CONSTRUCTION OF THE B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) ELLSWORTH AFB, SD
Up for re-bid: ends 2027-01-26. Recompete brief → · Industry Day - Space Force Operations Centers - Various Locations ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
40 subawards totaling $148.57M (71.1% of what was obligated), as BL Harbert International LLC reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Lee Earley, Inc. | $26.29M | 1 | SD | 2024-04-25 | 2024-04-25 |
| Bergelectric Corp | $23.77M | 1 | CA | 2024-05-13 | 2024-05-13 |
| Precision Resources, Inc. | $23.71M | 1 | FL | 2024-06-07 | 2024-06-07 |
| Baker Concrete Construction Inc | $22.06M | 1 | OH | 2024-07-10 | 2024-07-10 |
| Crane Technologies Group, Inc. | $7.86M | 1 | MI | 2024-10-10 | 2024-10-10 |
| Southwest Concrete Paving Co | $7.26M | 1 | AZ | 2024-06-26 | 2024-06-26 |
| SGH Redglaze Holdings Inc | $5.61M | 1 | NE | 2024-07-26 | 2024-07-26 |
| Diversified Interiors of El Paso, Inc | $4.60M | 1 | TX | 2024-07-16 | 2024-07-16 |
| Lloyd Roofing Inc | $4.38M | 1 | FL | 2024-10-09 | 2024-10-09 |
| Black Security Products, LLC. | $2.97M | 1 | TX | 2024-04-18 | 2024-04-18 |
| Hagen Glass, Windows & Siding, Inc | $2.92M | 1 | SD | 2024-07-23 | 2024-07-23 |
| Black Hills Hydro-Turf, Inc. | $2.24M | 1 | SD | 2024-10-01 | 2024-10-01 |
| Fluid Solutions LLC | $1.83M | 1 | AL | 2024-06-05 | 2024-06-05 |
| S. David & Co., LLC | $1.81M | 1 | FL | 2024-05-01 | 2024-05-01 |
| Api Group Life Safety USA LLC | $1.59M | 1 | CO | 2024-07-02 | 2024-07-02 |
| J & J Asphalt Co | $1.16M | 1 | SD | 2024-07-30 | 2024-07-30 |
| W.D. Masonry and Concrete, Inc. | $896.7K | 1 | SD | 2024-06-21 | 2024-06-21 |
| Abg Caulking Contractors, Inc. | $856.3K | 1 | TN | 2024-07-23 | 2024-07-23 |
| Cedar Investment Group LLC | $843.4K | 1 | IA | 2024-05-30 | 2024-05-30 |
| Environmental Action, Inc. | $746.3K | 1 | OK | 2024-08-13 | 2024-08-13 |
| Broncho Co | $713.5K | 1 | MN | 2024-06-17 | 2024-06-17 |
| FMG Inc | $552.7K | 1 | SD | 2024-04-15 | 2024-04-15 |
| American Door and Hardware, LLC | $518.5K | 1 | FL | 2024-09-09 | 2024-09-09 |
| Well-Kaw, Inc | $428.8K | 1 | OH | 2024-06-24 | 2024-06-24 |
| Apco Building Specialties Inc | $379.3K | 1 | TX | 2024-11-13 | 2024-11-13 |
The 25 largest of 40; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2024-04-25 | Lee Earley, Inc. | $26.29M | SITEWORK & UTILITIES |
| 2024-05-13 | Bergelectric Corp | $23.77M | ELECTRICAL AND LOW VOLTAGE |
| 2024-06-07 | Precision Mechanical Inc | $23.71M | HVAC, PLUMBING & FUEL SYSTEM |
| 2024-07-10 | Baker Concrete Construction Inc | $22.06M | CAST-IN-PLACE CONCRETE |
| 2024-10-10 | Crane Technologies Group, Inc. | $7.86M | OVERHEAD CRANES |
| 2024-06-26 | Southwest Concrete Paving Co | $7.26M | CONCRETE PAVING |
| 2024-07-26 | SGH Redglaze Holdings Inc | $5.61M | METAL WALL PANELS |
| 2024-07-16 | Diversified Interiors of El Paso, Inc | $4.60M | ROUGH CARPENTRY, INSULATION, METAL FRAMING, DRYWALL, ACOUSTICAL CEILINGS, ACOUSTICAL WALL PANELS, DEFENSE FIGHTING POSITION, ALUMINUM PLENUM FRAMING, RF SHIELDING, AND BULLET RESISTANT PANELS |
| 2024-10-09 | Lloyd Roofing Inc | $4.38M | ROOFING |
| 2024-04-18 | Black Security Products, LLC. | $2.97M | PHYSICAL SECURITY |
| 2024-07-23 | Hagen Glass, Windows & Siding, Inc | $2.92M | GLASS, GLAZING, BULLET RESISTANT LOUVERS, AND ARCHITECTURAL LOUVERS |
| 2024-10-01 | Black Hills Hydro-Turf, Inc. | $2.24M | LANDSCAPING |
| 2024-06-05 | Fluid Solutions LLC | $1.83M | HAZARDOUS AND WATER STORAGE TANKS |
| 2024-05-01 | S. David & Co., LLC | $1.81M | PAINTING |
| 2024-07-02 | Api Group Life Safety USA LLC | $1.59M | FIRE PROTECTION |
