Putting the award page together from the records…
Putting the award page together from the records…
FY23 KC-46A 2-BAY PDM HANGAR AT TINKER AIR FORCE BASE, OKLAHOMA.
Up for re-bid: ends 2027-05-02. Recompete brief → · FY26 BOMBER AGILE COMMON HANGAR - TINKER AIR FORCE BASE (TAFB), OK ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
11 subawards totaling $44.35M (41.2% of what was obligated), as Harper Construction Company, Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| W&W-Afco Steel LLC | $16.46M | 1 | OK | 2025-04-24 | 2025-04-24 |
| Willmar Electric Service Corp | $8.78M | 1 | MN | 2025-04-02 | 2025-04-02 |
| Southwest Concrete Paving Co | $8.18M | 1 | AZ | 2025-07-08 | 2025-07-08 |
| Rangels Concrete LLC | $4.89M | 1 | OK | 2025-04-16 | 2025-04-16 |
| Industrial Door Contractors, Inc. | $1.64M | 1 | TN | 2025-04-22 | 2025-04-22 |
| Lift, Inc | $1.37M | 1 | WI | 2025-10-05 | 2025-10-05 |
| VSC Fire & Security, Inc | $1.30M | 1 | VA | 2025-07-03 | 2025-07-03 |
| Century Floor Coverings Inc | $801.3K | 1 | AZ | 2025-10-20 | 2025-10-20 |
| Cheyenne Services & Technologies, LLC | $441.4K | 1 | OK | 2025-09-02 | 2025-09-02 |
| Evan Corp | $432.9K | 1 | NC | 2025-10-20 | 2025-10-20 |
| B&H Construction, LLC | $48.5K | 1 | OK | 2026-04-27 | 2026-04-27 |
9 actions since 2025-02-28. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-06-15 | P00004 | Administrative change | $0 | PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO CHANGE THE SPECIFICATION SECTION GOVERNING ALL HANGAR BAY INTERIOR CONCRETE PAVING, INCLUDING REFERENCED 9 1/2 IN THICK SLAB-ON-GRADE, FROM SECTION 03 30 00 TO SECTION 32 13 14.13. |
| 2026-05-18 | A00004 | Supplemental agreement (work within scope) | $519.5K | PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO CHANGE THE SPECIFICATION SECTION GOVERNING ALL HANGAR BAY INTERIOR CONCRETE PAVING, INCLUDING REFERENCED 9 1/2 IN THICK SLAB-ON-GRADE, FROM SECTION 03 30 00 TO SECTION 32 13 14.13. |
| 2026-04-22 | A00003 | Supplemental agreement (work within scope) | $18.3K | ADD A NEW, DEDICATED WATER SUPPLY TO THE TORNADO SHELTER (FEMA ROOM) IN THE 2-BAY HANGAR IN ACCORDANCE WITH ICC 500. THE DEDICATED WATER SUPPLY SHOULD INCLUDE ALL FEATURES AND FIXTURES REQUIRED BY CODE, INCLUDING BACKFLOW VALVES AND METERS. |
| 2026-04-02 | P00003 | Option exercised | $831.8K | EXERCISE OPTS 1-4 (CLINS 0005-0008) |
| 2026-02-26 | A00002 | Supplemental agreement (work within scope) | $0 | CONTRACT NO. W912BV25C0007 KC-46A 2BAY PROGRAMMED DEPOT MAINTENANCE MODIFICATION NO. A00002 - WEATHER EXTENSION APR 25-JAN 26DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTIONHEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHE |
| 2025-10-03 | A00001 | Supplemental agreement (work within scope) | $32.4K | TG002 TERMITE CHEMICAL TREATMENT |
| 2025-06-05 | P00002 | Administrative change | $0 | KC-46A 2-BAY PDM HANGAR DEFINITIZE PERIOD OF PERFORMANCE END DATE FOR ACWS MIGRATION |
| 2025-04-09 | P00001 | Administrative change | $0 | ADMINISTRATIVE MOD IN ACCORDANCE WITH EXECUTIVE ORDERS |
| 2025-02-28 |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
| Date | To | Amount | For |
|---|---|---|---|
| 2025-04-24 | W&W-Afco Steel LLC | $16.46M | STRUCTURAL STEEL; MISC METALS |
| 2025-04-02 | Willmar Electric Service Corp | $8.78M | TEMPORARY POWER; SITE ELECTRICAL; BUILDING ELECTRICAL |
| 2025-07-08 | Southwest Concrete Paving Co | $8.18M | AIRFIELD CONCRETE PAVING |
| 2025-04-16 | Rangels Concrete LLC | $4.89M | SITE CONCRETE; REINFORCING STEEL/REBAR; BUILDING CONCRETE |
| 2025-04-22 | Industrial Door Contractors, Inc. | $1.64M | HANGAR DOORS |
| 2025-10-05 | Lift, Inc | $1.37M | BRIDGE CRANES |
| 2025-07-03 | VSC Fire & Security, Inc. | $1.30M | FIRE PROTECTION/SPRINKLERS |
| 2025-10-20 | Century Floor Coverings Inc | $801.3K | SEALED CONCRETE; RESILIENT TILE FLOORING; EPOXY FLOORING; CERAMIC TILE |
| 2025-09-02 | Cheyenne Services & Technologies, LLC | $441.4K | SECTIONAL OVERHEAD DOORS; GLASS AND GLAZING |
| 2025-10-20 | Evan Corp | $432.9K | HOISTS AND CRANES |
| 2026-04-27 | B&H Construction, LLC | $48.5K | SEWER LIFT STATION |
| 0 |
| $106.32M |
| FY23 KC-46A 2-BAY PDM HANGAR AT TINKER AIR FORCE BASE, OKLAHOMA. |