IGF::OT::IGF REPLACEMENT OF MAIN UNIT GENERATOR TURBINE RUNNERS IN UNITS 1-14 AT MCNARY DAM POWERHOUSE, UMATILLA, OREGON, INCLUDING REWIND OF 3 MAIN UNIT GENERATORS.
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
215 subawards totaling $52.07M (34.3% of what was obligated), as GE Renewables US LLC reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Abs Machining Inc | $10.42M | 9 | ON | 2023-12-06 | 2025-12-19 |
| Liaoning Fu-An Heavy Industry Co.,ltd | $4.55M | 7 | 2023-04-27 | 2025-07-01 | |
| Groupe Lar Inc | $3.28M | 2 | QC | 2024-06-12 | 2025-06-23 |
| S.A.F.A.S. Societa' Azionaria Fonderia Acciai Speciali - S.P.A. | $3.09M | 4 | 2023-10-12 | 2024-08-13 | |
| CRC Distribution Inc | $2.52M | 2 | AL | 2024-08-09 | 2025-02-24 |
| Voestalpine Giesserei Traisen GMBH & Co KG | $2.26M | 2 | 2024-06-24 | 2025-06-04 | |
| Fabspec Inc | $2.23M | 7 | QC | 2024-01-26 | 2026-01-08 |
| Osi Precision Inc | $2.17M | 14 | QC | 2023-11-17 | 2026-01-29 |
| RMH Industries | $1.78M | 6 | QC | 2025-02-28 | 2025-09-18 |
| Pullman SST, Inc. | $1.73M | 2 | MD | 2025-11-26 | 2025-12-04 |
| Charl-Pol Inc | $1.43M | 10 | QC | 2025-04-18 | 2025-10-07 |
| LPTS, Proizvodnja Ulitkov in Modelov D.O.O. | $1.38M | 3 | 2023-12-01 | 2024-11-13 | |
| LP Custom Machining Limited | $1.04M | 9 | ON | 2024-09-19 | 2025-12-11 |
| Rossl E Duso SRL | $968.2K | 7 | 2024-05-03 | 2025-10-29 | |
| 3075109 Canada Inc | $860.3K | 3 | 2024-05-14 | 2025-08-06 | |
| Hancock Sandblast & Paint, LLC | $761.0K | 1 | WA | 2025-11-21 | 2025-11-21 |
| Central Oceans USA LLC | $706.5K | 7 | VA | 2024-03-12 | 2025-03-20 |
| Eurobearings SRL | $697.2K | 1 | IT-PC | 2026-01-07 | 2026-01-07 |
| Champlain Ep&C Inc. | $667.4K | 6 | 2023-11-08 | 2024-11-26 | |
| Usinage Deux Rives Inc | $597.2K | 11 | QC | 2024-06-28 | 2025-10-24 |
| Atelier D'Usinage CÔTÉ & Audet Inc. | $596.4K | 9 | QC | 2025-05-07 | 2026-01-30 |
| LDV Consultants Inc | $572.0K | 4 | 2023-07-07 | 2025-05-14 | |
| Adelard Soucy 1975 Inc | $521.2K | 1 | QC | 2025-03-28 | 2025-03-28 |
| Enscicon Corp | $470.0K | 3 | CO | 2024-05-02 | 2025-07-22 |
| Donako Spolka Z Ograniczona Odpowiedzialnoscia | $447.0K | 1 | 2024-08-08 | 2024-08-08 |
The 25 largest of 69; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2025-12-19 | Abs Machining Inc | $7.64M | MACHINE SHOPS SERVICES. |
| 2024-06-12 | Groupe Lar Inc | $3.20M | MACHINE SHOPS |
| 2023-12-11 | S.A.F.A.S. Societa' Azionaria Fonderia Acciai Speciali - S.P.A. | $2.62M | STEEL FOUNDRIES (EXCEPT INVESTMENT) |
| 2025-02-24 | CRC Distribution Inc | $2.60M | ALL OTHER PLASTICS PRODUCT MANUFACTURING |
| 2024-06-24 | Voestalpine Giesserei Traisen GMBH & Co KG | $2.03M | STEEL FOUNDRIES (EXCEPT INVESTMENT) |
| 2024-02-27 | Abs Machining Inc | $1.69M | MACHINING |
| 2023-04-27 | Liaoning Fu-An Heavy Industry Co.,ltd | $1.55M | STEEL FOUNDRIES |
