Thalle Construction Co Inc received this contract from W072 Endist Nashville, Department of the Army: $27.81M obligated so far for construction of dams. It runs to 2027-08-24.
Key facts · data as of Oct 21, 2026
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 21, 2026.
Cite this page: SpendQuery, Award W912P521C0015, data as of Oct 21, 2026, https://spendquery.com/award?id=CONT_AWD_W912P521C0015_9700_-NONE-_-NONE-
Thalle Construction Co Inc: all federal awards · Department of Defense: spending · W072 Endist Nashville: what it buys · The follow-on: recompete brief
CONSTRUCTION OF DOWNSTREAM MONOLITHS FOR THE KENTUCKY LOCK, GRAND RIVERS, KENTUCKY
Up for re-bid: ends 2027-08-24. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
67 actions since 2022-10-06. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-17 | P00020 | Supplemental agreement (work within scope) | $1.83M | KENTUCKY LOCK DOWNSTREAM MONOLITHS DOWNSTREAM MONOLITH CONSTRUCTION FOR THE KENTUCKY LOCK, GRAND RIVERS, KENTUCKYCONTRACT COMPLETION DATE 24 AUGUST 2027 |
| 2026-06-17 | A00054 | Supplemental agreement (work within scope) | $230.9K | SCOPE OF WORK A00053 WKR049-2 M10 WATERTIGHT DOOR AND UTILITY EMBEDS (FINAL): THIS MODIFICATION IS FOR PROCURING AND INSTALLING A WATERTIGHT DOOR, PIPE SLEEVES, AND A THRU-WALL BARRIER MOUNTING FRAME AT MONOLITH M10. |
| 2026-06-11 | A00053 | Supplemental agreement (work within scope) | $148.0K | SCOPE OF WORK A00053 WKR049-2 M10 WATERTIGHT DOOR AND UTILITY EMBEDS (FINAL): THIS MODIFICATION IS FOR PROCURING AND INSTALLING A WATERTIGHT DOOR, PIPE SLEEVES, AND A THRU-WALL BARRIER MOUNTING FRAME AT MONOLITH M10. |
| 2026-05-19 | A00052 | Supplemental agreement (work within scope) | $440.0K | SCOPE OF WORK A00052 WKR079 PHASE 3 ROCK STABILIZATION: THIS MODIFICATION IS FOR STABILIZING THE PHASE 3 ROCK NEAR MONOLITH M32 BY REMOVAL OF UNSTABLE MATERIAL, WATER MITIGATION, REBAR DOWELS, FORMWORK, AND CONCRETE OVERPOUR. |
| 2026-05-12 | P00019 | Supplemental agreement (work within scope) | $20.0K | SCOPE OF WORK WKR072-2 BRIDGE PIER AND M17 GALLERY CHANGES (PART I-SUPPLEMENT): RESIZE/SHIFT TWO BRIDGE PIER COLUMNS, ADD ELECTRICAL BLOCK OUT, REBAR QUANTITIES, REBAR INSTALLATION, CONCRETE, CEMENT, FLY ASH, ADD FLOOR HATCH, DRAINPIPE, DRAIN COVERS. |
| 2026-04-23 | P00018 | Supplemental agreement (work within scope) | $140.0K | SCOPE OF WORK WKR100-1 M31 WEDGE TREATMENT (PART I-NTP): THE CONTRACTOR SHALL TIE INTO MONOLITH M31C FROM THE BULL NOSE OF M31 AND ALTERS THE STICK-BUILT WALL ARMOR THAT IS NO LONGER REQUIRED TO TIE INTO THE SEGMENTAL COFFERDAM. |
| 2026-04-15 | P00017 | Supplemental agreement (work within scope) | $0 | SCOPE OF WORK WKR100-1 M31 WEDGE TREATMENT (PART I-NTP): THE CONTRACTOR SHALL TIE INTO MONOLITH M31C FROM THE BULL NOSE OF M31 AND ALTERS THE STICK-BUILT WALL ARMOR THAT IS NO LONGER REQUIRED TO TIE INTO THE SEGMENTAL COFFERDAM. |
| 2026-04-01 | A00051 | Supplemental agreement (work within scope) | $0 | SCOPE OF WORK WKR098 WEATHER TIME EXTENSION JUL 2025-JAN 2026. THIS MODIFICATION EXTENDS TIME FOR DELAYS CAUSED BY ADVERSE WEATHER DURING THE PERIOD 01 JULY 2025 THROUGH 31 JANUARY 2026. |