| 2024-07-30 | J & J Asphalt Co | $1.16M | ASPHALT PAVING, ASPHALT MILL/OVERLAY, TRAFFIC SIGNS AND WHEEL STOPS |
| 2024-06-21 | W.D. Masonry and Concrete, Inc. | $896.7K | MASONRY |
| 2024-07-23 | Abg Caulking Contractors, Inc. | $856.3K | WATERPROOFING, JOINT SEALANTS & AIR BARRIER |
| 2024-05-30 | Cedar Investment Group LLC | $843.4K | VERTICAL LIFT DOOR INSTALL & FURNISH AND INSTALL OVERHEAD DOORS |
| 2024-08-13 | Apex Industries Inc | $746.3K | FIREPROOFING & SPRAY FOAM INSULATION |
| 2024-06-17 | Broncho Co | $713.5K | VERTICAL LIFT DOORS |
| 2024-04-15 | FMG Inc | $552.7K | MATERIAL TESTING & SPECIAL INSPECTIONS |
| 2024-09-09 | American Door and Hardware, LLC | $518.5K | DOORS, FRAMES & HARDWARE |
| 2024-06-24 | Well-Kaw, Inc | $428.8K | SECURE ENTRY PORTALS & ACCESS CONTROL PORTAL |
| 2024-11-13 | Apco Building Specialties Inc | $379.3K | DOOR ASSEMBLIES, DOORS, AND HARDWARE INSTALL |
30 actions since 2024-01-18. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-06-15 | P00005 | Administrative change | $0 | SPECIAL WEAPON MAINTENANCE SHOP OR MORE COMMONLY REFERRED TO AS A WEAPONS GENERATION FACILITY (WGF) THAT IS A CONSOLIDATED, HARDENED FACILITY WITHIN A PROTECTIVE ZONE, WITH CONSOLIDATED STORAGE, MAINTENANCE, INSPECTION, AND ADMINISTRATIVE FUNCTIONS. |
| 2026-05-20 | A00024 | Supplemental agreement (work within scope) | $147.2K | SPECIAL WEAPON MAINTENANCE SHOP OR MORE COMMONLY REFERRED TO AS A WEAPONS GENERATION FACILITY (WGF) THAT IS A CONSOLIDATED, HARDENED FACILITY WITHIN A PROTECTIVE ZONE, WITH CONSOLIDATED STORAGE, MAINTENANCE, INSPECTION, AND ADMINISTRATIVE FUNCTIONS. |
| 2026-04-14 | A00023 | Supplemental agreement (work within scope) | $246.8K | SPECIAL WEAPON MAINTENANCE SHOP OR MORE COMMONLY REFERRED TO AS A WEAPONS GENERATION FACILITY (WGF) THAT IS A CONSOLIDATED, HARDENED FACILITY WITHIN A PROTECTIVE ZONE, WITH CONSOLIDATED STORAGE, MAINTENANCE, INSPECTION, AND ADMINISTRATIVE FUNCTIONS. |
| 2026-03-09 | A00022 | Supplemental agreement (work within scope) | $98.2K | SPECIAL WEAPON MAINTENANCE SHOP OR MORE COMMONLY REFERRED TO AS A WEAPONS GENERATION FACILITY (WGF) THAT IS A CONSOLIDATED, HARDENED FACILITY WITHIN A PROTECTIVE ZONE, WITH CONSOLIDATED STORAGE, MAINTENANCE, INSPECTION, AND ADMINISTRATIVE FUNCTIONS. |
| 2026-03-02 | A00021 | Supplemental agreement (work within scope) | $175.3K | SPECIAL WEAPON MAINTENANCE SHOP OR MORE COMMONLY REFERRED TO AS A WEAPONS GENERATION FACILITY (WGF) THAT IS A CONSOLIDATED, HARDENED FACILITY WITHIN A PROTECTIVE ZONE, WITH CONSOLIDATED STORAGE, MAINTENANCE, INSPECTION, AND ADMINISTRATIVE FUNCTIONS. |
| 2026-02-09 | A00020 | Supplemental agreement (work within scope) | $42.2K | SPECIAL WEAPON MAINTENANCE SHOP OR MORE COMMONLY REFERRED TO AS A WEAPONS GENERATION FACILITY (WGF) THAT IS A CONSOLIDATED, HARDENED FACILITY WITHIN A PROTECTIVE ZONE, WITH CONSOLIDATED STORAGE, MAINTENANCE, INSPECTION, AND ADMINISTRATIVE FUNCTIONS. |
| 2026-01-22 | A00019 | Supplemental agreement (work within scope) | $36.7K | SPECIAL WEAPON MAINTENANCE SHOP OR MORE COMMONLY REFERRED TO AS A WEAPONS GENERATION FACILITY (WGF) THAT IS A CONSOLIDATED, HARDENED FACILITY WITHIN A PROTECTIVE ZONE, WITH CONSOLIDATED STORAGE, MAINTENANCE, INSPECTION, AND ADMINISTRATIVE FUNCTIONS. |
| 2025-11-25 | P00004 | Funding only | $30.12M | INCREMENT 3 FUNDING MOD |
| 2025-11-21 | A00018 | Supplemental agreement (work within scope) | $42.1K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) - R00042 INSTALL ADDITIONAL DIRECT BURIED CONDUITS |