| 2024-05-08 | Liaoning Fu-An Heavy Industry Co.,ltd | $1.48M | FABRICATION BLADE |
| 2025-12-04 | Pullman SST, Inc. | $1.40M | POURED CONCRETE FOUNDATION AND STRUCTURE CONTRACTORS. |
| 2025-06-25 | RMH Industries | $1.08M | MACHINE SHOPS SERVICES. |
| 2024-05-24 | Fabspec Inc | $1.05M | FABRICATION HALF DISCHARGE RING HOUSING |
| 2024-01-24 | LPTS, Proizvodnja Ulitkov in Modelov D.O.O. | $1.00M | STAY VANE EXTENSION ASSEMBLY |
| 2025-06-27 | Osi Precision Inc | $865.6K | MACHINE SHOPS SERVICES. |
| 2024-03-04 | Abs Machining Inc | $854.1K | OUTER HEADCOVER MACHINING |
| 2024-01-26 | Fabspec Inc | $805.9K | DISCHARGE RING HOUSING |
| 2025-11-21 | Hancock Sandblast & Paint, LLC | $761.0K | PAINTING AND WALL COVERING CONTRACTORS. |
| 2024-05-10 | Liaoning Fu-An Heavy Industry Co.,ltd | $756.8K | FABRICATION OF RUNNER HUB |
| 2026-01-07 | Eurobearings SRL | $697.2K | ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING. |
| 2024-05-14 | 3075109 Canada Inc | $652.3K | AIR COOLER |
| 2023-12-27 | Osi Precision Inc | $634.3K | LEVER FINAL MACHINING U1, U2 |
| 2025-03-28 | Adelard Soucy 1975 Inc | $521.2K | ALL OTHER MISCELLANEOUS MANUFACTURING |
| 2024-08-08 | Donako Spolka Z Ograniczona Odpowiedzialnoscia | $447.0K | MOTOR AND GENERATOR MANUFACTURING |
| 2025-10-31 | Bluegrass Concrete Cutting Inc | $444.3K | SITE PREPARATION CONTRACTORS. |
| 2025-09-12 | RMH Industries | $407.3K | MACHINE SHOPS SERVICES. |
| 2023-05-08 | Liaoning Fu-An Heavy Industry Co.,ltd | $401.2K | STEEL FOUNDRIES (EXCEPT INVESTMENT) |
31 actions since 2023-03-14. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-16 | A00011 | Supplemental agreement (work within scope) | $412.0K | MCNARY TURBINE REPLACEMENT, UNITS 1-14 WICKET GATE ADJ. AND FIXED MODIFICATION |
| 2026-05-07 | P00034 | Change order | $842.2K | MCNARY TURBINE REPLACEMENT, UNITS 1-14 |
| 2026-03-11 | A00010 | Supplemental agreement (work within scope) | $0 | MCNARY TURBINE REPLACEMENT, UNITS 1-14 |
| 2026-02-06 | P00033 | Supplemental agreement (work within scope) | $42.7K | CONSTRUCTION PROJECT: MCNARY TURBINE REPLACEMENT, UNITS 1-14 SUPPLEMENTAL MODIFICATION CR026 - GENERATOR MAIN AND NEUTRAL LEADS |
| 2025-12-05 | A00009 | Supplemental agreement (work within scope) | $0 | A00009 CR019 MILESTONE ADJUSTMENTS & NTP EXT |
| 2025-11-20 | P00032 | Option exercised | $66.64M | MNA TURBINE REPLACEMENT EXERCISE AND FULLY FUND OPTIONAL CLINS 1104, 1106AB, 1107AB, & 1108AB AND ADD FY 26 FUNDING. |
| 2025-10-21 | P00031 | Change order | $65.2K | MNA TURBINE REPLACEMENT MODIFICATION F4 CFD EXTENSION (CR048) |
| 2025-07-17 | P00030 | Change order | $310.9K | MNA TURBINE REPLACEMENT, UNITS 1-14 - ADJUSTABLE HUB SHIPPING MODIFICATION |
| 2025-06-18 | A00008 | Supplemental agreement (work within scope) | $36.4K | TURBINE SHAFT SEAL - ADJ BLADE UNITS |