| 2026-02-23 | P00016 | Supplemental agreement (work within scope) | $20.0K | SCOPE OF WORK BRIDGE PIER M17 GALLERY CHANGES WKR072THIS MODIFICATION CHANGES QUANTITIES OF REBAR, REBAR INSTALLATION, CONCRETE, CEMENT, AND FLY ASH, PLUS ADDS A FLOOR HATCH AND LADDER LEADING INTO THE GALLERY. |
| 2026-02-09 | A00050 | Supplemental agreement (work within scope) | $23.3K | SCOPE OF WORK WKR062 M17, M19, M20 DRAIN: THIS MODIFICATION INCREASES THE DRAIN SIZE TO MITIGATE WATER DRAINAGE POOLING BETWEEN THE NEW LOCK AND EXISTING LOCK. |
| 2026-01-08 | P00015 | Supplemental agreement (work within scope) | $50.0K | SCOPE OF WORK WKR096-1 U1 WALL ARMOR-CAISSON CONFLICT (PT. I NTP): THIS MODIFICATION ADDS A PERMANENT PINTLE GREASE LINE AND PROVIDES SPECIFICATIONS FOR TOLERANCES, INSTALLATION REQUIREMENTS, FIELD TESTS, AND INSPECTIONS. |
| 2025-12-22 | A00049 | Supplemental agreement (work within scope) | $75.0K | SCOPE OF WORK WKR096-1 U1 WALL ARMOR-CAISSON CONFLICT (PT. I NTP) |
| 2025-11-24 | A00048 | Supplemental agreement (work within scope) | $82.1K | CASES WKR048, -081, -084, -085, -091, -092, -094 MODIFICATION A00048 "L14 WALL & U2M/U2L FMB ELEV., HOSE CABINET RELOCATION, EPOXY GROUT CREDIT, CULVERT BULKHEAD GRATING SUPPORT, M31 JT REDUCTION, KEYWAY FORMWORK REDESIGN, LIFT STATION CLEANOUT" |
| 2025-11-13 | P00014 | Supplemental agreement (work within scope) | $1.25M | CASE WKR088 MODIFICATION P00014 "QV-EXCAVATION AND DENTAL" |
| 2025-10-21 | P00013 | Supplemental agreement (work within scope) | $3.03M | CASE WKR017 MODIFICATION P00013 "BULKHEAD RECESS METALS & GALLERY GUTTER" |
| 2025-09-30 | A00047 | Supplemental agreement (work within scope) | $126.6K | CASE WKR077, WKR090 MODIFICATION A00047 "U1 ANCHOR CHANGE & US 2ND STAGE JOINT PREP" |
| 2025-09-10 | A00046 | Supplemental agreement (work within scope) | -$67.0K | CASE WKR073, WKR080, WKR086 MODIFICATION A00046 "ACTIVE WELD, WALL ARMOR, CSG CHANGE" |
| 2025-09-03 | A00045 | Supplemental agreement (work within scope) | $195.5K | CASE WKR058 MODIFICATION A00045 "CONTROL STAND GALLERY EXTENSIONS" |
| 2025-08-26 | A00044 | Supplemental agreement (work within scope) | $60.0K | CASE WKR049-1 MODIFICATION A00044 "M10 WATERTIGHT DOOR & UTILITY EMBEDS" |
| 2025-08-22 | A00043 | Supplemental agreement (work within scope) | $47.6K | CASE WKRO78-1 MODIFICATION A00043 C31-C32 OUTLET WORKS GEOMETRY (PART 1-NTP) |
| 2025-07-30 | A00042 | Supplemental agreement (work within scope) | $0 | CASE WKRO87 MODIFICATION A00042 "WEATHER TIME EXTENSION MAY 25-JUN 25" |
| 2025-07-24 | A00041 | Supplemental agreement (work within scope) | -$226.0K | WKR074 A00041 "HIGH MAST LIGHTS DESCOPE" |
| 2025-07-10 | A00040 | Supplemental agreement (work within scope) | $17.0K | CASE WKR075 MODIFICATION A00040 "U1M CAISSON CHANGES" |
| 2025-06-02 | A00039 | Supplemental agreement (work within scope) | $0 | CASE WKR076 MODIFICATION A00039 "WEATHER TIME EXTENSION JAN 25-APR 25" |
| 2025-05-19 | A00038 | Supplemental agreement (work within scope) | $6.0K | CASE WKR063 MODIFICATION A00038 DRILLED SHAFT M21-P5 STEEL OBSTRUCTION |
