W912UM26FA021↗
Leo a Daly/Burns & Mcdonnell Far East Joint Venture received this contract from W2SN Endist Far East, Department of the Army: $8.14M obligated so far for architect and engineering- construction: recreational buildings. It runs to 2027-03-19.
Key facts · data as of Oct 25, 2026
- Recipient
- Leo a Daly/Burns & Mcdonnell Far East Joint Venture
- Awarding agency
- Department of the Army (Department of Defense)
- Contracting office
- W2SN Endist Far East (W912UM)
- Obligated to date
- $8.14M
- Potential value
- $8.14M
- Ends
- 2027-03-19
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.
Cite this page: SpendQuery, Award W912UM26FA021, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_AWD_W912UM26FA021_9700_W912UM23D0004_9700
Leo a Daly/Burns & Mcdonnell Far East Joint Venture: all federal awards · Department of Defense: spending · W2SN Endist Far East: what it buys · The follow-on: recompete brief
A-E SHALL PROVIDE PREPARATION OF 100% DESIGN DOCUMENTS FOR CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY, PHASE I, OSAN AIR BASE, KOREA AND PERFORM ALL SERVICES REQUIRED IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW), DATED 4 NOVEMBER 2025.
Up for re-bid: ends 2027-03-19. Recompete brief → · GEOTECHNICAL DRILLING AND SAMPLING, IN-SITU TESTING, AND GEOPHYSICAL INVESTIGATION AT VARIOUS LOCATIONS, REPUBLIC OF KOREA (ROK) ↗
What it is
- Product or service
- Architect and Engineering- Construction: Recreational Buildings (PSC C1FB)
- Industry
- Engineering Services (NAICS 541330)
- Contracting office
- W2SN Endist Far East (W912UM)
- Competition
- Full and open competition · 6 offers received
- Pricing
- Firm fixed price
- How it was bought
- Multiple-award IDIQ · under W912UM23D0004
- Where the work is
- KOR
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Every action
2 actions since 2026-03-18. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-05-07 | P00001 | Supplemental agreement (work within scope) | $0 | A-E SHALL PROVIDE PREPARATION OF 100% DESIGN DOCUMENTS FOR CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY, PHASE I, OSAN AIR BASE, KOREA AND PERFORM ALL SERVICES REQUIRED IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW), DATED 26 MARCH 2026. |
| 2026-03-18 | 0 | $8.14M | A-E SHALL PROVIDE PREPARATION OF 100% DESIGN DOCUMENTS FOR CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY, PHASE I, OSAN AIR BASE, KOREA AND PERFORM ALL SERVICES REQUIRED IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW), DATED 4 NOVEMBER 2025. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-25). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