| 2025-06-04 | P00029 | Change order | $2.93M | MNA TURBINE REPLACEMENT UNITS 1-14 - MODIFICATION |
| 2025-03-31 | PP0001 | Administrative change | $0 | IMPLEMENT EXECUTIVE ORDER 14148 INITIAL RESCISSIONS OF HARMFUL EXECUTIVE ORDERS AND ACTIONS AND CLASS DEVIATION 2025-O0004-REVOCATION OF EXECUTIVE ORDER ON SUSTAINABILITY |
| 2025-03-17 | P00028 | Option exercised | $37.37M | EXERCISE AND FULLY FUND OPTION CLINS 4102, 4103, 4105 & 7102. ALSO TO ADD FY 25 INCREMENTAL FUNDING. |
| 2024-12-23 | P00027 | Change order | $4.09M | MNA SUPPLY AND INSTALL BLADE WATER LUBRICATED TURBINE GUIDE BEARING SYSTEM (BEARING TO SKID) |
| 2024-11-26 | P00026 | Change order | $11.82M | MNA HYDRAULIC DESIGN CHANGES |
| 2024-11-15 | A00007 | Administrative change | $0 | REASSEMBLY OF ADJUSTABLE BLADE UNITS |
| 2024-11-14 | P00025 | Supplemental agreement (work within scope) | $2.06M | 2018 SUSPENSION COST IMPACT MODIFICATION |
| 2024-10-24 | P00024 | Supplemental agreement (work within scope) | $1.79M | MODIFICATION TO SUPPORT CLIN 3012 CHANGES. |
| 2024-07-16 | P00023 | Supplemental agreement (work within scope) | $170.7K | REASSEMBLY OF ADJUSTABLE BLADE UNITS |
| 2024-06-21 | P00022 | Option exercised | $247.0K | EXERCISE OPTION CLIN 3104 |
| 2024-05-17 | P00021 | Option exercised | $82.1K | EXERCISE OPTION CLINS 1106, 1107, AND 1108 |
| 2024-02-06 | A00006 | Administrative change | $229.2K | REASSEMBLY OF ADJUSTABLE BLADE UNITS |
| 2024-01-12 | P00020 | Funding only | $14.42M | INCREMENTAL FUNDING FOR MCNARY TURBINE REPLACEMENT, UNITS 1-14, W912EF18C0001 |
| 2023-12-11 | P00019 | Supplemental agreement (work within scope) | $12.8K | MNA TURBINE REPLACEMENT UNITS 1-14, CR018 COUPON REMOVAL DELAY-BLADE/HUB |
| 2023-11-16 | P00018 | Option exercised | $791.7K | EXERCISE OPTIONAL CLIN 6101 |
| 2023-10-27 | A00005 | Administrative change | $0 | REASSEMBLY OF ADJUSTABLE BLADE UNITS |
| 2023-09-12 | P00017 | Change order | $0 | MODIFICATION TO UPDATE OPTIONAL CLIN TRIGGER & PAYMENT TERMS AND ASSOCIATED TECHNICAL SPECIFICATIONS. |
| 2023-05-05 | P00016 | Option exercised | $2.86M | EXERCISE OPTIONAL CLINS 2106, 3108, 3114, AND 3115 AND INCREMENTALLY FUND CLINS 2005AC AND 2006AC. |
| 2023-04-11 | P00015 | Supplemental agreement (work within scope) | $0 | ACTIVATION OF CLINS 2005AC AND 2006AC, MCNARY TURBINE REPLACEMENT, UNITS 1-14 |
| 2023-03-27 | P00014 | Funding only | $3.47M | INCREMENTAL FUNDING ACTION, MCNARY TURBINE REPLACEMENT, UNITS 1-14 |
| 2023-03-22 | P00013 | Supplemental agreement (work within scope) | $205.5K | MCNARY TURBINE REPLACEMENT UNITS 1-14, CR004 U13 & U14 SPRING BED TB DESIGN |
| 2023-03-14 | P00012 | Supplemental agreement (work within scope) | $788.0K | CR014 ADJUSTABLE BLADE WATER LUBRICATED TURBINE GUIDE BEARING DESIGN, MODIFICATION TO MCNARY TURBINE REPLACEMENT CONTRACT. |