| 2025-11-17 | A00017 | Supplemental agreement (work within scope) | $14.8K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) - R00037 RESIZE LOUVERS L177A AND L177B |
| 2025-10-08 | A00016 | Supplemental agreement (work within scope) | $141.7K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) - R00034 (R/28 ECF AVB MOD R/34 VARI GEOGRID W GEOTEXTILE) |
| 2025-09-11 | P00003 | Option exercised | $902.5K | CONSTRUCTION OF WGF: EXERCISE OPTION CLINS 0006/0009 |
| 2025-08-26 | A00015 | Supplemental agreement (work within scope) | $173.1K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) - R00030 (R/20 EXISTING COMMUNICATION DUCT BANK COLLAPSE, MODIFICATION R/29 REVISE FLOOR AND BASE FINISH IN SECURE ROOM 01-156, AND R/30 KENNY RD SOLID WASTE SOILS) |
| 2025-06-26 | A00014 | Supplemental agreement (work within scope) | $75.4K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) - R00027 (R/7 W-GATE RD IMPROVE & R/27 DELETE EMH-118) |
| 2025-06-25 | P00002 | Administrative change | $0 | CONSTRUCTION OF WGF |
| 2025-05-19 | A00013 | Supplemental agreement (work within scope) | $18.7K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) - R00025 STOREFRONT COLOR CHANGE |
| 2025-05-05 | A00012 | Supplemental agreement (work within scope) | $40.8K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) - R00026 VENTILATION CONTROL SEQUENCES REVISIONS |
| 2025-04-16 | A00011 | Supplemental agreement (work within scope) | $52.7K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) - R00024 (R00018 ESS PENETRATIONS, R00022 CONTAMINATED SOIL REMEDIATION & R00024 REVISE GRADE POINT ELEVATIONS) |
| 2025-03-19 | A00010 | Supplemental agreement (work within scope) | $251.0K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) - R00023 R/9 MOVE HAZ TANK AND R/23 TEMP POWER STUDY |
| 2025-01-15 | A00009 | Supplemental agreement (work within scope) | -$8.7K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) - R00019 REDUCE FIRE HYDRANT VALVES/PIPING SIZE |
| 2024-12-20 | A00008 | Supplemental agreement (work within scope) | $173.1K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) - R00015 EXISTING UTILITY LOCATIONS & HYDROVAC SLOT TRENCHING |
| 2024-11-21 | A00007 | Supplemental agreement (work within scope) | $37.0K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F), R00008 ADD VENT FOR FLOOR DRAINS, R00014 STORM DRAINAGE REVISIONS, AND R00016 FIRE RISER SLEEVES |
| 2024-11-05 | A00006 | Supplemental agreement (work within scope) | $7.0K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) R00012 / R00010-DOOR 03-103A AND R00012-STRIP AT EMBEDS |
| 2024-07-24 | A00005 | Supplemental agreement (work within scope) | $0 | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) R00005 REVISE GENERATOR SPEC SITE CONDITIONS |
| 2024-07-22 | P00001 | Funding only | $137.61M | CONSTRUCTION OF WGF-F - MODIFICATION TO INCORPORATE FUNDING INCREMENT 2 TO THE CONTRACT |
| 2024-07-16 | A00004 | Supplemental agreement (work within scope) | $4.8K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) R00003 MODIFY ALTITUDE VALVE |
| 2024-07-15 | A00003 | Supplemental agreement (work within scope) | $0 | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) R00004 MONITORING WELL ADJUSTMENTS |
| 2024-04-24 | A00002 | Supplemental agreement (work within scope) | $6.5K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) R00002 RTES TOWER DESIGN REVISIONS |
| 2024-04-16 | A00001 | Supplemental agreement (work within scope) | $466.1K | CD: B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) R00001 PROVIDE CONSTRUCTION TRAILER |
| 2024-01-18 | 0 | $37.93M | CONSTRUCTION OF THE B21 WEAPONS GENERATION FACILITY - SITE F (WGF-F) ELLSWORTH AFB, SD |