental agreement (work within scope) | $155.8K | DDC AND UPS FOR GENERATOR ROOM, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA., REFERENCE NO. R00040, 00043 DDC AND UPS FOR GENERATOR ROOM |
| 2024-05-20 | P00020 | Change order | $21.0K | CHANGE ASPHALT BINDER, PART 1, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA., REFERENCE NO. R00042, 00044-1 CHANGE ASPHALT BINDER, PART 1 |
| 2024-05-17 | A00020 | Change order | $94.0K | EXTEND COMM CABLE TO MH506, PART 1, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00041, 00060-1 EXTEND COMM CABLE TO MH506, PART 1 |
| 2024-05-17 | A00019 | Change order | $21.0K | REROUTE GAS LINE, PART 1, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00039 00058-1 REROUTE GAS LINE, PART I |
| 2024-05-15 | A00018 | Change order | $108.4K | BINDER AND MIX DESIGN TESTING, PART 2, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. |
| 2024-04-25 | P00019 | Supplemental agreement (work within scope) | -$479.9K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA., REFERENCE NO. R00037, 00050 CHANGE GRASS SEED |
| 2024-04-05 | A00017 | Change order | $6.0K | MANHOLE DEMO AND COMM DUCT REROUTE, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00036, 00055-1 MANHOLE DEMO AND COMM DUCT REROUTE |
| 2024-03-20 | P00018 | Change order | $8.00M | SOUTH RUNWAY CORRECTION, PART 1B CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00035 00018-2 SOUTH RUNWAY CORRECTION, PART 1B |
| 2024-02-26 | A00016 | Supplemental agreement (work within scope) | $85.5K | CONCR026 & CR030, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00034 00026 ANNULAR SPACE FOR P606 SEALANT, 00030 SEPTEMBER 11 RAMP FREEZE |
| 2024-02-12 | A00015 | Supplemental agreement (work within scope) | $0 | WEATHER DELAYS JUNE 23- DEC 23 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00033 CR00049 WEATHER DELAYS JUNE 23- DEC 23 |
| 2023-12-20 | P00017 | Administrative change | -$0 | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - ADMINISTRATIVELY CORRECTS $0.03 CENT ERROR ON TOTAL CONTRACT VALUE (CORRECTS CLIN 0001) AND ADMINISTRATIVELY CORRECTS MOD A00004 AND PLACES THE A00004 $33K ON THE CORRECT CLIN 1003 VICE CLIN 0001. |
| 2023-12-14 | P00016 | Administrative change | $97.36M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY INCREMENTAL FUNDING |
| 2023-12-06 | A00014 | Supplemental agreement (work within scope) | $616.8K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - CR00040 CHANGE RCRA DISPOSAL- CLIN0018 ONLY |
| 2023-11-20 | P00015 | Change order | $36.0K | INCREASE CLIN 1006 RCRA QUANTITY, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00029, 00039 INCREASE CLIN 1006 RCRA QUANTITY |
| 2023-11-14 | A00013 | Change order | $9.6K | PAPI FOUNDATION, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. |
| 2023-11-09 | A00012 | Change order | $27.5K | DIFFERING SITE CONDITION, E, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00027, 00035-1 DIFFERING SITE CONDITION, E SEE PAGE 2. |
| 2023-11-07 | A00011 | Change order | $74.5K | INSTALL COMM AROUND OBSTRUCTION, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00026 00037-1 INSTALL COMM AROUND OBSTRUCTION |
| 2023-11-02 | P00014 | Supplemental agreement (work within scope) | $325.0K | P00014 CI #33-2 INCREASE QTY TO CLIN 1007, PART 2 |
| 2023-10-24 | A00010 | Change order | $37.6K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY |
| 2023-10-20 | A00009 | Change order | -$251.1K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY |
| 2023-10-18 | P00013 | Change order | $325.0K | P00013 CI #33-1 INCREASE QTYS TO CLIN 1007 |
| 2023-10-03 | A00008 | Change order | $43.8K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00021, CR00023-1 DIFFERING SITE CONDITION, C, PART I |
| 2023-09-14 | A00007 | Change order | $12.6K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00020, 00028-1 DESIGN CHANGES B |
| 2023-09-13 | A00006 | Change order | $19.1K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00019, 00024 DESIGN CHANGES A |
| 2023-08-30 | P00012 | Change order | $276.5K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00018 00027-1 FEEDER 42 ALIGNMENT |
| 2023-08-18 | A00005 | Change order | $55.2K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00017, CR00020-1 DIFFERING SITE CONDITIONS, B |
| 2023-08-09 | P00011 | Change order | $22.0K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00015 00021-1 16" WATER LINE CONFLICT |
| 2023-07-28 | P00010 | Change order | -$97.7K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34. REFERENCE NO. R00014 00014 ELECTRICAL TRENCH AND BACKFILL |
| 2023-07-20 | P00009 | Change order | $3.51M | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34. REFERENCE NO. R00013 00018-1 SOUTH RUNWAY CORRECTION |
| 2023-07-18 | A00004 | Change order | $23.9K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34. REFERENCE NO. R00012 00019-1 DIFFERING SITE CONDITIONS, A |
| 2023-06-16 | A00003 | Supplemental agreement (work within scope) | $0 | REFERENCE NO. R00010 00016 WEATHER TIME EXTENSION AUG 22 - MAY 23 |
| 2023-06-14 | A00002 | Supplemental agreement (work within scope) | $18.2K | REFERENCE NO. R00009 00012 DAY TANK UPSIZING |
| 2023-05-25 | P00008 | Option exercised | $2.40M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - EXERCISE CLIN 0017 AND 0018 |
| 2023-05-18 | P00007 | Administrative change | $57.25M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - INCREMENTAL FUNDING |
| 2023-04-11 | P00006 | Administrative change | $0 | CONSTRUCT RUNWAY EXTENSION / TAXIWAY |
| 2023-04-07 | P00005 | Administrative change | $86.00M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY |
| 2023-03-31 | P00004 | Option exercised | $2.47M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY EXERCISE OPTIONS |
| 2023-03-29 | A00001 | Change order | $0 | REFERENCE NO. R00004 00002 ON-SITE TOPSOIL SPECIFICATION REVISION |
| 2023-03-28 | P00003 | Supplemental agreement (work within scope) | $332.9K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - MODIFICATION TO CLIN 0004 FOR CHANGE REQUEST #00004 EAST HAUL ROAD CHANGES. |
| 2023-03-08 | P00002 | Change order | $0 | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34. REFERENCE NO. R00002 CR00001 FILL MATERIAL SPECIFICATION REVISION |
| 2022-12-05 | P00001 | Administrative change | $0 | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - |