THE PROJECT WORK INCLUDES REPAIR BUILDING 1816 TO PROVIDE ADEQUATE STORAGE SPACE IN SUPPORT OF THE KC-46A BED DOWN AT JOINT BASE MCGUIRE. THE A/E SHALL PERFORM ALL ARCHITECTURAL AND ENGINEERING SERVICES SPECIFIED HEREIN FOR THIS PROJECT.
Up for re-bid: ends 2027-12-31. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
9 subawards totaling $201.5K (48.1% of what was obligated), as Jacobs/Ewingcole, a Joint Venture reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Quinlivan Pierik & Krause - Architects/Engineers LLP | $99.8K | 3 | NY | 2022-11-17 | 2023-11-01 |
| Crawford Consulting Services, Inc. | $50.9K | 4 | PA | 2022-10-19 | 2026-03-30 |
| MJ Engineering, Architecture, Landscape Architecture, and Land Surveying P.C. | $50.8K | 2 | NY | 2022-11-16 | 2023-08-10 |
| Date | To | Amount | For |
|---|---|---|---|
| 2022-10-19 | Crawford Consulting Services, Inc. | $54.9K | ENGINEERING SERVICES |
| 2023-11-01 | Quinlivan Pierik & Krause - Architects/Engineers LLP | $48.1K | GEOPHYSICAL SURVEYING AND MAPPING SERVICES |
| 2022-11-16 | MJ Engineering, Architecture, Landscape Architecture, and Land Surveying P.C. | $46.1K | SURVEYING AND MAPPING (EXCEPT GEOPHYSICAL) SERVICES |
| 2022-11-17 | Quinlivan Pierik & Krause - Architects/Engineers LLP | $30.4K | GEOPHYSICAL SURVEYING AND MAPPING SERVICES |
| 2023-05-25 | Quinlivan Pierik & Krause - Architects/Engineers LLP | $21.3K | GEOPHYSICAL SURVEYING AND MAPPING SERVICES |
| 2023-08-10 | MJ Engineering, Architecture, Landscape Architecture, and Land Surveying P.C. |
5 actions since 2023-05-05. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2025-09-29 | P00005 | Supplemental agreement (work within scope) | $0 | CHANGE PERFORMANCE PERIOD TO 1,977 DAYS FROM NOTICE TO PROCEED |
| 2025-06-03 | P00004 | Administrative change | $0 | 90% DESIGN SUBMISSION |
| 2024-06-18 | P00003 | Change order | $88.7K | ADD TASK 1: SLAB DESIGN (DESIGN) |
| 2023-09-29 | P00002 | Change order | $92.5K | 90% DESIGN SUBMISSION |
| 2023-05-05 | P00001 | Change order | $238.2K | ALL OTHER REQUIREMENTS AND INFORMATION FROM THE PREVIOUS TASK ORDER REMAIN IN EFFECT WITH THE FOLLOWING EXCEPTIONS: THE PERIOD OF PERFORMANCE (POP) SHALL BE EXTENDED BY 120 EAYS, AND THE CONSTRUCTION COST LIMIT IS INCREASED AS OUTLINE |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
| $4.7K |
| SURVEYING AND MAPPING (EXCEPT GEOPHYSICAL) SERVICES |
| 2023-07-31 | Crawford Consulting Services, Inc. | $3.6K | ENGINEERING SERVICES |
| 2026-03-30 | Crawford Consulting Services, Inc. | -$3.6K | ENGINEERING SERVICES |
| 2023-03-29 | Crawford Consulting Services, Inc. | -$4.0K | ENGINEERING SERVICES |