DESIGN A TWO STORY F-35 BUILDING
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
6 subawards totaling $178.2K (4.0% of what was obligated), as Burns & Mcdonnell Engineering Company, Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Moca Systems, Inc | $124.3K | 5 | MA | 2024-02-18 | 2025-04-17 |
| Strategic Value Solutions, Inc. | $53.9K | 1 | MO | 2024-05-01 | 2024-05-01 |
| Date | To | Amount | For |
|---|---|---|---|
| 2024-05-01 | Strategic Value Solutions, Inc. | $53.9K | VALUE ENGINEERING |
| 2024-10-15 | Moca Systems, Inc | $46.0K | SUBMITTAL BASE BID 35%, SUBMITTAL OPTION 1 VE STUDY AND 65%, SUBMITTAL BASE BID 65% MOD 04 OPTION 1, SUBMITTAL OPTION 2 95%, SUBMITTAL OPTION CSRA |
| 2024-02-18 | Moca Systems, Inc | $37.3K | SUBMITTAL BASE BID 35% |
| 2024-02-18 | Moca Systems, Inc | $36.8K | SUBMITTAL BASE BID 35%, SUBMITTAL OPTION 1 VE STUDY AND 65% |
| 2025-04-17 | Moca Systems, Inc | $22.3K | SUBMITTAL BASE BID 35%, SUBMITTAL OPTION 1 VE STUDY AND 65%, SUBMITTAL BASE BID 65% MOD 04 OPTION 1, SUBMITTAL OPTION 2 95%, CSRA, FINAL 95% DESIGN COST ESTIMATE, CORRECTED FINAL 100% DESIGN COST ESTIMATE |
| 2024-11-21 | Moca Systems, Inc | -$18.0K | SUBMITTAL BASE BID 35%, SUBMITTAL OPTION 1 VE STUDY AND 65%, SUBMITTAL BASE BID 65% MOD 04 OPTION 1, SUBMITTAL OPTION 2 95%, SUBMITTAL OPTION CSRA |
7 actions since 2023-12-21. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2025-01-15 | P00006 | Option exercised | $322.1K | ARCHITECT ENGINEER (AE) DESIGH OF F-35 SQUAD OPERATIONS MISSION PLANNING FACILITY EBBING AIR NATIONAL GURAD FACILITY. |
| 2024-09-26 | P00005 | Supplemental agreement (work within scope) | $2.30M | ARCHITECT AND ENGINEER SERVICES FOR COMPLETE DESIGN BID BUILD (D-B-B) FOR EBBING AIR NATIONAL GUARD (ANG) AIR FORCE BASE, FORT SMITH, AR |
| 2024-07-12 | P00004 | Supplemental agreement (work within scope) | $0 | DESIGN A TWO STORY F-35 BUILDING |
| 2024-05-23 | P00003 | Supplemental agreement (work within scope) | $190.8K | MODIFICATION TO INCREASE TOPOGRAPHIC SURVEY AND GEOTECH INVESTIGATION REQUIREMENTS |
| 2024-04-19 | P00002 | Option exercised | $705.8K | EXERCISE OPTION 1 FOR 65% DESIGN SUBMITTAL OF THE F-35 PROJECT AT EBBING AFB IN LITTLE ROCK, AR. |
| 2024-01-11 | P00001 | Administrative change | $0 | ADMIN MOD TO CORRECT CAGE CODE. |
| 2023-12-21 | 0 | $986.7K | DESIGN A TWO STORY F-35 BUILDING |