| 2025-04-23 | A00037 | Supplemental agreement (work within scope) | $13.9K | CASE WKRO61 MODIFICATION A00037 PARTNERING COSTS 2025 |
| 2025-04-17 | A00036 | Supplemental agreement (work within scope) | $59.2K | CASE WKRO45 MODIFICATION A00036 FMB AIRLINES |
| 2025-04-10 | A00035 | Supplemental agreement (work within scope) | $78.0K | CASE WKRO57 WATERSTOP CHANGES, CASE WKR053 BACKFILL PHASE 1, MODIFICATION A00035 |
| 2025-03-20 | A00034 | Supplemental agreement (work within scope) | $150.9K | CASE WKR060 AND WKR070 MODIFICATION "MISC. MECHANICAL REPAIRS & ADDT'L JANITORIAL SERVICES" |
| 2025-03-05 | A00033 | Supplemental agreement (work within scope) | $235.5K | CASE WKR065 MODIFICATION A00033 CAISSON EMBEDS & U1R METALS |
| 2025-02-19 | A00032 | Supplemental agreement (work within scope) | $0 | CASE WKR067 MODIFICATION A00032 WEATHER TIME EXTENSION OCT 2024-DEC 2024 |
| 2025-02-04 | P00012 | Supplemental agreement (work within scope) | $701.4K | CASE WKR040 MODIFICATION P00012 M22-M25 & M30-M31 RECONFIGURATION |
| 2025-01-07 | A00031 | Supplemental agreement (work within scope) | $390.7K | WKR041 A00031 L29 & M29 MACHINERY ROOM CHANGES |
| 2024-12-23 | P00011 | Supplemental agreement (work within scope) | $1.26M | WKRO39 MODIFICATION P00011 GATE SPRAY INTAKE & TRASH RACKS INSTALL |
| 2024-12-02 | P00010 | Supplemental agreement (work within scope) | $2.28M | CASE WKR018 MODIFICATION P00010 M31 JOINT TREATMENT |
| 2024-11-21 | A00030 | Supplemental agreement (work within scope) | $114.3K | CASES WKR044, WKR047, WKR066 MODIFICATION A00030 CONTACT BLOCK, L32 BEAM SEAT REMOVAL, M19-P7 REMEDIATION |
| 2024-11-13 | P00009 | Supplemental agreement (work within scope) | $4.22M | CASE WKR019 MODIFICATION P00009 MISCELLANEOUS METALS |
| 2024-10-21 | A00029 | Supplemental agreement (work within scope) | $0 | CASE WKR064 MODIFICTAION A00029 WEATHER TIME EXTENSION JULY 2024-SEPTEMBER 2024 |
| 2024-10-10 | A00028 | Supplemental agreement (work within scope) | $75.2K | CASE WKR024 MODIFICATION A00028 DRILLED SHAFTS REDESIGN |
| 2024-09-18 | A00027 | Supplemental agreement (work within scope) | $79.0K | CASE WKR055 MODIFICATION A00027 SFTP DATA TRANSITION |
| 2024-08-20 | A00026 | Supplemental agreement (work within scope) | $32.2K | CASE WKR056 MODIFICATION A00026 RISK MANAGEMENT PARTNERING COSTS 2024 |
| 2024-08-15 | A00025 | Supplemental agreement (work within scope) | $0 | CASE WKR059 MODIFICATION A00025 WEATHER TIME EXTENSION APRIL-JUNE 2024 |
| 2024-08-12 | A00024 | Supplemental agreement (work within scope) | $11.9K | CASE WKR052 MODIFICATION A00024 "STAFF GAGES & L28/M28 PROTECTION" |
| 2024-07-03 | A00023 | Supplemental agreement (work within scope) | $29.7K | CASE WKR051 MODIFICATION A00023 "CAISSON RECESS FILLER HANGER BEVELING" |
| 2024-06-17 | P00008 | Supplemental agreement (work within scope) | $988.0K | CASE WKR054 MODIFICATION P00008 "QV-6-IN DRILLED SHAFTS" |
| 2024-05-01 | A00022 | Supplemental agreement (work within scope) | $0 | CASE WKR050 MODIFICATION A00022 "WEATHER TIME EXTENSION JAN 2024-MAR 2024" |
