PORT MONMOUTH FLOOD REDUCTION PROJECT
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
16 actions since 2024-11-21. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-06-15 | A00011 | Change order | $203.0K | RFP-0019 (NS#023), BROADWAY AVENUE DRAINAGE CONCRETE CULVERT CONCRETE ENCASEMENT IS NEEDED DUE TO LACK OF COVER IN THE ROADWAY CROSSING AT BROADWAY IN PORT MONMOUTH. |
| 2026-06-12 | P00004 | Change order | $1.50M | RFP-0019 (NS#023), BROADWAY AVENUE DRAINAGE CONCRETE CULVERT CONCRETE ENCASEMENT IS NEEDED DUE TO LACK OF COVER IN THE ROADWAY CROSSING AT BROADWAY IN PORT MONMOUTH. |
| 2026-05-12 | P00003 | Option exercised | $400.0K | RFP-0019 (NS#023), BROADWAY AVENUE DRAINAGE CONCRETE CULVERT CONCRETE ENCASEMENT IS NEEDED DUE TO LACK OF COVER IN THE ROADWAY CROSSING AT BROADWAY IN PORT MONMOUTH. |
| 2026-04-24 | A00010 | Change order | $35.2K | RFP-0019 (NS#023), BROADWAY AVENUE DRAINAGE CONCRETE CULVERT CONCRETE ENCASEMENT IS NEEDED DUE TO LACK OF COVER IN THE ROADWAY CROSSING AT BROADWAY IN PORT MONMOUTH. |
| 2026-04-09 | P00002 | Change order | $3.60M | CAMPBELL AVENUE BRIDGE POLES AND WIRE TO BE REMOVED UP UNTIL JC2840MDT (RFP0017 PART2) 215881A55986 AND JC2840MDT TO BE DEADENED AND GUYED FOR DURATION OF CONSTRUCTION.POST CONSTRUCTION REQUIRES NEW POLES TO BE PLACED FOR JC-243MDT AND BT40189MDT |
| 2026-04-02 | A00009 | Change order | $431.6K | CAMPBELL AVENUE BRIDGE POLES AND WIRE TO BE REMOVED UP UNTIL JC2840MDT (RFP0017 PART2) 215881A55986 AND JC2840MDT TO BE DEADENED AND GUYED FOR DURATION OF CONSTRUCTION.POST CONSTRUCTION REQUIRES NEW POLES TO BE PLACED FOR JC-243MDT AND BT40189MDT |
| 2026-03-31 | A00008 | Change order | $246.2K | JCPL MATERIALS FOR PRIMARY RE-LOCATIONS REQUIRED TO SUPPLY POWER TO ROUTE 36 COMMERCIAL PROPERTY FOR FLOODWALL CONSTRUCTION ACCESS AT CAMPBELL AVENUE.JCPL WILL PROVIDE ALL MATERIALS DIRECTLY FOR THIS WORK. |
| 2026-03-13 | A00007 | Change order | $223.9K | JCPL MATERIALS FOR PRIMARY RE-LOCATIONS REQUIRED TO SUPPLY POWER TO ROUTE 36 COMMERCIAL PROPERTY FOR FLOODWALL CONSTRUCTION ACCESS AT CAMPBELL AVENUE.JCPL WILL PROVIDE ALL MATERIALS DIRECTLY FOR THIS WORK. |
| 2026-03-05 | A00006 | Change order | $61.8K | CONTRACT 4B, PORT MONMOUTH HURRICANE AND STORM DAMAGE REDUCTION. CONSTRUCTION OF FLOODWALLS, RETAINING WALLS, EARTHEN LEVEES, INTERIOR DRAINAGE FEATURES (SWALES, PONDING AREAS, DRAINAGE, PIPES), DEVELOPMENT OF PERMIT APPLICATIONS AND INCIDENTAL WORK. |
| 2026-03-04 | A00005 | Change order | $276.8K | CONTRACT 4B, PORT MONMOUTH HURRICANE AND STORM DAMAGE REDUCTION. CONSTRUCTION OF FLOODWALLS, RETAINING WALLS, EARTHEN LEVEES, INTERIOR DRAINAGE FEATURES (SWALES, PONDING AREAS, DRAINAGE, PIPES), DEVELOPMENT OF PERMIT APPLICATIONS AND INCIDENTAL WORK. |
| 2026-01-22 | A00004 | Change order | $177.7K | NS009 - WATER SAMPLING TO DELINEATE THE EXTENTS OF THE CONTAMINATED WATER. NS010 - NJDEP PERMIT ACQUISITION FOR CONTAMINATED WATER.NS011 - ADDITIONAL WATER SAMPLES TO DELINEATE THE EXTENTS OF THE CONTAMINATION WITHIN PROJECT LIMITS. |
| 2025-12-22 | A00003 | Change order | $285.3K | CHANGE: NS006 TITLE: 38 WILLOW AVE. - SHED REPLACEMENT CHANGE: NS007 TITLE: TEMPORARY CHAIN-LINK FENCECHANGE: NS008 TITLE: EXPLORATORY SOIL BORING AND REPORTING |
| 2025-09-15 | A00002 | Supplemental agreement (work within scope) | $23.3K | FLOODWALL REFERENCE NO: A00002, R00002 NS002 VERIZON OVERHEAD UTILITY LINES NS003 TOMSA - HOZIZONTAL LINES |
| 2025-08-07 | A00001 | Supplemental agreement (work within scope) | $443.8K | FLOODWALL REFERENCE NO: A00001, R00001 NS004 LEVEE SUBBASE - SELECT GRANULAR FILL |
| 2025-05-02 | P00001 | Administrative change | $0 | PORT MONMOUTH CONTRACT 4B |
| 2024-11-21 | 0 | $61.87M | PORT MONMOUTH FLOOD REDUCTION PROJECT |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-22). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