| 2024-04-12 | A00021 | Supplemental agreement (work within scope) | $408.9K | CASE WKR043 MODIFICATION A00021 "DRILLED SHAFT BEAM STIFFENERS" |
| 2024-03-25 | A00020 | Supplemental agreement (work within scope) | $421.4K | CASE WKR046 MODIFICATION A00020 "MISCELLANEOUS METALS MATERIALS" |
| 2024-02-13 | A00019 | Supplemental agreement (work within scope) | $13.7K | CASE WKR037 MODIFICATION A00019 "PARTNERING COSTS 2024" |
| 2024-02-08 | A00018 | Supplemental agreement (work within scope) | $0 | CASE WKR042 MODIFICATION A00018 "WEATHER TIME EXTENSION NOV 2021-DEC 2023" |
| 2024-01-25 | A00017 | Supplemental agreement (work within scope) | $350.0K | CASE WKR031 MODIFICATION A00017 "FMB BLOCKOUT REINFORCEMENT INSTALLATION" |
| 2024-01-11 | A00016 | Supplemental agreement (work within scope) | $16.2K | CASE WKR035 MODIFICATION A00016 EXISTING SEWER LINE INSULATION REPAIRS |
| 2023-12-20 | A00015 | Supplemental agreement (work within scope) | $106.0K | GATE SPRAY MATERIAL |
| 2023-12-04 | A00014 | Supplemental agreement (work within scope) | $158.2K | CASE WKR022, WKR023 MODIFICATION A00014 "LIFT STATION, FLOW METERS, PARTNERING" |
| 2023-11-06 | A00013 | Supplemental agreement (work within scope) | -$46.3K | CASE WKR032, WKR033, WKR036 MODIFICATION A00013 "PIEZOMETER, TILTMETER, WALL ARMOR REPAIR" |
| 2023-07-31 | A00012 | Supplemental agreement (work within scope) | $157.5K | CASE WKR029 MODIFICATION A00012 "FMB BLOCKOUT REINFORCEMENT MATERIAL" |
| 2023-06-29 | P00007 | Supplemental agreement (work within scope) | $4.22M | CASE WKR027 MODIFICATION P00007 "QUANTITY VARIATION-MUD MAT CONCRETE" |
| 2023-06-12 | P00006 | Supplemental agreement (work within scope) | $3.16M | MODIFICATION P00006 CASE WKR028 "QV-EXCAVATION AND LINE DRILLING" |
| 2023-05-26 | P00005 | Supplemental agreement (work within scope) | $932.6K | CASE WKRO15 MODIFICATION P00005 "FMB EMBEDDED METALS" |
| 2023-05-19 | A00011 | Supplemental agreement (work within scope) | $169.8K | CASE WKR023 MODIFICATION A00011 "RELOCATE MITER GATE MANHOLES" |
| 2023-04-24 | A00010 | Supplemental agreement (work within scope) | $15.6K | CASE WKR021 MODIFICATION A00010 "INSTRUMENTATION SENSORS, GATE FOBS, AND ATS REPAIR" |
| 2023-04-20 | A00009 | Supplemental agreement (work within scope) | $98.4K | CASES WKR016 AND WKR020 MODIFICATION A00009 "BIL SIGNAGE, TYPE 1L CEMENT TESTING, JIB CRANE REPAIRS, AND AERIAL PHOTOS" |
| 2022-12-28 | A00008 | Supplemental agreement (work within scope) | $10.0K | CASE WKR017 MODIFICATION A00008 PARTNERING COSTS 2023 |
| 2022-11-30 | A00007 | Supplemental agreement (work within scope) | $433.1K | CASE WKR010 MODIFICATION A00007 DATA MANAGEMENT VISUALIZATION |
| 2022-11-16 | P00004 | Supplemental agreement (work within scope) | -$1.30M | CASE WKR011 MODIFICATION P00004 CULVERT LINER ANGLE DELETION |
| 2022-11-07 | A00006 | Supplemental agreement (work within scope) | $169.6K | CASE WKR013 MODIFICATION A00006 COFFERDAM CELL 1 BANDING ADDITION |
| 2022-10-06 | A00005 | Supplemental agreement (work within scope) | $82.2K | CASE WKR012 MODIFICATION A00005 "ADDITIONAL GOVERNMENT UTV'S |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